ACHD Transmittal (A-2021-0109)Applicant name:MICHAEL SALISBURY, LKV ARCHITECTS Phone:
Applicant address:2400 E. RIVERWALK DRIVE, BOISE, ID 83706 Email:michael@lkvarchitects.com
Owner name:DARYL ZACHMAN, CALVARY CHAPEL TREASURE VALLEY Phone:Fax:
Owner address:9226 W. BARNES DR., BOISE, ID 83709 Email:daryl@calvarytv.org
Administrative
Applicant Information
Type of Review Requested
File number:A-2021-0109
Assigned Planner:Joseph Dodson
Related Files:
Subject Property Information
Location/street address:
Assessor's parcel number(s):S1404212450
Township, range, section:2N1E4
Agent name (e.g. architect, engineer, developer, representative):WAYNE THOWLESS
Firm name:LKV ARCHITECTS Phone:Fax:
Address:2400 EAST RIVERWALK DR.Email:Wayne@lkvarchitects.com
Contact name:Phone:Fax:
Contact address:Email:
Project/Application Name:Calvary Chapel Treasure Valley - DES, CZC
Description of Work:
CZC & Design Review for Phase 1 site improvements including a new 24,872 square foot, single-story (35'
WDOOIDoDGHHOHPHQWVDORQJ8VWLFNFKXUFKEXLOGLQJZLWKDVHDWVDQFWXDU\SDUNLQJVSDFHVSDWLRDQG
outdoor amphitheater, and associated landscaping on 6.5 acres of land in the R-15 zoning district.
Project Description
Planning Division
ADMINISTRATIVE APPLICATION
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
1
APPLICATION TYPES
Is this application exempt from fees?:No
Certificate of Zoning Compliance - CZC:CHECKED
Does project have prior approval?:Yes
Does your project contain new construction and/or modifications to an existing
building or the site?:
Yes
Design Review - DES:CHECKED
ADDRESS VERIFICATION
Address Verification Permit Number:LDAV-2021-0384
TYPE OF USE PROPOSED
Other Type of Use Proposed:Church
PUBLIC WORKS INFRASTRUCTURE
Does this project require the extension of public infrastructure?:No
PROPERTY INFORMATION
General Location:Poiema subdivision
Current Land Use:Vacant
Total Acreage:8.398
Prior Approvals (File Numbers):H-2020-0035 (AZ,PP); H-2020-0095 (CUP)
ZONING DISTRICT(S)
R-15:CHECKED
PROJECT INFORMATION
Site Plan Date (MM/DD/YYYY):5/28/2021
Landscape Plan Date (MM/DD/YYYY):3 /19/2021
Elevations Date (MM/DD/YYYY):5/28/2021
Percentage of Site Devoted to Building:8.8
Percentage of Site Devoted to Landscaping:35.7
Percentage of Site Devoted to Paving:55.5
Who will own and Maintain the Pressurized Irrigation System in this Development:Poiema Subdivision HOA
Irrigation District:New York Irrigation District
Primary Irrigation Source:Pressurized Irrigation
Secondary Irrigation Source:City Water
Square Footage of Landscaped Areas to be Irrigated by City Water Connection:56,000
Proposed Building Height:35' T.O. Wing Wall 27' T.O. Roof
Existing Floor Area (If Applicable):N/A
Gross Floor Area Proposed:24,872
Number of Standard Parking Spaces Provided:153
Number of Compact Parking Spaces Provided:0
Number of Employees:10
Application Information
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
2
Number of Residential Units:0
Minimum Square Footage of Living Area (Excluding Garage):N/A
Gross Density:N/A
Net Density:N/A
In Reclaimed Water Buffer:No
TIME EXTENSION INFORMATION
Number of months extension:24
APPLICATION DISCLAIMER
I have read and accept the above terms:CHECKED
Your signature:michael salisbury
33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642
Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org
3