Loading...
NARRATIVE -1250 W. Upstick Road, Meridian Idaho 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336 -2863 Fax: www.crowncastle.com Via on line permit system Citizens Access Portal June 25, 2021 City of Meridian Idaho Planning Division 33 East Broadway Ave. Suite 102 Meridian, Idaho 83643 RE: Eligible Facilities Request to modify equipment on a communications tower located at: 1250 W. Ustick Road, Meridian, Idaho Parcel No. R9532190560 City of Meridian Certificate of Zoning Compliance Application (AT&T application) Addressing Verification No. LDAV-2021-0400 Crown Site Number: 839612 Application No. 554066 Carrier: AT&T Carrier site ID: IDLO1003 Carrier Site name: Meridian Relo 2 Other numbers: FA 15468575 Crown Castle USA Inc. (“Crown Castle”) on behalf of AT&T is submitting the attached Eligible Facilities Request application for a Certificate of Zoning Compliance to add a new colocation to an existing telecommunications tower located at 1250 W. Ustick Road, Meridian, Idaho. AT&T proposes to modify this existing site as follows: Proposed Scope of Work: • Bring power/fiber to site location • Add AT&T approved walk in cabinet (WIC) and associated interior equipment • Add (1) 30 kw AC diesel generator • Add (1) New GPS unit • Add (3) VFA12-HD-WLL sector mounts on (E) Monopole 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336 -2863 Fax: www.crowncastle.com • Add (6) antennas, (2) per sector • Add (15) RRHs, (5) per sector • Add (3) DC6 Surge Suppressors, (1) per sector • Add (6) DC trunks • Add (3) fiber trunks Itemized list of submittal documents for a Certificate of Zoning Compliance: • Affidavit of Legal Interest • CZC Checklist • Construction Drawings • Narrative – see this letter • Property Detail Report • Site Plan • Vicinity Map • Warranty Deed • Prior CZC’s for this site: -CZC-A-2016-0308 -CZC-A-2018-0213 -CZC-A-2020-0209 Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, commonly known as the “Spectrum Act” (Pub. Law No. 112-96, 126 Stat 156), mandates that state and local governments “may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station.” Additionally, if “the reviewing State or local government determines that the application is incomplete” [they] “must provide written notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all missing documents or information.” Under federal law, an Eligible Facilities Request is deemed granted with written notification in sixty (60) days after an application is filed with a local jurisdiction, excluding tolling. AT&T is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval of requests to modify existing personal wireless service facilities. If you should require more information regarding the Spectrum Act, please do not hesitate to contact me with your questions. Sincerely, Gary Abrahams For CCI 206-349-4279