Loading...
PZ - Landscape Plan I ' EP EP EP EP EP- EP- - tP - '— o EAST WASHINGTON AVENUE Landscape Notes: '�i= T H E i r '1 I SS SS - A. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER wlic WE i SS SS SS SS SS SS S SS SS SS SS SST SS SS SS SS EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. LAN D ~ I B. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING _ _ _ _ _ _ _ _ _ _ _ _ - PLAN REMOVE RIDGES AND FILL DEPRESSIONS AS REQUIRED TO MEET FINISH GRADES GROUP - - - C. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12" OF TOPSOIL. SPREAD, ' - 2606 - - -- - i COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. wv — o , W W W W W W W - W - - W- - - W W W N D. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL W _ _ MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN EP EP EP��p_1�— EIP - - - AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH ------------------------ ---�----- - - -EP EP E� - - I 4)-FT VISION TRIANGLE MTR =- _____--------------------=—___- OF 5.5 TO 7.0. IF ON SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO �Q I I --$-------- - —XX—XX—X—1 EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY a --- --------------------------- - - - LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL - ------ ---------- - - --.•.-.•. . �^•�•�� _ _ � OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. --- - - - E. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND i 9/ I \ -- - - - - - - •, FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC Lq . I � --- �--- MATTER HARMFUL TO PLANT GROWTH _ _ _ - OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT / = R � o - - - - - - PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF I / 01t_—_ __ - - 64 ` • - • - ` . NOT LESS THAN 4 INCHES. / - - - G. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE INSTALLATION.REMOVE ALL ROOTS, WEEDS, I� Iw o �� _ - _ NVA _ _ ROCKS AND FOREIGN MATERIAL ON THE SURFACE. �- - - _ H. NEW TREE PLANTING, SEE DETAIL 1/L1.00. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, LE..... FROM _ -`.+ BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. I. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. CD I - - - - - - - X``•` PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. I I . . . . . . . J. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF SUBSTANTIAL o =____- _ _ - X```�```�-�`�`+ COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE 1.5"W - • • - • SAME SIZE AND SPECIES AT NO COST TO THE OWNER. _____- - - - - _ - K. TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR TREE PIT BACKFILL AT I - - - - - - - - - _ • • THE FOLLOWING RATES. BLEND AMENDMENTS THOROUGHLY WITH SOIL BACKFILL. TREE PITS SHALL BE 5'x5'x1.5' 37.5 - - - - - - - �. . . . . . . -. - CF/1.5CY . w _—= T--=_- - _ - �•�•`•`•`•`- K.A. APPLICATION RATES: - - - - - - - - - - K.A.A. HUMIC ACID: 25 LBS PER TREE PIT O - -_, - - - 9 _ _ K.A.B. COMMERCIAL GRADE COMPOST- 10 CUBIC FEET PER TREE PIT — — - - - - - - - - - - 14 - - - - - - - - _ - - - - - - - - - - - - - - - -" _ - / K.A.C. PLANTING TABLET FERTILIZER-4 TABLETS PER TREE PIT o __- f -_____ - ___ - - - - - - __ _- _ _ _______________--:.:.. .. ..: K.A.D. CALCIFIED DIATOMACEOUS EARTH 75 LBS PER TREE PIT O o" — i w F -_/- _ ____ __________- __ __ _____________ _ _ ��`•- L. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND - - - - - - - - - - - - - - __ _ _ __ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -X ` `'` - DISPOSE OF PROPERLY OFF SITE. = - - _ _ _ _ _ _ _ - - __ - - _ _ - - - _ _ - _ - - - - - - - - - - - - - - - -- •• -�••` M. CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO LANDSCAPE ARCHITECT FOR o � - - 1=______- _ _ _ _,�,•, APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, i I -7 - - - - - - - -_ _ _ _ ` • ` ` SUBMIT 1 GALLON BAG SAMPLE TO OWNER. y I LU a I _ ____- - - - - - _ ______________ - _�- • . � . - • MaterialLegend: Z - Qi I o �__—___________- _ -X`,`-`-`-`,`,`, SOD REPAIR ZONE __= 3/4 INCH ROAD MIX-DEPTH - - — - - - - -- - - -_ -- 1 - - - 2-INCHES. 2 = � _ — — — — — — — IEEE- - - - - - - y w - - - - - - �_— _ _ — C( =x-` c - _- _ -_-_\_ -_ _ _ = - �: • * ` * - '` PLANT SCHEDULE — — — — i l Cn r=_—________ ____ _ = TREES BOTANICAL/COMMON NAME SIZE CONTAINER C�J w a — _ _ _ _ _ _ _ _ _ _ _ - = T - `�`�```�```�`• PFV PINUS FLEXILIS 'VANDERWOLF'S PYRAMID' /VANDERWOLF'S PYRAMID PINE 6� HT. B&Bcc - - - - - - - - - - - - - - - - _ _ To - - - - - - - - - - - - - - - - - - i CD - - - - - - - - - - - - - - - N - - - - - - - - - - - - - Sheet Notes: �"� I _ _ = _ - _- =_-_ =-== _=_ === - __- ___- -__ x` O - - - - - - - - - -I - - - - - - - - _- - - - - - - - - -- - -- - - - - - - - - - _ `�•�` •�` ��•. 