Loading...
Trash Enclosure3 1/2"4"PRE-FINISHED METAL COPING 8" CMU STONE VENEER (3/4" - 1 1/2") 2X WOOD PLATE W/ PLYWOOD CAP, SLOPE FRAMING, BOLTED @ 32" O.C. MEMBRANE FLASHING 3' - 6"2' - 0"6"1' - 4" PRE-MANUF. BOLLARD CAP ("TOPGARDCAP OR EQUAL), PAINT 4" DIA. STEEL PIPE BOLLARD, FILL W/ CONCRETE, PAINT EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE 16" DIA. CONCRETE FOOTING 3/4"1 1/2"3/4" INSTALL FIBER WEEPS @ 24" O.C. MAX. PVC FLASHING MEMBRANE (SHAPE TO WALL) FLASHING STONE VENEER (3/4" - 1 1/2") 8" CMU FOUNDATION WALL 1' - 0"2' - 1"TYP. 2' - 0" STORAGE FINISH FLOOR REFER TO CIVIL FOUNDATION WALL, CONT. 6" X 6" X 1/4" TUBE STEEL GATE COLUMNS, (REFER TO STRUCTURAL) W/ PAINTED FINISH. COLOR: EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE STONE VENEER (3/4" - 1 1/2") 8" CMU T.O.M 6' -0" ABOVE STORAGE FLOOR SEE CIVILSLAB EL. VARIES6' - 11" COL. LENGTH W/ GROUTCONT. FOOTING CONC. SLAB ON GRAVEL BASE, REFER TO CIVIL SHEET METAL COPING ON BUILT- UP WOOD NAILERS 2X JOISTS, REFER TO STRUCTURAL 2X LEDGER, REFER TO STRUCTURAL 8" CMU, REFER TO STRUCTURAL STONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING T.O.M. 5' -4" ABOVE FINISH FLOOR 10" CMU, REFER TO STRUCTURAL PIPE BOLLARDS, PAINT EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE 6" CONCRETE SLAB 6" OVER GRAVEL BASE CONCRETE FOOTING & FOUNDATION, REFER TO STRUCTURAL 4" CONCRETE SLAB OVER 4" GRAVEL BASE R-19 BATT INSULATION 5/8" GYP. BD. (PAINT) PLYWOOD SHEATHING, REFER TO STRUCTURAL TPO MEMBRANE ROOFING (WRAP OVER PARAPET) T.O.M. 10' -0" ABOVE FINISH FLOOR FINISH FLOOR REFER TO CIVIL INSTALL MEMBRANE FLASHING & SEALANT TO SEAL CEILING VAPOR RETARDER TO WALL 8" CMU, REFER TO STRUCTURAL STONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING FINISH GRADE 1/2 12 PLYWOOD SHEATHING TPO MEMBRANE ROOFING (WRAP OVER PARAPET) BLOCK OUT FOR SCUPPER R-19 BATT INSULATION W/ VAPOR RETARDER 5/8" GYP. BD. (PAINT) OPEN WIRE SHELVING 48" W X 12" D X 72" H (ULINE MODEL NUMBER H-2937-72 OR APPROVED EQUAL) 4" CONCRETE SLAB OVER 4" GRAVEL BASE INSTALL MEMBRANE FLASHING & SEALANT TO SEAL CEILING VAPOR RETARDER TO WALL 4' - 0"6' - 0"10" CONCRETE FOOTING & FOUNDATION, REFER TO STRUCTURAL FINISH GRADE DOWNSPOUT STONE VENEER (3/4" - 1 1/2") COLOR TO MATCH BUILDING 8" CMU, REFER TO STRUCTURAL SHEET METAL CONDUCTOR T.O. JOIST 8' -9" ABOVE FINISH FLOOR SHEET METAL SCUPPER, PROVIDE MEMBRANE FLASHING STEEL LINTEL ANGLE FINISH FLOOR REFER TO CIVIL CONCRETE FOOTING & FOUNDATION, REFER TO STRUCTURAL ALUM. THRESHOLD 8 3/4" DEEP HOLLOW METAL DOOR & FRAME (PAINT) STEEL LINTEL4"2X LEDGER, REFER TO STRUCTURAL 2X JOISTS, REFER TO STRUCTURAL T.O.M. 10' -0" ABOVE FINISH FLOOR SHEET METAL COPING ON BUILT-UP WOOD NAILERS 3"3"5/8"1 1/2" 5/8" DIA. PAINTED STEEL TIE ROD ON BACK SIDE CORRUGATED METAL 'B' DECK, WELD TO FRAME, PAINT 3" X 3" X 1/4" STEEL ANGLE GATE FRAME, PAINT RETURN TOP OF PIN 3" 3" X 3" X 1/4" STEEL ANGLE GATE FRAME, PAINTED STEEL PIPE SLEEVES, WELD TO FRAME 1" STEEL PIN CONC. SLAB ON BASE COURSE, OVERLAIN ON GRANULAR SUBBASE COURSE, REFER TO GEOTECHNICAL REPORT STEEL PIPE SLEEVE, GALV. 8"1' - 6"4"3"3"6"4"OUTDOOR STORAGE 201 AS101 A3 AS101 A2 TRASH CONTAINER LOCATION 4" DIA. PIPE BOLLARD 4" DIA. PIPE BOLLARD CONCRETE