Loading...
REVISED ElevationsT.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" A D T.O. MID PARAPET 125' -0" B C T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 E-6 B-1 C-4 H-1 F-7 G-1 D-5 A-2 C-4 B-1 D-5 A-2G-1 B-1C-4 H-1 E-3 C-4F-7 T.O. TOP PARAPET 127' -0"E-6G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 12 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" H-1 E-3 C-4 C-4D-5 F-7 D-5H-1 G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 1 2 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 D-5E-6 G-1 E-6 C-4 B-1F-7 G-1 A-2 B-1 F-7 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" AD T.O. MID PARAPET 125' -0" BC T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" D-5 E-6 F-7 E-3 F-7 G-1 D-5J-8 B-1 F-7 E-6 B.O. DRIVE-THRU 112' -0" G-1 F-7 F-7 G-1G-1 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK ELEVATIONS 07/22/21 SD51 PAD C 21059 MERIDIAN, IDAHO JOG 1/8" = 1'-0"1EAST ELEVATION 1/8" = 1'-0"2NORTH ELEVATION 1/8" = 1'-0"3SOUTH ELEVATION 1/8" = 1'-0"4WEST ELEVATION MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR A METAL:METAL SIDING B METAL:TRIM AND FACIA C ALUMINUM STOREFRONT D E EIFS: DRYVIT OUTSULATION PLUS MD SYSTEM, TEXTURE: SAND BLAST 1 BLACK 2 PAC CLAD, FLUSH PANEL 7" X 48", COLOR: CITYSCAPE, PATTERN 1/3 OFFSET 3 PAINT: SW7660 EARL GRAY 4 BLACK ANODIZED ALUMINUM X-X F CONCRETE G METAL: COPING BRICK 5 6 7 DARK GRAY INTERSTATE BRICK, EMPEROR, COLOR: MIDNIGHT BLACK, COURSING PATTERN: STACKED PAINT: SW7005 PURE WHITE H METAL: ACCENT BAND J METAL: CORRUGATED SIDING 8 BERRIDGE, 'M' PANEL, COLOR: CHARCOAL GRAY