1. PROJECT CALCULATIONS: L¢ w - -  - - - - - -- - - - 1 - - STREET TREES: 7 REQUIRED 14 PROVIDED �1111111111110 lam = �r - - - - - - - - - - - - - - I v - - - STREET BUFFER: IOFT - - - - - - - - - - - - - - - `•`.```.--`• PARKING LOT LANDSCAPE STRIP: NA �•- . . i I __ _____—_____- - _ _ X . BUFFER BETWEEN LAND USES: NA I I O w - - _ - - - - - - - - PARKING STALLS WITH NATURAL LANDSCAPING: 1 STALL z __- _____ _ __- - •`•�``•.``�.• TOTAL NUMBER OF TREES: 14 TOTAL acc w o - - - - - - - - - - - TREE MITIGATION: NONE w _ - - _ — — — — — — — — — — — — — — ` N i W W- W W �� - - - - - - - - - - - - O c~/) _ — — — — — —X -.`. CV COL] o — — — — — — — — — — — — . . . . . . - - - - - - - - - - - - - - - - - CT 0 I � x . � V _ I = — — — — — — — — — -- — — _ — JI . . - - - ` W C= © _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Q L - �C� ` O z _-_- - - - - - - - - - - -_ - NOTES: a) °o L6 CD H - - - - - - - -- - -- - - -•-•� � � o w - X- - - 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO OHP o -- - - - - - - - - - - - - - - RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN OHP - - - - - - - - - - - - - - - - - - - '.`.', STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; HP � - - - - - - - - - - - _ _ _ _ _ _ - _ - _ - - - - - - - - - - - - - - - - - - - IMPROPERLY PRUNED TREES AS DETERMINED BY THE 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ YEAR WARRANTY PERIOD. ( Revisions -_ _— - - - -_- -_ _ -_ _ _-_- -_ —______________ .*.`.+ 2. DRAWING HE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - INOTIFY THE N THE EVENT LANDSCAPE A QUESTION IT LACK OF CLARITY ON THE S,T •, 3. LANDSCAPE CONTRACTOR RIS TO NOTIFY°THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO w - - - - - - - - - - - - - - - - - - - - - INSTALLATION OF PLANT MATERIAL. -_ X` 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR PREVAILING WIND DIRECTION i - - -_ -_- - - - - _- - - _ -_� _ ••``` FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO - - _ _ _ _ - - _ _ _ - - _ x o _ • • PREVENT SLIPPAGE. _ •, 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. o o RUBBER CINCH TIE w - - - - - - - - - - - - - - - - - 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE - - - - - - - - - - - - - - - - - -,•,`, : - - - - - - - - - - - - - - - - _x. ARCHITECT IMMEDIATELY. 0 2"x 2"x 8'CEDAR STAKE DO NOT PENETRATE ROOTBALL. - - - - - - - - - - - - - - - - _ -_ _ - - - - - - - - - - _�.....'. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. I I_ _ - -_ - - - - - - - -, w i I _ _ - _ _ _ _ _ _- - - - - — = w`- SOIL LINE \� _ - _� - _ J MULCH LAYER, KEEP MULCH 3"AWAY FROM I` X— - �—X X--�F-- - - . . . X i ® - - � I ;JJv� TRUNK I - ~ i I 111 =I __ - • • UTILIZE SOIL/ROOT PROBE AROUND TRUNK T' \\ BACKFILL WITH SOIL PLANTING MIX. SEE I I _ - _ �6 ��`��•+ (APPROX. 3-4 AWAY FROM TRUNK)TO LOCATE \ 31 �\\I I I I I I//7/ _- - - - - - - - - - - - - - - - - - - - - - - - - - - O SPECIFICATIONS FOR ADDITIONAL INFORMATION. OF - ` HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE �L �E Ogyo - - - - - - - - - - - - - - - X' POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. tA�L R.Tyr = x - - - - — - -- '� — —— x—x�xr-rx�x��r�-xT�c— —��.'.`.'. �� �� FINISH GRADE o o • - ` REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP .� - - - /OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC \ - _ r^ 1FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \� / COMMERCIAL SLOW RELEASE FERTILIZER TABLETS _ r~ ti LA-16 88 I ox I WRAP THE ROOTBALL, IT SHALL BE COMPLETELY \�\�/\��\�� /\�,/j// - REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE // / // // // // // / / // / // // i 4 o ® LEFT ON THE BOTTOM OF THE ROOTBALL. ��/\\ \/\\/\\�/\\�/\\�/\\�/\�/\�/\�/\/\\� �� /�7/NDSCA\\\�� // // // // // // // // //,// / / SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL D6/28/2021 x �6�j 2x ROOTBALL DIAMETER Project No.: 121056 Coniferous Tree Planting 3x ROOTBALL DIAMETER Date of Issuance: 06.28.2021 x Project Milestone: CUP �6 Scale: NITS CD m CD X I O� I I I I Landscape Plan E_ Landscape Plan 10' 20' @E� L 1 .0 0 Horizontal Scale: 1" = 10'