Loading...
CZC-11 - LANDSCAPE PLANLO B B Y C102 VES T C102 LO U N G E C103 PA S S A G E C151 ELE V E2 GM OFF I C E C104 DO S OFF I C E C106 A UNI S E X C108 BR E A K RO O M C110 B UNI S E X C105 CO R R I D O R C150 LAU N D R Y C110 A DR Y E R C110 C ME C H C110 D FIT N E S S C112 ELE C C114 ME C H C116 MAI N T E N A N C E C118 STU D I O AD A A1U N I T A114 2 B D R M C1 U N I T A102 2 B D R M C1 U N I T A101 CO R R I D O R A150 CO R R I D O R A150 STA I R S1 AL C O V E A151 ELE V E1 2 B D R M C3 A D A SH O W E R UNI T A103 1 B D R M B1 C O M M UNI T A105 1 B D R M B1 U N I T A107 1 B D R M B1 U N I T A109 1 B D R M B1 U N I T A111 1 B D R M B1 U N I T A113 1 B D R M B1 U N I T A115 1 B D R M B1 U N I T A106 1 B D R M B1 C O M M UNI T A108 1 B D R M B1 U N I T A110 1 B D R M B1 U N I T A112 1 B D R M B1 U N I T A104 1 B D R M AD A T U B B5 U N I T A117 STU D I O A1 U N I T B110 ST U D I O A1 U N I T B111 STU D I O A1 U N I T B108 STU D I O A1 U N I T B109 STU D I O A1 U N I T B106 STU D I O A1 U N I T B107 STU D I O A1 U N I T B104 STU D I O A1 U N I T B105 STU D I O A1 U N I T B102 STU D I O A1 U N I T B103 STU D I O A1 U N I T B101 ST A I R S2 SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UTUTRD RD RD RD RDRDRDRD RD RD RD RD RD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDRDRDRDSSxSSxSSxSSxSSxSSxSSxSSxSDxSDxSSx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDxSDx GxGxGxSSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSxSSxSSx SSxOHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx IRR IRR IRR IRR IRR IRR IRR IRR IRR I R R I R R I R R I R R I R R I R R I R R I R R I R R I R R I R R SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxGxGxGxSDxGxGxGxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxOHPxIRRIRRIRRIRRUGTx UGTx UGTx UGTxEPEPEPEPEPEPEPEP EPEPEP EP EPXXXXXXXXXXXXXXXDITCHDITCHDITCHDITCHDITCHDITCHDITCHDITCHDITCHDITCHEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPFOxFOxFOxFOxFOxFOxFOx FOx FOxFOxFOxFOxFOxFOxFOxFOx FOx FOxFOxFOxFOxFOxFOxFOxFOx FOx FOxFOxFOxFOxFOxFOxFOxFOx FOx FOx FOxFOxFOxFOxFOxFOxIRRIRRIRRIRRIRRIRRIRREPEPEPEPEPEPEPSSxSSxSSxSSxFRANKLIN ROAD EAGLE ROADLEGEND FO S C A P E ARCHITECTDNAL D ESNECIL ETATS IDA H OD.HOJ OTER RN S LA - 16827 05/07/21JAGJDRDRAWN BY:CHECKED BY:N. EAGLE RD & E. FRANKLIN RD.MERIDIAN, ID 83642OAKWOOD WATER WALK HOTEL20005.20001Project No:© All work herein is the exclusive property of GLMV Architecture, Inc. and is not to be copied or used in any way without the expresswritten consent of GLMV Architecture, Inc. All drawings,specification, ideas, designs and arrangements appearingherein constitute the original and unpublished Work of:2020 GLMV Architecture , Inc.ISSUE DATE:DRC SUBMITTALMARKDATEDESCRIPTIONLANDSCAPE PLAN L-100 ORIGINAL CONTRACT DOCUMENTS4/6/2020 7:07 PMW:\PROJECTS\GLMV Architecture\CAD\Sheets\Waterwalk-Meridian_Landscape_DR_5-7-2021.dwgSITE LOCATION MAP GENERAL LANDSCAPE NOTES PROJECT SITE LANDSCAPE ARCHITECT CIVIL ARCHITECT DEVELOPER South Landscape Architecture P.C.Dba South Beck & Baird Landscape Architecture P.C.2002 S. Vista AveBoise, ID. 83705 info@sbbgo.com208.342.2999 Office www.sbbgo.comP U R P O S E S C O N S T R U C T I O N PRELIMINARY N O T F O R PLANT SCHEDULE LANDSCAPE NOTES 05/07/21JAGJDRDRAWN BY:CHECKED BY:N. EAGLE RD & E. FRANKLIN RD.MERIDIAN, ID 83642OAKWOOD WATER WALK HOTEL20005.20001Project No:© All work herein is the exclusive property of GLMV Architecture, Inc. and is not to be copied or used in any way without the expresswritten consent of GLMV Architecture, Inc. All drawings,specification, ideas, designs and arrangements appearingherein constitute the original and unpublished Work of:2020 GLMV Architecture , Inc.ISSUE DATE:DRC SUBMITTALMARKDATEDESCRIPTIONLANDSCAPE DETAILS L-200 ORIGINAL CONTRACT DOCUMENTS4/6/2020 7:07 PMW:\PROJECTS\GLMV Architecture\CAD\Sheets\Waterwalk-Meridian_Landscape_DR_5-7-2021.dwgFO S C A P E ARCHITECTDNAL DESNECIL ETATS IDA H OD.HOJ OTER RN S LA - 16827South Landscape Architecture P.C.Dba South Beck & Baird Landscape Architecture P.C.2002 S. Vista AveBoise, ID. 83705 info@sbbgo.com208.342.2999 Office www.sbbgo.com1.ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2.APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS GROUNDCOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL SPACED VERTICAL CUTS. TILL SOIL TO A DEPTH OF 12", BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL SUBGRADE A = LENGTH, AS SPECIFIED OR PER PLANT SCHEDULE B = 85% OF 'A' APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED 3" DEPTH OF MULCH AT PLANTER BEDS CUT EDGEFINISH GRADE, PER PLANS 1 2 P U R P O S E S C O N S T R U C T I O N PRELIMINARY N O T F O R