Goettesche Dental Office Building CZC, DES A-2021-0117
Page 1
DATE: 7/12/2021
TO: Jackson Bidwell
neUdesign Arhitecture
FROM: Stacy Hersh, Assistant Planner
208-884-5533
SUBJECT: A-2021-0117
Goettsche Dental Office Bldg. CZC,
DES
LOCATION: 53 E Calderwood Drive
I. PROJECT DESCRIPTION
The applicant Jackson Bidwell, requests approval of Certificate of Zoning Compliance (CZC) and
Administrative Design Review (DES) for a new 4,651 square foot dental office building on 0.62 acres
of land in the C-G zoning district.
II. DECISION
The applicant's request for Certificate of Zoning Compliance and Design Review are approved with
the conditions listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if
you need a building permit and/or inspection. If you do need a building permit, you must complete
that process before you commence the use or construction. Please contact Building Services for
additional details about building permits and inspections.
Site Specific Conditions of Approval
1. Business hours of operation within the C-G zoning district shall be limited from 6 am to 11 pm
when the property abuts a residential use or district as set forth in UDC 11-2B-3A4.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3
Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set forth
in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with
UDC 11-5C-3C.
4. Upon installation of the landscaping and prior to inspection by Planning Division staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
CERTIFICATE OF ZONING
COMPLIANCE REPORT
COMMUNITY DEVELOPMENT DEPARTMENT
Page 2
5. The site plan prepared by neUdesign on June 30, 2021 and June 16, 2021, labeled A-101 and A-
501, are approved by the City of Meridian Planning Division as shown in Exhibit A.
6. The landscape plan prepared by KM Engineering on June 11, 2021, labeled L1.0, is approved by
the City of Meridian Planning Division as shown in Exhibit B with the following conditions:
➢ Per UDC 11-3B-8.C (Parking lot landscaping), one tree every thirty-five feet (35’) is
required in the planter running east to west through the parking lot (per this standard
two (2) trees are required); trees must remain outside of the easement.
➢ The landscape plan shall be revised to match the dimensions of the site plan depicting
the compact parking stalls and six foot (6’) wide parking lot planter that runs from east
to west through the parking lot.
The changes noted above shall be incorporated on the plans submitted with the building
permit application.
7. The elevations prepared by neUdesign on June 16, 2021, labeled A-211 and A-212, are approved
by the City of Meridian Planning Division as shown in Exhibit C.
8. The approved site plan, landscape plan and/or elevations may not be altered without prior written
approval of the City of Meridian Planning Division.
9. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
10. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant
shall submit a new site plan to the City of Meridian Planning Division for approval prior to
issuance of the building permit.
11. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building Official
has issued a Certificate of Occupancy.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets
the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth
in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (RZ-15-002, MCU-15-001, DA #2015-043235; VAC-15-001,
PBA-15-010; H-2018-0103, MDA #2018-111024).
3. The issuance of this CZC does not release the applicant from any previous requirements of the
other permits issued for the site.
4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the
area.
5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set
forth in UDC 11-3A-11.
6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping
and constructed features within the clear vision triangle consistent with the standards in UDC 11-
3A-3.
III. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director. All
requests for review shall be filed in writing with the Planning Division on or before July 27, 2021,
within fifteen (15) days after the written decision is issued, and contain the information listed in UDC
11-5A-6B.
Page 3
If City Council review of the decision is not requested, the action of the Director represents a final
decision on a land use application. You have the right to request a regulatory taking analysis under
Idaho Code 67-8003.
IV. EXPIRATION
The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not
commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until July
12, 2022.
Page 4
V. EXHIBITS
A. Site Plan (date: 6/30/2021)
Page 5
B. Landscape Plan (date: 6/11/2021)
Page 6
C. Building Elevations (date: 6/16/2021)