Loading...
10 - ElevationsSD51-3SD51-1 SD51-4 SD51-211 22 A A D D B B C C 5"25' - 0" 1' - 6"1' - 10" 6' - 2 1/2" 1 1/2" 18' - 0" 1 1/2" 6' - 2"6' - 0"6' - 0" 2" 33' - 9" 2" 6' - 0" 1 1/2" 1' - 6" 11' - 6"5"5"14' - 6"7' - 5 1/2"14' - 6"1' - 6"1 1/2"6' - 6"1' - 0"1 3/4"1' - 6"1' - 0"7' - 5 3/4"10' - 0"3' - 9"4' - 0"3' - 9"5' - 0"12' - 1 1/4"5' - 0"4' - 5 5/8" 3' - 4"2' - 2" 3' - 4"7' - 2"6' - 0"17' - 0"3' - 9"4' - 0"3' - 9"14' - 1"6' - 0"5"7' - 0"6' - 6"19' - 8"6' - 6"4' - 11"125' - 0" 28' - 9"30' - 8"65' - 7"45' - 0"TENANT A TENANT B TENANT C FIRE RISER 1' - 0" SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK FLOOR PLAN 05/19/21 SD52 PAD C 21059 MERIDIAN, IDAHO JOG 1/8" = 1'-0"1FLOOR PLAN NORTHSD51 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" A D T.O. MID PARAPET 125' -0" B C T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 E-6 B-1 C-4 H-1 F-7 G-1 D-5 A-2 C-4 B-1 D-5 A-2G-1 B-1C-4 H-1 A-2 C-4F-7 T.O. TOP PARAPET 127' -0"E-6G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 12 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" H-1 A-2 C-4 F-7 D-5 F-7 D-5H-1 G-1 J-7G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 1 2 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 A-2 G-1 D-5 E-6 G-1 E-6 C-4 B-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" AD T.O. MID PARAPET 125' -0" BC T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 D-5 E-6 G-1 J-7 B-1 F-7 G-1 E-3 F-7 G-1 A-2 B-1 F-7 G-1 D-5E-8 G-1 F-7 D-5 B.O. DRIVE-THRU 112' -0" SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK ELEVATIONS 05/19/21 SD51 PAD C 21059 MERIDIAN, IDAHO JOG 1/8" = 1'-0"1EAST ELEVATION 1/8" = 1'-0"2NORTH ELEVATION 1/8" = 1'-0"3SOUTH ELEVATION 1/8" = 1'-0"4WEST ELEVATION MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR A METAL:METAL SIDING B METAL:TRIM AND FACIA C ALUMINUM STOREFRONT D E EIFS: DRYVIT OUTSULATION PLUS MD SYSTEM, TEXTURE: SAND BLAST 1 BLACK 2 PAC CLAD, FLUSH PANEL 7" X 48", COLOR: CITYSCAPE, PATTERN 1/3 OFFSET 3 PAINT: SW7660 EARL GRAY 4 BLACK ANODIZED ALUMINUM X-X F CONCRETE G METAL: COPING BRICK 5 6 7 DARK GRAY INTERSTATE BRICK, EMPEROR, COLOR: MIDNIGHT BLACK, COURSING PATTERN: STACKED PAINT: SW7005 PURE WHITE H METAL: ACCENT BAND SD52 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" A D T.O. MID PARAPET 125' -0" B C T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 E-6 B-1 C-4 H-1 F-7 G-1 D-5 A-2 C-4 B-1 D-5 A-2G-1 B-1C-4 H-1 A-2 C-4F-7 T.O. TOP PARAPET 127' -0"E-6G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 12 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" H-1 A-2 C-4 F-7 D-5 F-7 D-5H-1 G-1 J-7G-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" 