Loading...
ElevationsFG S-1 MC-1 D2 AE202 D2 AE202 OWNER PROVIDED DRIVE-THRU SIGNAGE B.O. FOOTING 50.75 T.O. WALL 73.29 B.O. FOOTING 52.75 87 MC-1 S-1 STN-1 3' - 0"AE202 D4 B.O. FOOTING 52.75 T.O. WALL 73.29 B.O. FOOTING 50.75 F G S-1 MC-1 STN-1D2 AE202 D2 AE202 T.O. WALL 73.29 B.O. FOOTING 52.75 8 7 S-1 MC-1 STN-1 D2 AE202 D2 AE202 B.O. FOOTING 52.75 T.O. WALL 73.29 1' - 6"4' - 0" 6"MIN.6"MIN.2' - 6"REFER TO PLAN2' - 0" MIN.PRE-MANUF. BOLLARD WRAP, (BY OWNER) JOINT FILLER W/ SEALANT CONCRETE PAVINGCONCRETE ISLAND, REINF. W/ #4 @ 18" O.C., B.W. STEEL PIPE BOLLARD (REFER TO DETAIL FOR SIZE), FILL W/ CONCRETE 12" DIA. CONCRETE FOOTING REFER TO DETAIL FG B2 AE202 AE202 B1 AE202 D2 PREFINISHED METAL COPING MEMBRANE ROOFING OVER TAPERED INSULATION VAT TUBING, BY DIEBOLD METAL SOFFIT CONCRETE ISLAND VAT TUBING: GENERAL CONTRACTOR TO PROVIDE & INSTALL CLEAN, FINE, & WASHED FILL SAND, W/ NO MORE THAN MAX. OF 1/8" AGGREGATE. SAND IS TO BE FILLED 6" BELOW, 12" ABOVE & 18" ON SIDES OF THE PNEUMATIC TUBES. SAND IS TO BE HAND FILLED W/ LIBERAL AMOUNTS OF WATER TO PROMOTE LEVELING, SETTLING & ELIMINATE AIR POCKETS & HAND TAMPED. (NO MECHANICAL LOADERS OR TAMPING COMPACTORS ARE TO BE ALLOWED) (ASTM C144-11). AE202 D3 DECK BEARING 71.29 NOTE: TOP AND BOTTOM ELEVATIONS OF DRIVE-THRU ARE REFERENCING CIVIL ELEVATIONS. CIVIL ELEVATIONS ARE USED ON THIS SHEET ONLY. THE REST OF THE CONSTRUCTION DOCUMENTS REFER TO ARCHITECTURAL ELEVATION OF 100' - 0". B.O. FOOTING 52.75 B.O. FOOTING 50.75 SOFFIT 67.29 T.O. WALL 73.29 T.O. PIER 55.79 T.O. PIER 56.59 APPROXIMATE EXISTING GRADE STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT REMOVE EXISTING NON-ENGINEERED FILL SOILS. REPLACE W/ STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT IN SPECIFICATIONS. (GEOTECHNICAL ENGINEER SHALL OBSERVE THE FOOTING / FOUNDATION / CONCRETE SLAB / CONCRETE PAVEMENT / EXTERIOR FLATWORK EXCAVATIONS TO IDENTIFY THAT ALL UNSUITABLE SOILS HAVE BEEN REMOVED AND THAT SUI TABLE SOILS HAVE BEEN ENCOUNTERED, BEFORE PROCEEDING WITH FOOTING CONSTRUCTION). PROVIDE NEW STRUCTURAL FILL AS REQUIRED IN THE GEOTECHNICAL REPORT. 8 7 B3 AE202 AE202 B1 DECK BEARING 71.29 SOFFIT 67.29 T.O. WALL 73.29 APPROXIMATE EXISTING GRADE REMOVE EXISTING NON-ENGINEERED FILL SOILS. REPLACE W/ STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT IN SPECIFICATIONS. (GEOTECHNICAL ENGINEER SHALL OBSERVE THE FOOTING / FOUNDATION / CONCRETE SLAB / CONCRETE PAVEMENT / EXTERIOR FLATWORK EXCAVATIONS TO IDENTIFY THAT ALL UNSUITABLE SOILS HAVE BEEN REMOVED AND THAT SUITABLE SOILS HAVE BEEN ENCOUNTERED, BEFORE PROCEEDING WITH FOOTING CONSTRUCTION). PROVIDE NEW STRUCTURAL FILL AS REQUIRED IN THE GEOTECHNICAL REPORT. STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT T.O. WALL SEE ELEVATION DECK BEARING SEE SECTIONS T.O. BEAM SEE SECTIONS 7" SOFFIT SEE R.C.P.PLYWOOD SHEATHING PREFINISHED METAL SOFFIT