ACHD Transmittal (A-2021-0121)Applicant name:BRUCE TAYLOR, JENSEN BELTS ASSOCIATES Phone:
Applicant address:1509 TYRELL LANE, STE 130, BOISE, ID 83706 Email:bruce@jensenbelts.com
Owner name:MIKE BARTON, MERIDIAN PARKS AND RECREATION Phone:Fax:083437178
Owner address:33 E BROADWAY AVE., MERIDIAN, ID 83642 Email:mbarton@meridiancity.org
Administrative
Applicant Information
Type of Review Requested
File number:A-2021-0121
Assigned Planner:Cameron Scott
Related Files:
Subject Property Information
Location/street address:2121 E LAKE HAZEL RD
Assessor's parcel number(s):S1405212410
Township, range, section:2N1E5
Agent name (e.g. architect, engineer, developer, representative):BRUCE TAYLOR
Firm name:JENSEN BELTS ASSOCIATES Phone:Fax:2083437178
Address:1509 TYRELL LANE, STE 130 Email:bruce@jensenbelts.com
Contact name:Phone:Fax:
Contact address:Email:
Project/Application Name:Discovery Park Phase 2 - DES, CZC
Description of Work:See Narrative
Project Description
Planning Division
ADMINISTRATIVE APPLICATION
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
1
APPLICATION TYPES
Is this application exempt from fees?:Yes
Certificate of Zoning Compliance - CZC:CHECKED
Does project have prior approval?:No
Does your project contain new construction and/or modifications to an existing
building or the site?:
No
Design Review - DES:CHECKED
ADDRESS VERIFICATION
Address Verification Permit Number:LDAV-2021-0439
TYPE OF USE PROPOSED
Other Type of Use Proposed:Park Expansion
PUBLIC WORKS INFRASTRUCTURE
Does this project require the extension of public infrastructure?:Yes
AutoCAD Files and Public Utility plans will be submitted with:Building Permit Submittal
I acknowledge deferral of the required checklist items, may require additional
review time:
CHECKED
I agree to upload required checklist items with the building application:CHECKED
PROPERTY INFORMATION
General Location:South side of Lake Hazel between Eagle and
Locust Grove Roads
Current Land Use:Undeveloped Park Space
Total Acreage:40 acres Phase 2
Prior Approvals (File Numbers):na
PROJECT INFORMATION
Site Plan Date (MM/DD/YYYY):06/23/2021
Landscape Plan Date (MM/DD/YYYY):06/23/2021
Elevations Date (MM/DD/YYYY):06/23/2021
Percentage of Site Devoted to Building:.01
Percentage of Site Devoted to Landscaping:.77
Percentage of Site Devoted to Paving:.23
Who will own and Maintain the Pressurized Irrigation System in this Development:Meridian Parks and Rec
Primary Irrigation Source:Existing Pump Station
Square Footage of Landscaped Areas to be Irrigated by City Water Connection:0
Proposed Building Height:16 feet
Gross Floor Area Proposed:1560
Number of Standard Parking Spaces Provided:516
Number of Compact Parking Spaces Provided:0
In Reclaimed Water Buffer:No
Application Information
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
2
TIME EXTENSION INFORMATION
Number of months extension:24
APPLICATION DISCLAIMER
I have read and accept the above terms:CHECKED
Your signature:Bruce Taylor
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
3
1509 S Tyrell Ln, Ste 130 Boise, Idaho 83706 Ph. (208) 343‐7175 email bruce@jensenbelts.com
June 23, 2021
City of Meridian
Planning Department
33 E. Broadway Ave.
Meridian, Idaho 83642
Re: Discovery Park Phase 2
Certificate of Zoning Compliance Application Narrative
On behalf of the Meridian Parks and Recreation Department; we are pleased to submit this CZC
application for proposed improvements at Discovery Park. As you know, this is an existing park
at the south side of E Lake Hazel Road, between S Eagle Rd and S Locust Grove Rd. The Park
parcel is 76.88 acres with phase one developing approximately 23 acres of the total. This phase
two proposes approximately 40 acres of additional development.
A CDA is being developed for E Lake Hazel Road improvements. This Park currently has 145
parking spaces. We propose adding another 516 parking spaces. In addition to parking, phase
two proposes the following improvements:
Extend new collector road from northern property boundary bordering the fire station
to new drive access.
Extend interior private access drive to new collector road.
Add new 12‐stall restroom and concession building.
Add new dual dumpster trash enclosure.
Add three picnic shelters.
Add three softball fields, two of which have lighting.
Add six pickleball and two tennis courts.