1 2 T.O. STOREFRONT 110' -0" T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 A-2 G-1 D-5 E-6 G-1 E-6 C-4 B-1 T.O. FINISH FLOOR 100' -0" T.O. PARAPET 122' -0" AD T.O. MID PARAPET 125' -0" BC T.O. WAINSCOT 103' -0" T.O. LOW PARAPET 123' -0" B.O. BUILD-OUT 114' -0" G-1 D-5 E-6 G-1 J-7 B-1 F-7 G-1 E-3 F-7 G-1 A-2 B-1 F-7 G-1 D-5E-8 G-1 F-7 D-5 B.O. DRIVE-THRU 112' -0" SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK ELEVATIONS 05/19/21 SD51 PAD C 21059 MERIDIAN, IDAHO JOG 1/8" = 1'-0"1EAST ELEVATION 1/8" = 1'-0"2NORTH ELEVATION 1/8" = 1'-0"3SOUTH ELEVATION 1/8" = 1'-0"4WEST ELEVATION MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR A METAL:METAL SIDING B METAL:TRIM AND FACIA C ALUMINUM STOREFRONT D E EIFS: DRYVIT OUTSULATION PLUS MD SYSTEM, TEXTURE: SAND BLAST 1 BLACK 2 PAC CLAD, FLUSH PANEL 7" X 48", COLOR: CITYSCAPE, PATTERN 1/3 OFFSET 3 PAINT: SW7660 EARL GRAY 4 BLACK ANODIZED ALUMINUM X-X F CONCRETE G METAL: COPING BRICK 5 6 7 DARK GRAY INTERSTATE BRICK, EMPEROR, COLOR: MIDNIGHT BLACK, COURSING PATTERN: STACKED PAINT: SW7005 PURE WHITE H METAL: ACCENT BAND SD53 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK PERSPECTIVES 05/06/21 SD72 PAD C 21059 MERIDIAN, IDAHO JOG Front Perspective Rear PerspectiveSidePerspective SD54 DMG REAL ESTATE PARTNERS, LLC pg. Scale: 1" = 20'-0" DESIGN REVIEW6"6"2"12" CLR. 2" 30"12"CLR.3"2" CONCRETE SOAP BLOCK, SLOPE TO DRAIN (2) #5 CONT. BOND BEAM AT TOP GROUT TOP COURSE SOLID (2) #5 CONT. BOND BEAM AT 2'-0" O.C. #6 VERT. BAR @ 16" O.C. 1/2" FIBER EXPANSION JOINT 6" CONCRETE SLAB WITH 13 X 13 D5 X D5 W.W.F. #5 DOWEL AT 24" O.C. EXTEND 36 BAR DIAMETERS OVER TOP OF FOOTING, ALTERNATE HOOKS GROUT SOLID CONC. FOOTING 12" X 30" W/ (2) #5 HORIZ. (2) #5 CONT. 6'-0" T.O. CMU 0'-0" T.O. PAVEMENT 24"STONE VENEER OVER METAL LATH AND GROUT BED, RE: SD51 E-3 T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 E-3 POST, PAINT BLACK, TYP.-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" D-8 E-3 CONCRETE SOAP BLOCK SLOP TO DRAIN-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" B-4 C-6 B-4 POST, PAINT BLACK CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 1. 2. 3. 4. ANODIZED ALUMINUM, COLOR: BLACK 5. NATURAL COLOR 6. BERRIDGE 'M' DECK 7. SW BUNGALOW BEIGE 8. DARK GRAY A. WOOD B. METAL C. CORRUGATED METAL D. CONCRETE E. F. STUCCO X -#MATERIAL LEGEND 1/2" = 1'-0"1TRASH ENCLOSURE - WALL SECTION 1/2" = 1'-0"3ENCLOSURE SIDE - ELEVATION 1/2" = 1'-0"4ENCLOSURE REAR - ELEVATION 1/2" = 1'-0"2ENCLOSURE FRONT - ELEVATION TRASH ENCLOSURE 5 BIKE RACK DETAIL NTS BRICK INTERSTATE BRICK: MIDNIGHT BLACK PAD C 20 MAY, 2021 NOT USED NOT USED 21059 SD55