Loading...
ElevationsLEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" BC AD METAL PANEL FIELD COLORSTOREFRONT METAL PANEL ACCENT COLOR METAL ROOOF PANEL ACCENT COLOR METAL ROOOF PANEL ACCENT COLOR LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" B C D METAL PANEL FIELD COLORSTOREFRONT METAL PANEL ROOF ACCENT COLOR HOLLOW METAL DOOR LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" 123456789 METAL PANEL FIELD COLOR STOREFRONT METAL ROOF PANEL ACCENT COLOR OVERHEAD COILING DOOR HOLLOW METAL DOORSTOREFRONTHOLLOW METAL DOOR BOLLARD LEVEL 1 0' -0" LEVEL 1 0' -0" LEVEL 2 12' -0" LEVEL 2 12' -0" 1 2 3 4 5 6 7 8 9 METAL PANEL ACCENT COLOR METAL ROOF PANEL ACCENT COLOR STOREFRONT STOREFRONT ENTRANCEMETAL PANEL FIELD COLORBOLLARDOVERHEAD COILING DOORHOLLOW METAL DOOR Date Project Number 2775 W. Navigator Drive Suite #220 Meridian, ID 83642 208.616.1050 CONSULTANT STAMP SHEET TITLE SHEET NUMBER COPYRIGHT © 2019 6/29/2021 11:34:02 AMP201 EXTERIOR ELEVATIONS2640 E. LanarkADVANCED HEATING AND COOLING06.28.2021 Project Number Project Status No. Description Date 1/8" = 1'-0"1 EAST ELEVATION 1/8" = 1'-0"2 WEST ELEVATION 1/8" = 1'-0"3 NORTH ELEVATION 1/8" = 1'-0"4 SOUTH ELEVATION 5 FRONT PERSPECTIVE 6 BIRDS EYE PERSPECTIVE