Add dual 40‐yard dash lanes with electronic timing.
Add two bocce courts.
Add one full basketball court
Add community garden space
Add one sand volleyball court
Add hammock hanging area with 18 poles.
Add skate park area. This will be design/build, size TBD.
Add walking paths.
Add eight bike racks for 16 phase two spaces. Provided and installed by owner
Drinking fountains, trash receptacles, benches, and other furnishings by owner.
Thank you for consideration of this project and please contact me with any questions.
1509 S Tyrell Ln, Ste 130 Boise, Idaho 83706 Ph. (208) 343‐7175 email bruce@jensenbelts.com
Sincerely,
JENSEN BELTS ASSOCIATES, PLLC
Bruce Taylor,
Principal
2238 Broadway Avenue Boise, Idaho 208.338.9080 www.insightarchitects.com
Discovery Park
Design Narrative
COHESIVE DESIGN
The concept of the design is to complement the existing buildings on the site in design
and scale. To do this we have selected materials and massing that present compatible
design concepts. The materials proposed work well together and help reinforce the
massing concept of the different portions of the building. These massing elements
highlight the entry points and delineate the main entry point for the public to use.
BUILDING SCALE
The design of the building provides elements that mitigate the height of the certain
portions of the building while allowing other building elements to extend the height of
the building. This provides visual interest along with the comfort of knowing where to
enter the building. The materials chosen have small details that provide human scale
when up close.
BUILDING FORM
The design allows the elements to complement each other and together form the entire
building.
ARCHITECTURAL ELEMENTS / MATERIALS
The architectural features of this building are CMU and metal roofing that match and
complement the other existing building on site.
SIGNAGE AND LIGHTING
The building signage is limited to a indicating the location of the toilet room entrances.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXXXEPEPEPEP EPEPEPEPEPEPEPEPEPEP
EPEP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP
EPEPEP EP EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPXXXXX
XXXXXXXXXXXXXX
X X
EWEWEWEWEWEWEPEPEPEPEPEPEPEPEPEPXXXXXXXXXXXEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPS00°02'18"W 500.00'S89°58'22"E 348.63'1354.46'820.45'
N00°01'42"W 2672.76'S89°58'22"E 983.44'S00°01'18"W 2174.91'S00°01'18"W 500.00'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXXXEPEPEPEP EPEPEPEPEPEPEPEPEPEP
EPEP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP
EPEPEP EP EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPXXXXX
XXXXXXXXXXXXXX
X X
EWEWEWEWEWEWEPEPEPEPEPEPEPEPEPEPXXXXXXXXXXXEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPS00°02'18"W 500.00'S89°58'22"E 348.63'1354.46'820.45'
N00°01'42"W 2672.76'S89°58'22"E 983.44'S00°01'18"W 2174.91'S00°01'18"W 500.00'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXX
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXMTREXXXXX XUGPMTRMTR
XX XX
XX
X
X
XX
X
XXX XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXVAN VANVAN VAN
VANVANVAN
STOPSTOPSTOPSTOPSTOP
