Loading...
CC - Parking/Traffic Analysis Charlene Way From:Sonya Allen Sent:Tuesday, August 31, 2021 11:02 AM To:Adrienne Weatherly; Charlene Way; Chris Johnson Subject:FW: Woodcrest Townhomes Parking Analysis Attachments:26880_WoodcrestTownhomes_Parking.pdf From: andrew@bawce.com <andrew@bawce.com> Sent: Tuesday, August 31, 2021 10:57 AM To: Sonya Allen <sallen@meridiancity.org>; 'Blaine Womer' <blaine@bawce.com> Subject: RE: Woodcrest Townhomes Parking Analysis External Sender - Please use caution with links or attachments. Sonya, Please find attached the traffic analysis for Woodcrest. In general, the report finds that there is currently sufficient parking within the existing commercial lots and the townhome site plan provides adequate parking capacity for the estimated demand for the 19 unites. Please let me know if you have any questions. Thank you, Andrew 1 IKSouth Capitol Boulevard,Suite 600 K I TT E LS O N Boise,ID 83702 &ASSOCIATES P 208.338.2683 MEMORANDUM August 31, 2021 Project #: 26880.0 To: Don Newell, Landmark Pacific Investors, LLC PO Box 1939 Eagle, ID 83616 Cc: Blaine Womer and Andrew Womer, Blaine A., Womer Civil Engineering From: Nick Foster, AICP, RSPi RE: Woodcrest Townhomes This memorandum summarizes the results of a parking analysis performed for the proposed Woodcrest Townhomes development in Meridian, Idaho. It addresses the following topics: ■ Estimated parking demand for the proposed development ■ Existing parking supply and demand on adjacent commercial lots PROJECT DESCRIPTION The proposed Woodcrest Townhomes development consists of 19 townhomes. It would be located southwest of Hickory Way, east of Grapewood Drive, and north of Fairview Avenue. Figure 1 illustrates the project location. Proposed Site i8!• ea n,� r x i Figure 1 Project Location Kittelson&Associates,Inc. Project#: 26880.0 Woodcrest Townhomes ESTIMATED PARKING DEMAND The project team used the Institute of Transportation Engineers (ITE) publication Parking Generation, 4th Edition to estimate the parking demand of the proposed Woodcrest Townhomes development. Table 1 illustrates the estimated parking demand during a typical weekday peak period. The weekday period is shown as the manual notes that parking demand typically peaks for townhomes during weekdays, so parking demand would be expected to be less during the weekend. Table 1 Estimated Peak Weekday Parking Demand Land Use ITE Parking Demand ..- (Spaces) Townhouse 230 19 27 The peak parking demand is expected to be 27 vehicles. Based on the current site plan, shown in Attachment "A," the development is expected to provide more than 27 off-street spaces (i.e., 40 spaces from 12 townhomes with 2-car garages (24 spaces), 7 townhomes with single-car garages (7 spaces), and 9 dedicated off-street spaces). EXISTING ADJACENT PARKING SUPPLY AND DEMAND The project team inventoried parking supply and demand at four adjacent commercial properties. The project team coordinated with the owner of Louie's Pizza & Italian Restaurant to understand when demand peaks at the restaurant. These lots were inventoried during weekday and weekend peak periods covering both the lunch (i.e., 12 - 1 p.m.) and evening (i.e., 5-8 p.m.) periods in August 2021 on the days when business is typically the busiest at the restaurant. Figure 2 illustrates the four lots evaluated. Attachment "B" contains the complete parking data inventory. Kittelson&Associates,Inc. Page: 2 of 1 Project#: 26880.0 Woodcrest Townhomes r, ,R� Ir7 da '1_,a� •1�Lia r . ... - Earth Figure 2 Parking Lots Inventoried Table 2 summarizes the peak parking demand at each lot. Table 2 Observed Parking Supply and Demand opo Is Observed Demand (Spaces Occupied)' Capacity Weekday Weekday Weekend Weekend Lot (Spaces)' - Evening Yellow 21 (2) 14 (0) 14 (0) 7 (0) 4 (0) Blue 100 (3) 65 (3) 69 (3) 14 (0) 57 (2) Green 26 (1) 6 (0) 3 (0) 0 (0) 4 (0) Red 23 (2) 8 (0) 4 (0) 0 (0) 4 (0) Total 170 (8) 93 (3) 90 (3) 21 (0) 69 (2) Available Capacity 77 (5) 