REVISED ElevationsBUILDING MATERIALS - THIS ELEVATION:
N
o
o
TOTAL AREA: 1,716
SF.
Q
MASONRY:1,340
SF. 78%
STUCCO 2
1PREFINISHED METAL
GLASS:
3 6 SF.
22%
PREFINISHED
M TAL
CANOPY
PREFINISH METAL
COPING
STUCCO
1
WOOD 1
COPING
PREFINISHED METAL
COPING
STUCCO 2
STUCCO 2
TOP OF ROOF
N
STUCCO 1
PREFINISHED
��
��
��
STUCCO 2
WINDOW UNIT
0
0
-- -- -- -
-----
-
O'-0"
FIN. FLOOR
STUCCO 2
ALUMINUM/GLASS
LL/
STUCCO CONTROL
STUCCO 1
STUCCO
WOOD 1
ALUMINUM/GLASS
STOREFRONT ENTRY
J
JOINTS
STOREFRONT ENTRY
FRONT EXTERIOR ELEVATION
3/16" =
1'-0"
4
STUCCO 2 BEYOND BUILDING MATERIALS - THIS ELEVATION:
BUILDING MATERIALS
- THIS
ELEVATION:
PREFINISHED METAL
COPING BEYOND
STUCCO 2
BEYOND
PREFINISHED METAL TOTAL AREA: 793 ST.
TOTAL AREA: 793
ST.
ROOFLINE
COPING MASONRY:685 SF. 86%
MASONRY:685 SF.
86%
GLASS: 108 SF. 14% PREFINISHED METAL
COPING
PREFINISHED METAL GLASS: 108 SF. 14%
COPING
STUCCO 2
- -- ---- - - ---- - _ +12'-0"
+12'- ------ --- - --
PREFINISHED
TOP OF ROOF
TOP OF ROOF
PREFINISHED
o
WINDOW UNITS
STUCCO 1
WINDOW UNIT
/ E
o
STUCCO
1
a
o
i OA ii OA ii
OA
ii
OA
%i OA
ii
OA
o
o
/Z
-
FIG. FE.,)eR
STUCCO 1 SUCCO CONTROL
/JOTINTS
STUCCO
CONTROL
STUCCO 1
JOINTS
RIGHT EXTERIOR ELEVATION
3/16"
= T-0
E
LEFT EXTERIOR ELEVATION
3/16" =
1'-0"
3
Q
Q
BUILDING MATERIALS - THIS
ELEVATION:
TOTAL AREA: 1,280 SF.
MASONRY: 992 SE 77%
ELEVATION
BEYOND
PREFINISHED METAL GUTTER
ELEVATION BEYOND
GLASS: 288 SF. 23%
PREFINISHED METAL
COPING
N
+12'-0"
TOP OF ROOF
PREFINISHED
WINDOW UNITS
STUCCO 1
n
0
ii OA
% OA
ii
OA
ii OA
ii
OA
%'
OA
OA
OA
0
----- -----
-
-----
-----
---
--
- -
- - -
- - - - - - -
0, O„
- -
FIN. FLOOR
4"x 4" PREFINISHED
STUCCO
1
ALL DOWNSPOUTS
SHALL BE DIRECTLY
STUCCO CONTROL
STUCCO 2
METAL DOWNSPOUT, TYPICAL
CONNECTED TO UNDERGROUND
STORM DRAIN
PIPING
JOINTS
REAR EXTERIOR ELEVATION
3/16" =
1'-0"
2
3/16"
= 1'-0"
6
3/16" =
1'-0"
1
LICENSED
ARCHITECT
AR-986980
MPATYALLEN
COMEAUX
STATE OF IDAHO
05/24/21 ISSUED FOR REVIEW
06/30/21 REVISION zEh
M COMEAUX
A R C H I T E C T S
2121 Brittmoore Rd. #1300
Houston, Texas 77043
832.530.4769
DEVELOPER
MRS Landholdings
1716 N. Stagno Bello Place
Eagle, ID 83616
707-999-8006
Justin Waters
CONSULTANTS
CIVIL ENGINEER
J-U-B Engineers, Inc.
2760 W. Excursion I Suite 400
Meridian, ID 83642
208-376-7330
MEP ENGINEER
APM Engineering & Design
202 Industrial Blvd.. Suite 403
Sugar Land, TX 77478
832-332-1521
STRUCTURAL ENGINEER
BEC Engineers and Consultants, LLC
3200 Wilcrest Dr. Suite 440
Houston, TX 77042
832-240-3771
LANDSCAPE ARCHITECT
Adam L. Sutliff, RLA
11020 Meadow Rue
The Woodlands, TX 77380
713-4105111
PROJECT NAME
Sawtooth
Landing
Office
Condominiums
PROJECT ADDRESS —
1450 W. USTICK RD.
MERIDIAN, ID 83646
PROJECT NUMBER
20018
SHEET NAME
EXT. ELEVATIONS
4- UNIT BLDG.
SHEET NUMBER no
A5mO