STOPFINISHSTAR
T1
2PARKINGNO
PARKINGNOPARKINGNOPARKINGNOXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXXXEPEPEPEP EPEPEPEPEPEPEPEPEPEP
EPEP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP
EPEPEP EP EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPXXXXX
XXXXXXXXXXXXXX
X X
EWEWEWEWEWEWEPEPEPEPEPEPEPEPEPEPXXXXXXXXXXXEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPS00°02'18"W 500.00'S89°58'22"E 348.63'1354.46'820.45'
N00°01'42"W 2672.76'S89°58'22"E 983.44'S00°01'18"W 2174.91'S00°01'18"W 500.00'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXXXEPEPEPEP EPEPEPEPEPEPEPEPEPEP
EPEP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP
EPEPEP EP EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPXXXXX
XXXXXXXXXXXXXX
X X
EWEWEWEWEWEWEPEPEPEPEPEPEPEPEPEPXXXXXXXXXXXEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPS00°02'18"W 500.00'S89°58'22"E 348.63'1354.46'820.45'
N00°01'42"W 2672.76'S89°58'22"E 983.44'S00°01'18"W 2174.91'S00°01'18"W 500.00'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXX
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXMTREXXXXX XUGPMTRMTR
XX XX
XX
X
X
XX
X
XXX XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXVAN VANVAN VAN
VANVANVAN
STOPSTOPSTOPSTOPSTOP
STOPFINISHSTAR
T1
2PARKINGNO
PARKINGNOPARKINGNOPARKINGNODESCRIPTIONACCESSIBLE AISLE4" WIDE STRIPS 24" O.C. AT 45d ANGLE. PAINT PER ISPWC SPEC 1104ASPHALT PAVEMENT - HEAVY DUTYASPHALT PAVEMENT - LIGHT DUTYACCESSIBLE PAVEMENT MARKINGSPAINT PER ISPWC SPEC 1104. SYMBOL PER ACHD DETAIL TS1113 ANDADA REQUIREMENTS. ADD WORD "VAN TO SPACES INDICATED ONPLAN.BASKETBALL COURTLIGHT DUTY CONCRETE PAVEMENT WITH NARROW SAW CUT JOINTS.FOUR (4) BISON ADJUSTABLE UNITS MODEL BA785U/PR REQUIRED. SEEDETAIL 1, SHEET L1.16BOCCE COURT13'x91', DECOMPOSED GRANITE ON AGGREGATE BASE WITH 2"X6"COMPOSITE BUMPERS. TWO (2) REQUIRED. SEE DETAIL 2, SHEET L1.16STEEL BOLLARDSEE CIVILBIKE RACKNERO BIKE HITCH. PROVIDED AND INSTALLED BY OWNER. SEE DETAIL3, SHEET L1.16.BIKE PARKDESIGN BUILDCONCRETE CURB AND GUTTERSEE CIVIL.CONCRETE PAVEMENT - HEAVY DUTYSEE CIVILCONCRETE PAVEMENT - LIGHT DUTYSEE CIVILCROSSWALK24" WIDE THERMOPLASTIC. CENTER ON PEDESTRIAN RAMPS. MARKINGWIDTH TO MATCH RAMP WIDTH SHOWN. NUMBER PER PLAN. INSTALLPER ISPWC SPEC 1104DRINKING FOUNTAINROUGH-IN BY CONTRACTOR. OWNER TO FURNISH AND INSTALL.40 YARD DASHARTIFICIAL TURF ON AGGREGATE BASE WITH 18" VERTICAL CURBSIDES. 40 YARD DASH KIT SUPPLIED AND INSTALLED BY GAMETIME.30' TALL CHAIN LINK BACKSTOPMATCH EXISTING. SEE DETAILS SHEET L1.18.4' TALL CHAIN LINK FENCESMALL SOFTBALL FIELD OUTFIELD FENCE. SEE DETAIL 3, SHEET L1.19.8' TALL CHAIN LINK FENCEFIRST AND THIRD BASELINE FENCE. SEE DETAIL 2, SHEET L1.19LIGHT FIXTURESEE ELECTRICAL.6' TALL CHAIN LINK FENCELARGE SOFTBALL FIELDS OUTFIELD FENCE. INSTALL 4' WIDE GATE INCENTER. SEE DETAIL 2, SHEET L1.19.GRAVEL SURFACEADD 3/4" MINUS GRAVEL TO EXISTING AND GRADE SMOOTHHAMMOCK POSTSHAMMOCK POSTS TO BE 5" DIA GALVANIZED STEEL POST INCONCRETE FOOTING. RANDOM PLACEMENT OF 7', 10', AND 13'. 