Loading...
CC - Engineer Statement km E N G I N E E R I N G July 15, 2021 Project No.21-025 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Apex Southeast Subdivision No.3 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Apex Southeast Subdivision No. 3 are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical engineering report, "Apex Subdivisions NW &SE Phase 2", prepared by Atlas and dated April 5, 2021, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP SS�pNAL fN G� ,\CENSe Digitally signed by 6860 Lachlin C Kinsella, P.E. s 7/15/21 o Date: 2021 .07.15 �Cy TF OF �oP�� 17:16:56 -06100' /N C Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way • Boise,Idaho 83713 208.639.6939 • kmengllp.com