PZ - Pre-App Notes (�>1��E RI LAND DEVELOPMENT
MEETING NOTES
Land Development Staff: Seth Oaks Date: 5/25/2021
Project Name and Location: Burger King/Lost Rapids
Is sanitary sewer available? Yes: o No: ❑
Notes: Site has existing sewer service to it
Flow committed
Is domestic water available? Yes: o No: ❑
Notes: Water is stubbed to parcel.
Easements Required? Yes: ❑ No: o
NOTE:easements may not overlap any permanent structure including but not limited to carports,trash enclosures,
trees,shrubs, buildings,etc. Service lines up to the meter pit must be in ROW or covered by an easement.
Notes: If any meters, hydrants,water main, or sewer main is proposed with development, a
20 foot wide easement is required over the mains.
Any carports,trash enclosures, etc. should not impede the easements. Make sure the
site is designed in such a manner that this is not an issue.
Is the project within 500 feet No Is this a commercial Yes
of a re-use main? project?
If both reuse questions are"yes" provide the following information: Building use(manufacturer,carwash,etc.), hours of operation,
approximate business water usage and irrigable landscape area:
Floodplain or other hazards? Yes: ❑ No: o
Notes:
Irrigation District: Settlers Irrigation District
1IPage
(�>1��E IDIAN;�--
Not Surface water must be used as the primary source of irrigation,when available.A
secondary connection for year-round irrigation is required—typically a well or City
water is used.
Public streetlights required? Yes: ❑ No: ❑
Notes: Verify streetlight requirements with Al Christy in Public Works.
Submittal of Civil Infrastructure requirements:
Water and sewer infrastructure will be reviewed outside of building permits. Submit
infrastructure for review with the final plat.
Additional Meeting Notes:
2 1 P a g e