Loading...
9-Discovery Park Ph 2 New Collector Road Striping11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+0017.50'11.00'6.50'11.00'11.00'6.50'12+25.95, 11.00' L 12+25.95, 0.00'11.00'6.50'17.50'12+06.24 15+80.49 18+92.48 13+77.76, 11.00' L 13+77.76, 0.00' 15+29.56, 0.00' 16+96.64, 5.50' R 16+96.10, 16.50' L 19+12.64, 5.50' L 19+12.64, 5.50' R 19+12.64, 16.50' L R1000.00'R989.00'R1011.00'R1000.00'10+84.70, 22.00' L R7-9 12+83.21, 22.00' L R7-9 14+83.55, 22.00' L R7-9 16+83.76, 27.09' L R7-9 18+75.45, 27.50' L R7-9 17+48.38, 27.50' L R2-1 18+63.92, 48.19' R R1-112.00'16+96.64, 16.50' R16+01.24, 19.65' R 17+04.84 17+71.64 17+96.64, 16.50' R 4.00'11.00'11.00'15+28.50, 21.97' R R7-1L 16+64.72, 30.05' R R7-1 16+96.17, 31.92' R R3-7R 17+98.60, 32.00' R R7-1R ON STREET PARKING PERMITTED ON WEST SIDE OF STREET18.00' CL TO TBC28.00' CL TO TBC23.50' CL TO TBCR48.00 '18.00' CL TO TBC17.50'20+08.64, 0.00'36.00'TBC TO TBC10.00'SIDEWALK8.00'PLANTERTEMP. TURN AROUND EASEMENT TO ACHD 6+00 7+00 8+00 9+00 10+0011.00'6.50'17.50'8+06.24 6+84.70, 22.00' L R7-9 8+84.70, 22.00' L R7-9 6+44.92, 22.00' R R7-1R ON STREET PARKING PERMITTED WITHIN LIMITS SHOWN ON WEST SIDE OF STREET ONLY18.00' CL TO TBC18.00' CL TO TBC36.00'TBC TO TBC10.00'SIDEWALK6213 N. Cloverdale Rd.Suite 125Boise, Idaho 83704t.208.846.8955f.208.846.8956c.208.867.3954ross@ericksoncivil.comericksoncivilPROFESSIO N AL E OHADIFOETA T S E R IC K SONKSSO R 1 0 8 1 3 NGIN E E RRE G I STERE D DATENO.REVISIONPREPARED BY:PROJECT MANAGER:JOB NUMBER:PH: (208) 846-8955FAX:(208) 846-8956DRAWN BY:ERICKSON CIVIL, INC.-RKESHEET NUMBER:SHEET TITLE:DATE:6-22-21 IDB19075OWNER:PROJECT TITLE:DISCOVERY PARK PHASE 2MERIDIAN, IDCITY OF MERIDIAN---Plans Are Accepted For PublicStreet Construction--ORIGINAL SIGNED PLAN SET ON FILE AT ERICKSON CIVIL, INC.CZC SUBMITTAL (PRELIMINARY NOT FOR CONSTRUCTION)APPROVED FORCONSTRUCTIONIDAHO--ORIGINAL SIGNED PLAN SET ON FILE AT ERICKSON CIVIL, INC.6-22-21 ROADWAY - STRIPING S. RECREATION AVE. (STA 6+44.92 TO 20+08.64)C.RS.1 1.ALL STRIPING SHALL BE IN ACCORDANCE WITH ACHD AND MUTCD STANDARDS. 2.OBLITERATE ALL STRIPING WITHIN THE LIMITS OF NEW STRIPING IN ACCORDANCE WITH ACHD STANDARDS. 3.ALL CROSS WALK MARKINGS SHALL BE WHITE THERMOPLASTIC TAPE (2' WITH 4' GAP) AND BE CENTERED ON THE PEDESTRIAN RAMPS. SEE PLANS FOR CROSS WALK WIDTHS AND LOCATIONS 4.ALL STOP BARS AND TURN ARROWS SHALL BE WHITE THERMOPLASTIC TAPE. 5.CONTACT ACHD CONSTRUCTION SERVICES PRIOR TO PLACEMENT OR REMOVAL OF ANY PAVEMENT MARKINGS TO CONFIRM COMPLIANCE WITH POLICY AND EXISTING PAVEMENT MARKINGS (208) 387-6280. A.4" DOUBLE CENTERLINE STRIPING (YELLOW) - SEE TS-1112 STRIPING DETAIL #7. B.BIKE LANE SYMBOL PER ACHD STDS. C.8" ELEPHANT TRACKING (WHITE) - SEE TS-1112 STRIPING DETAIL 11. D.CROSSWALK (WHITE THERMOPLASTIC) - SEE TS1112 STRIPING DETAIL #18. E.8" CHANNELIZING LINE (WHITE) - SEE TS-1112 STRIPING DETAIL 15. F.STOP BAR (WHITE THERMOPLASTIC) - SEE TS1112 STRIPING DETAIL #19. G.NOT USED. H.TURN ARROW - WHITE THERMOPLASTIC PER ACHD STANDARDS. I.4" CENTER LINE STRIPING, 18' STRIPE + 7' SKIP (YELLOW) - SEE TS-1112 STRIPING DETAIL #1. J.TWO WAY LEFT TURN LANE STRIPING, 7' STRIPE + 18' SKIP(YELLOW) - SEE TS-1112 STRIPING DETAIL #9 1.SIGNAGE SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), THE CURRENT EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC) AND THE ACHD SUPPLEMENTAL SPECIFICATIONS AND REQUIREMENTS. 2.SIGN POSITIONING SHALL BE IN ACCORDANCE WITH MUTCD SECTION 7B.03 AND ACHD STANDARDS. 3.SIGN HEIGHTS SHALL BE IN ACCORDANCE WITH MUTCD SECTION 2A.18 AND ACHD STANDARDS. 1.10' WIDE TYPE-II SIDEWALK TERMINUS BARRICADE SHALL BE PROVIDED PER ACHD STANDARDS. BARRICADES SHALL HAVE THICKENED EDGE ALUMINUM W/6" WIDE RETRO-REFLECTIVE RED/WHITE DIAGONAL DECALS. PAINTED SIGNS ARE NOT ALLOWED. BARRICADE MUST HAVE A KICK PLATE AT THE BOTTOM TO PROVIDE CANE DETECTION. 2.TYPE-III ROADWAY TERMINUS BARRICADE SHALL BE PROVIDED PER ACHD STANDARDS AND INCLUDE A SIGN THAT STATES "STREET TO BE EXTENDED IN THE FUTURE". FEET 0 40 80 MATCH LINE B - SEE SHEET C.RS.1MATCH LINE B - SEE SHEET C.RS.1R2-124" X 30"R7-912" X 18"R7-912" X 18"R7-912" X 18"R7-912" X 18"R7-912" X 18"R7-912" X 18"R7-912" X 18"R1-1 30" X 30"R7-1R12" X 18"1 A 1 F F F F F I I I I A A J JD F SEE ONSITE PLANS FOR LANE STRIPINGR7-112" X 18"R7-1R12" X 18"R7-1L12" X 18"D 2 1 2S. RECREATION AVE. COLLECTOR ROADWAY IMPROVEMENTS FROM THE ROAD TERMINUS TO W. LAKE HAZEL RD. TO BE COMPLETED BY OTHERS UNDER ACHD CDA H H B B B B NO PARKING TO W. LAKE HAZEL RD. FIRE STATION SITE FIRE STATION / PARK PROPERTY LINE