80 (5) 149 (8) 101 (6) 'Accessible parking stalls are shown in parentheses (#) Parking utilization of the individual commercial lots ranges from Oho to 69%. Kittelson&Associates,Inc. Page: 3 of 1 Project#: 26880.0 Woodcrest Townhomes The subdivision containing these lots has a cross-parking agreement. Therefore, we examined combined parking supply and availability. Overall, parking utilization across the four lots combined ranges from a low of about 12% during the weekend lunch (12 - 1 p.m.) period to a high of approximately 55% during the weekday lunch (12- 1 p.m.) period. There was observed to be more than 70 available spaces across the four lots during each observed period. SUMMARY There is currently sufficient parking within the existing commercial lots to handle their typical weekday and weekend peak demands. No lot was observed to be over 70% full during this study. The current site plan for the proposed Woodcrest Townhomes development also provides adequate capacity for the estimated typical peak parking demand for 19 townhomes. Kittelson&Associates,Inc. Page: 4 of 1 Attachment A Proposed Site Plan HIc- < L. 0� • N/C/fOR y�q�E � O ' / L L / GI r G / o .f ' < / \ < f j %�x/ �.. o COMMON 0 20 40 60 :�- :�',�.'t.r�::•.,�•Yam..'::. \ \ L ov / / .j.t}}�o;;'a' ',:;;. 1`i:..i.<' �° Y;�ti•z \ /p��H2O L s� o BUILDABLE LOTS: 19 p d •��•. vN�1/ �L, r4 '.ti rt;";:'�.:,. ,:1:••i:;.','uY;�:y.:':•'.`'7•. ;M.ti. ::. ..sit. `'�'-:' .:,v> >r`.•_,.:•. it:::*: / is ,J'!•.. 'is N / S:p•,. ;:,x,. d°r ''}t'-•,yit';k'�':•,. .rhaifo' / p i�f.. :XS".�;:,a:�.J.� � 'y:'i,j'.��� �:y(`:.:'.,f_:'[�l,•'ki"�;.:.r'f:f:J:iU g N{+ag� ss� r'!�:•:;I.i•d.�4�?. Q '9 :rn•.i:i'%<�=::is :>i� � g°C N `+' 8'' •e • .:t}�.'. y: :.'t`t.;t .'Yy�y::.� �'h a� :<'r4Q J•t' � / d' sP �.5�.•` t. Yfv't.'�.,{,'t :F'�:��. ,.:i'?•:x.'•' -v V° �°d' a:3" I / 'my ,i.0 go-, �.,�.::'�'•:•.:>..`•^: 140 ''y }•':::.t"• ;:�:" r=i;�_'ii..: ;is.. :..�f4�':��` ,i t:•. ': �•�' '•*,'3�i'�:C:-•''''�'�y:?' "i� `gym. yr' o / .Y::4:,-t :•fi•7}�• `/1.:t.: r��l���t"Mal:�::,:.-.•�::�;..' v� ;:i 8 /i'4g 1. COMMON lie ASPHALT PATHWAYTH I ,�+ fit. i .4):. :�: yy:,��•JS';;`r!v\".w� [.w.;�fib,,..•:• /.;e,'�i;^~•'.' / `yi,5�e<�'i'l'v� / i)�•i1.:'.1)„ni.l,.fir,:.. _r /\ '��'°A C•;}, / I € / \ \ � • GAZEBO I of �. F,.:t,:.,•:.,;.,., �\� � /� `' WMGN °"�I 9p I l,RY',:tl^. Y:4.C':�:•:'4:::.;!••). / 45.00 5 PARKING STALLS M gg a — — � I d. s< , I 4 I x i•- rU , , - F� •-7• u 'o' I N I vwx:w i - X r't I I I N G7 r - _ - - - - - _ - - - - - - - - - - - - - - - - _ [ —L — — — — — — — — — — — — — — J tic � 1 1. .G,.: �• c, L. 'L< < I '/ G , 1 .. '1.' , i c < c: EP Fp EP4EP EP EP EP EP EP EP N \ x p — O2H O2H `H O2H O2H O OdH H o2H o2H oZH o2H ❑2H o2H o2H o2H o2H o2H ❑2H o2H ❑ZH o2H ❑2H o2H o2H o2H 02H o2H 02H 02H ❑2H 02H ❑2H 02H ❑2H 02H 02H 02H 02HV 02H 02H I I A ey ll� d3 d3 H2O—H2O \ r I p Z: DRAWINGS N1420004 CAD EXHIBITS CONCEPT PLAN.DWG SEAL—ENGINEER BENCHMARK SHEET N❑, CITY OF MERIDIAN, ID 1 OF 1 NOTE •PLANNING Know what s below, WORK CONTAINED WITHIN THESE PLANS BLAINE A. WO M E R •SURVEYING W00 DC R EST TOW N H 0 M ES SUBDIVISION SHALL NOT COMMENCE UNTIL AN CIVIL ® Call before you dig. ENCROACHMENT PERMIT AND/OR A A CIVIL ENGINEERING ENGINEERING CONCEPT PLAN FILE N y � GRADING PERMIT HAS BEEN ISSUED W. 0 PUBLIC woxxs MARK N 1420004 BY DATE APPR: DATE Boise, ID 83706, 4355 W. Emerald Street, Suite 145 REVISIONS SCALE ENGINEER COUNTY H; V Attachment B Parking Lot Inventory m L2 Data Collection Project: KITT0214 MER Parking Tech: Judd Location: Meridian, Idaho Date &Time Yellow Lot Blue Lot Green Lot Red Lot Saturday-6:30PM 4 57 2-H 2-CP 4 3 Saturday-7:30PM 4 48 1-H 2-CP 3 2 Sunday- 12:30PM 7 14 1-CP 0 0 Wednesday- 12:30PM 14 65 3-H 1-CP 6 8 Wednesday-5:30PM 14 50 3-H 1-CP 2 1 Wednesday-6:30PM 8 65 3-H 3-CP 3 0 Wednesday-7:30PM 3 69 3-H 1-CP 1 4 Available Spaces 21 100 26 23 Handicapped Spaces 2 3 1 2 Other Spaces 7 Curb Pickup { N `.' 14L - y �A I Googly Earth 02021 Google ���' �J`� "`�"�`'� 300 ft -