Loading...
PZ - PreApp Notes �T Planning Division E IDIA �1 �'' PREAPPLICATION MEETING DAHO Type of Review Requested Pre-Application Request File number: P REAP P-2021-0022 Assigned Planner: Sonya Allen Scheduled Date: 04/20/2021 Scheduled Time: 8:30 AM Applicant Information Name: KRISTEN MCNEILL, THE LAND GROUP, INC. Address: 462 E SHORE DR SUITE 100 83616 Phone. Email: kmcneill@thelandgroupinc.com Additional Attendee(s) Name: Jason Densmer Business Name: The Land Group Inc Address: 462 E Shore Dr, Ste 100 Eagle, ID 83616 Phone: 2089394041 Email: jason@thelandgroupinc.com Subject Property Information Location/street address: Assessor's parcel number S1223120955 (s): Township, range, section: 3N1 W23 Project Description Project/Application Name: Southridge Apartments Ph 3 - CUP Description of Work: CUP Application for Southridge 3 apartments Application Information APPLICATION TYPES Conditional Use Permit -CUP: CHECKED PROJECT INFORMATION I acknowledge pre-app notes are good for 4 months: CHECKED PROPERTY INFORMATION Current Land Use: vacant Prior Approvals (File Numbers): H-2020-0109 TYPE OF USE PROPOSED Multi-Family: CHECKED 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website:www.meridaincity.org 1 ZONING DISTRICT(S) R-15: CHECKED Review Type Reviewer Review Notes Addressing Plan Review Notes Ryan Beecroft Addressing will follow the same sequence as the first 2 phases. Each building will have its own unique address off of S Grand Fork Way Building Plan Review Notes Bret Caulder Proposed buildings to comply with the 2018 IBC Land Development Plan Review Seth Oaks See LD Notes Notes MPD Plan Review Notes Scott Colaianni In addition, all buildings must have numbers (or letters) displayed prominently so police, fire and paramedics can quickly find a building number and unit number day or night. Finally, placing wayfinding signs for the whole complex at each entrance. Parks Plan Review Notes Sonya Allen No comments submitted - SA Planning Review Notes Sonya Allen * Comply w/terms of existing DA (#2021-018471, H-2020- 0109) *CUP for MFR development in R-15 district; comply with specific use standards in UDC 11-4-3-27 * Comply with the dimensional standards for the R-15 district in UDC Table 11-2A-7 * Comply with qualified open space & site amenity standards in UDC 11-3G-3 *All structures shall comply with the design standards in the Architectural Standards Manual and the design guidelines in the TMISAP. * Comply with parking standards in effect at the time of application submittal (an amendment to parking standards is currently in process) Wastewater Plan Review Notes Tyson Glock • Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle walls, fences, infiltration trenches, light poles, etc.) are built within the utility easement. • Ensure no services cross infiltration trenches • Flow is commiteed Water Plan Review Notes Kyle Radek Second water connection must be made at this phase- either south to existing water on Grand Fork Way, or west through future apartments phase to Overland. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website:www.meridaincity.org 2