18TOTAL POSTS. (9) DIFFERENT CAP COLORS RANDOMLY PLACED.INSTALL 24" DIA CONCRETE MOW STRIP AROUND EACH POST. SEEDETAIL 4, SHEET L1.16NO PARKING STRIPING AND LETTERS4" WIDE STRIPS 24" O.C. AT 45d ANGLE. PAINT PER ISPWC SPEC 1104.PLACE 12" MINIMUM HEIGHT "NO PARKING" LETTERS WHERE SHOWN.NO PARKING ANY TIME SIGNR7-1 "NO PARKING ANY TIME" SIGN. MOUNT BOTTOM OF SIGN MINIMUM80" HIGH. INSTALL TYPE E-1 STEEL POST PER ISPWC DETAIL SD-1130.PICKLEBALL COURTSLIGHT DUTY ASPHALT PAVEMENT INSTALLED, SAW CUT, ANDBORDERED BY CONCRETE PAVEMENT. COLOR COAT. BISONPICKLEBALL SYSTEM MODEL PK05XL. 5 FOOT HIGH CHAIN LINK FENCE.SEE DETAILS SHEET L1.17.PEDESTRIAN RAMPINSTALL WITH RAMP WINGS OR CURBS AS SHOWN ON PLANS. INSTALL24" WIDE YELLOW DETECTABLE WARNING STRIPS ENTIRE WIDTH OFRAMP. INSTALL PER ISPWC DETAIL SD-712 AND ADA REQUIREMENTS.SLOPES SHALL NOT EXCEED 12:1.PARKING STRIPING4" WIDE WHITE PAINT PER ISPWC SPEC 1104RESTROOMSEE ARCHITECTURE.SHELTER TYPE 'A' SHELTER SHALL BE STEELWORX 16'X24' RECTANGULAR OPEN GABLE.MODEL HP-1624-SW. ROOF COLOR: PREWEATHERED GAVALUME.FRAME COLOR: TBD. SEE DETAIL 1, SHEET L1.20.SHELTER TYPE 'B'SHELTER SHALL BE 8'X30' MULTI-SHADE WALK BY SHADE SYSTEMS INC.SIX (6) REQUIRED. ONE AT EACH DUGOUT FOR SHADE. 8 FOOT HEIGHT.COLORS TBD. SEE DETAIL 2, SHEET L1.20.SHELTER TYPE 'C'SHELTER SHALL BE STEELWORX 28' HEXAGONAL. MODEL HX-28-SW.ROOF COLOR: ASH GRAY. FRAME COLOR: TBD. SEE DETAIL 3, SEETL1.20.ACCESSIBLE PARKING SIGNLOCATE 12" BEHIND CURB WITH WHEEL STOPS OR 36" WITHOUT ASSHOWN ON PLAN. 12"X18" "RESERVED PARKING" SIGN WITHINTERNATIONAL ACCESSIBLE SYMBOL. BLUE AND WHITE. MOUNTBOTTOM OF SIGN MINIMUM 60" HIGH. INSTALL TYPE E-1 STEEL POSTPER ISPWC DETAIL SD-1130.ACCESSIBLE VAN SIGNSAME AS ACCESSIBLE SIGN BUT WITH ADDED "VAN" SIGN BELOW.SOFTBALL INFIELDINCLUDE HOME PLATE AND BASES. SEE DETAIL 3, SHEET L1.18.SKATE PARKDESIGN BUILDSTOP BAR AND LETTERS24" WIDE THERMOPLASTIC. LENGTH TO MATCH WIDTH OF LANE.INSTALL PER ISPWC SPEC 1104. PAINTED LETTERS (22 SF) PER ACHDDETAIL TS 1113 AND ISPWC SPEC 1104. LOCATE 12" FROM STOP BAR.STOP SIGN30"X30" MUTCD R1-1 SIGN. MOUNT BOTTOM OF SIGN MINIMUM 80" HIGH.INSTALL TYPE E-1 STEEL POST PER ISPWC DETAIL SD-1130.SAND VOLLEYBALL18" CONCRETE VERTICAL CURB PER CIVIL. INSTALL COARSE SAND.BISON SVB1000 NET SYSTEM. SEE DETAIL 5, SHEET L1.16.CROSSWALK SIGNMUTCD S1-1 SIGN WITH W16-7P ARROW BELOW. MOUNT BOTTOM OFSIGN MINIMUM 80" HIGH. INSTALL TYPE E-1 STEEL POST PER ISPWCDETAIL SD-1130.TRASH ENCLOSUREDOUBLE UNIT ENCLOSURE WITH BLOCK WALLS, METAL GATES, ANDHEAVY DUTY CONCRETE PAD. SEE ARCHITECTURE.TENNIS COURTSLIGHT DUTY ASPHALT PAVEMENT INSTALLED, SAW CUT, ANDBORDERED BY CONCRETE PAVEMENT. COLOR COAT AND STRIPINGFOR TENNIS AND PICKLEBALL. BISON TENNIS SYSTEM MODEL TN10N.10 FOOT HIGH CHAIN LINK FENCE PER DETAIL 1, SHEET L1.19. SEEDETAILS SHEET L1.17.CONCRETE WHEEL STOP6'. LOCATE FRONT 3' FROM FACE OF CURB. ANCHOR WITH 5/8" PINS.YARD HYDRANT SYMAAAHALAMBBBCBLBRBPCCCHCLCWDFDSFBFFFEFLFSGVHPNPNSPBPRPSRRSASBSCSDSESISPSSSTSVSWTETNWSYHCALLOUT LEGENDSCALE 1" = 120' (@ 24"X36" Plotted Size)NORTHOVERALLSITE PLANL1.0DISCOVERY PARK PHASE 2
MERIDIAN PARKS AND RECREATION
SITE
MERIDIAN, IDAHO 83642
2121 E LAKE HAZEL ROAD CZC6-23-21..AREA AAREA BAREA CFUTURE PHASEAREA DAREA EAREA FAREA GAREA HAREA IAREA JAREA KAREA LAREA MAREA NAREA ONOT A PARTEXISTING PHASE 1