Loading...
Burlington DES A-2021-0148 Page 1 DATE: 8/3/2021 TO: Olivia Good SGA Design Group FROM: Stacy Hersh, Assistant Planner 208-884-5533 SUBJECT: A-2021-0148 Burlington DES LOCATION: 2070 N Eagle Road I. PROJECT DESCRIPTION The applicant, Olivia Good, requests Administrative Design Review (DES) approval to remodel the existing Toys R Us Building into the new Burlington store on 21.13 acres of land in the C-G zoning district. The scope of work is as follows:  Demolition of the front façade and minor demolition of exterior masonry for new store front opening to be placed.  Existing stucco above the demolished brick wainscot on the left side of the façade will remain, new stucco will be applied below existing CMU wall and painted to match; new stucco will be applied to the right side of the façade to a new CMU wall infill.  Existing glazing entrance and associated stud work will be removed and infilled with CMU to match existing building façade.  A new man door for egress will be added to the front façade as shown in Exhibit A.  Burlington’s standard prototype façade will be applied to the existing exterior structural wall as shown in Exhibit A.  A new truck door will be installed on the rear side of the building along with two-man doors for egress located out of the sales floor and back of house. II. DECISION The applicant's request for Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete ADMINISTRATIVE DESIGN REVIEW COMPLIANCE REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Site Specific Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. The elevations prepared by SGA Design Group, P.C. on July 21, 2021, labeled A5.0 and A5.1, are approved by the City of Meridian Planning Division as shown in Exhibit A. 4. The approved elevations may not be altered without prior written approval of the City of Meridian Planning Division. 5. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 6. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ-07-012; VAR-07-017; MDA-11-002, DA #111052692; CZC-11-021; CZC-11-048; CZC-12-063, DES-12-039.) 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. III. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before August 18, 2021, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. Page 3 IV. EXPIRATION The Administrative Design Review approval shall be exercised with the approval period of the underlying permit or the approval shall expire. Page 4 V. EXHIBITS A. Building Elevations (date: 7/21/2021)