LANDING, REFER TO CIVIL CONCRETE APRON, REFER TO CIVIL 6" DIA. PIPE BOLLARD 2' - 0"FOOTING BELOW, REFER TO STRUCTURAL B1 AS101 B3 AS101 A1 AS101 AS101C4 AS101 D5 AS101 D4 6' - 7"4' - 3"17' - 4" 5' - 4"12' - 0"8' - 8"201AD6 AS101 D6 AS101 CONCRETE SPLASHBLOCK SHEET METAL DOWNSPOUT STONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING 12" X 12" DOWNSPOUT CONDUCTOR PROVIDE OPENING IN MASONRY FOR SCUPPER SHEET METAL COPING LIGHT FIXTURE, REFER TO ELECTRICAL SHEET METAL COPING FOOTING & FOUNDATION, REFER TO STRUCTURAL STONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING C5 AS101 FINISH FLOOR REFER TO CIVIL D6 AS101 FINISH FLOOR REFER TO CIVIL STONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING SHEET METAL COPING LIGHT FIXTURE, REFER TO ELECTRICAL FOOTING & FOUNDATION, REFER TO STRUCTURAL SHEET METAL COPING 5/8" DIA. PAINTED STEEL TIE ROD ON BACK SIDE, TYP. CORRUGATED METAL 'B' DECK, PAINTED EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE (3) WELDED BARREL HINGES PER DOOR. RATED FOR THE WEIGHT OF THE DOOR, TYP. T.O. GATE COLUMN 5'-11" ABOVE STORAGE FLOOR HEAVY DUTY DOUBLE GATE LATCH. DAC STEALTH SERIES, SENTRY LATCH OR APPROVED EQUAL (T.O. GATE TO ALIGN W/ GATE COLUMN), TYP. AS101 D2 D3 AS101 DOOR, REFER TO SCHEDULE, PAINTED EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE 3' - 6"1' - 4" PRE-MANUF. BOLLARD CAP ("TOPGARDCAP OR EQUAL), PAINT 6" DIA. STEEL PIPE BOLLARD, FILL W/ CONCRETE, PAINT EP-1, REFER TO EXTERIOR MATERIAL SCHEDULE 16" DIA. CONCRETE FOOTING 6"TO T.O. FOOTINGSTONE VENEER (3/4" - 1 1/2"), COLOR TO MATCH BUILDING SHEET METAL COPING LIGHT FIXTURE, REFER TO ELECTRICAL PIPE BOLLARD, TYP. FOOTING & FOUNDATION, REFER TO STRUCTURAL FINISH FLOOR REFER TO CIVIL D6 AS101 D6 AS101 C5 AS101 2' - 3"1' - 8"2" X 2" SQUARE TUBE ARC BICYCLE RACK, 2 BIKE CAPACITY, BY DERO BIKE RACK CO., REFER TO SPEC. SIDEWALK, REFER TO CIVIL BUILDING OUTLINE LANDSCAPING, REFER TO LANDSCAPE LANDSCAPING, REFER TO LANDSCAPE AS101 D1 BICYCLE PARKING REQUIRED: 2 PROVIDED: 2 CONCRETE SIDEWALK OVER GRAVEL BASE 4" MIN. INSIDE DIA. CORROSION RESISTANT SLEEVE FILLED W/ EPOXY GROUT, REFER TO MANUFACTURER'S INSTALL INSTRUCTIONS 2" X 2" SQUARE TUBE ARC BICYCLE RACK, 2 BIKE CAPACITY, BY DERO BIKE RACK CO., REFER TO SPEC.2' - 11"3' - 4" 2" SANDERSASSOCIATES ARCHITECTS 2668 Grant Avenue Ogden, Utah 84401 Phone: 801.621.7303 www.sandersarch.com SAA Sheet Number Drawing Title SAA Project No. Consultant Seal RevisionProject Name# No. Date Description Issued 54321 54321 A B C D A B C D City Approval AS101 DUMPSTER SHED PLAN, ELEVATIONS, & DETAILS, & BIKE RACK DETAILS 2020-19MERIDIAN IDAHO BRANCHMOUNTAIN AMERICA CREDIT UNION6161 N. TEN MILE ROADMERIDIAN, ID 836463" = 1'-0" D6 COPING DETAIL 1/2" = 1'-0" D5 BOLLARD DETAIL 3" = 1'-0" C5 DRIP EDGE DETAIL 3/4" = 1'-0" A1 DUMPSTER SECTION 1/2" = 1'-0" B3 SHED SECTION 1/2" = 1'-0" B1 SHED SECTION SIDE 3" = 1'-0" D3 GATE DETAIL 1" = 1'-0" D2 GATE DETAIL 3/8" = 1'-0" A5 DUMPSTER SHED PLAN 3/8" = 1'-0" A2 DUMPSTER SHED BACK ELEVATION 3/8" = 1'-0" A3 DUMPSTER SHED FRONT ELEVATION 1/2" = 1'-0" D4 BOLLARD DETAIL 3/8" = 1'-0" C4 DUMPSTER SHED SIDE ELEVATION 3/8" = 1'-0" D BIKE RACK ENLARGED PLAN 1" = 1'-0" D1 BIKE RACK MOUNTING DETAIL No. Date Description