PZ - PreApp Notes �T Planning Division
E IDIA �1 �'' PREAPPLICATION MEETING
DAHO
Type of Review Requested
Pre-Application Request File number: P REAP P-2021-0022
Assigned Planner: Sonya Allen
Scheduled Date: 04/20/2021 Scheduled Time: 8:30 AM
Applicant Information
Name: KRISTEN MCNEILL, THE LAND GROUP, INC.
Address: 462 E SHORE DR SUITE 100 83616
Phone. Email: kmcneill@thelandgroupinc.com
Additional Attendee(s)
Name: Jason Densmer Business Name: The Land Group Inc
Address: 462 E Shore Dr, Ste 100 Eagle, ID 83616
Phone: 2089394041 Email: jason@thelandgroupinc.com
Subject Property Information
Location/street address:
Assessor's parcel number S1223120955
(s):
Township, range, section: 3N1 W23
Project Description
Project/Application Name: Southridge Apartments Ph 3 - CUP
Description of Work: CUP Application for Southridge 3 apartments
Application Information
APPLICATION TYPES
Conditional Use Permit -CUP: CHECKED
PROJECT INFORMATION
I acknowledge pre-app notes are good for 4 months: CHECKED
PROPERTY INFORMATION
Current Land Use: vacant
Prior Approvals (File Numbers): H-2020-0109
TYPE OF USE PROPOSED
Multi-Family: CHECKED
33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website:www.meridaincity.org
1
ZONING DISTRICT(S)
R-15: CHECKED
Review Type Reviewer Review Notes
Addressing Plan Review Notes Ryan Beecroft Addressing will follow the same sequence as the first 2
phases. Each building will have its own unique address off of
S Grand Fork Way
Building Plan Review Notes Bret Caulder Proposed buildings to comply with the 2018 IBC
Land Development Plan Review Seth Oaks See LD Notes
Notes
MPD Plan Review Notes Scott Colaianni In addition, all buildings must have numbers (or letters)
displayed prominently so police, fire and paramedics can
quickly find a building number and unit number day or night.
Finally, placing wayfinding signs for the whole complex at
each entrance.
Parks Plan Review Notes Sonya Allen No comments submitted - SA
Planning Review Notes Sonya Allen * Comply w/terms of existing DA (#2021-018471, H-2020-
0109)
*CUP for MFR development in R-15 district; comply with
specific use standards in UDC 11-4-3-27
* Comply with the dimensional standards for the R-15 district
in UDC Table 11-2A-7
* Comply with qualified open space & site amenity standards
in UDC 11-3G-3
*All structures shall comply with the design standards in the
Architectural Standards Manual and the design guidelines in
the TMISAP.
* Comply with parking standards in effect at the time of
application submittal (an amendment to parking standards is
currently in process)
Wastewater Plan Review Notes Tyson Glock • Ensure no permanent structures (trees, bushes, buildings,
carports, trash receptacle walls, fences, infiltration trenches,
light poles, etc.) are built within the utility easement.
• Ensure no services cross infiltration trenches
• Flow is commiteed
Water Plan Review Notes Kyle Radek Second water connection must be made at this phase- either
south to existing water on Grand Fork Way, or west through
future apartments phase to Overland.
33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208)884-5533 • Facsimile: (208)888-6854 • Website:www.meridaincity.org
2