PANELS PREFINISHED METAL 'L' TRIM AT REVEAL, (INSTALL SEALANT AT JOINTS) WOOD NAILERS STRUCTURAL CLIP, REFER TO STRUCTURAL LIQUID-APPLIED AIR & WATER BARRIER 3 5/8" STRUCTURAL STUDS STEEL BEAM, REFER TO STRUCTURAL PLYWOOD SHEATHING FIBER CEMENT LAP SIDING, BLIND NAIL STEEL DECK MEMBRANE ROOFING OVER TAPERED INSULATION PREFINISHED METAL FLASHING AE202 D1 PRE-FINISHED METAL COPING 4 1/4"1/2"TREATED PLYWOOD FASTENER W/ NEOPRENE WASHER @ 12" O.C. ROOF MEMBRANE TO EXTEND UP PARAPET OVER TOP & FACE OF SHEATHING 5/8" GYP. SHEATHING STRUCTURAL STUDS, REFER TO STRUCTURAL ROOF MEMBRANE STRIP OVER TOP & FACE OF BLDG. SEAL TO PARAPET ROOF MEMBRANE 4 1/2"TREATED WOOD SHIMS WRAP CAP W/ MEMBRANE LAG SCREW 32" O.C. FIBER CEMENT LAP SIDING, BLIND NAIL PLYWOOD SHEATHING, REFER TO STRUCTURAL LIQUID-APPLIED AIR & WATER BARRIER T.O. WALL REFER TO ELEVATIONS 3' - 0"1' - 6"1' - 6"8 3/4"6"1' - 0"PNEUMATIC TUBES N.I.C. 12" CLEAN FILL SAND W/ NO MORE THAN 1/8" AGGREGATE ABOVE VAT TUBING: GENERAL CONTRACTOR TO PROVIDE & INSTALL CLEAN, FINE, & WASHED FILL SAND, W/ NO MORE THAN MAX. OF 1/8" AGGREGATE. SAND IS TO BE FILLED 6" BELOW, 12" ABOVE & 18" ON SIDES OF THE PNEUMATIC TUBES. SAND IS TO BE HAND FILLED W/ LIBERAL AMOUNTS OF WATER TO PROMOTE LEVELING, SETTLING & ELIMINATE AIR POCKETS & HAND TAMPED. (NO MECHANICAL LOADERS OR TAMPING COMPACTORS ARE TO BE ALLOWED) (ASTM C144-11). 4' - 1 1/4" ASPHALT PAVING OVER GRAVEL BASE, REFER TO CIVIL MEMBRANE FLASHING (3" LAP) LIQUID APPLIED AIR & WATER BARRIER, CONT. METAL FLASHING W/ 6" MIN. VERTICAL LEG, SET IN SEALANT LATICRETE MORTAR STONE VENEER (3/4" TO 1 1/2") 1/4" CONCRETE BACKER BOARD LIQUID-APPLIED AIR & WATER BARRIER FIBER CEMENT LAP SIDING, BLIND NAIL SANDERS ASSOCIATES ARCHITECTS 2668 Grant Avenue Ogden, Utah 84401 Phone: 801.621.7303 www.sandersarch.com SAA Sheet Number Drawing Title SAA Project No. Consultant Seal RevisionProject Name# No. Date Description Issued 54321 54321 A B C D A B C D City Approval AE202 DRIVE-THRU ELEVATIONS, SECTIONS, & DETAILS 2020-19MERIDIAN IDAHO BRANCHMOUNTAIN AMERICA CREDIT UNION6161 N. TEN MILE ROADMERIDIAN, ID 836463/16" = 1'-0" A5 DRIVE-THRU NORTH ELEVATION 3/16" = 1'-0" A3 DRIVE-THRU EAST ELEVATION 3/16" = 1'-0" A1 DRIVE-THRU SOUTH ELEVATION 3/16" = 1'-0" B5 DRIVE-THRU WEST ELEVATION EXTERIOR MATERIAL SCHEDULE MARK MANUF. PRODUCT COLOR / FINISH EXTERIOR PAINT EP-1 SHERWIN WILLIAMS EXTERIOR PAINT SW6990 CAVIAR 251-C2, EGGSHELL MASONRY STN-1 DELTA STONE STONE VENEER IVORY WHITE MECHANICAL SCREEN MS-1 GEOLAM QUALITA 020C EBONY, END CAPS @ ALL EXPOSED ENDS METAL MC-1 SEE SPEC. 076200 PRE-FINISHED METAL COPING SEE SPEC. METAL PANEL MP-1 ALPOLIC METAL PANEL SBR BRONZE SIDING S-1 FIBER CEMENT LAP SIDING CEDAR TEXTURE FINISH, PAINT SW7026 GRIFFIN ST-1 FIBER CEMENT LAP SIDING TRIM CEDAR TEXTURE FINISH, PAINT SW7026 GRIFFIN 1/2" = 1'-0" D3 ISLAND & BOLLARD DETAIL 3/16" = 1'-0" B3 DRIVE-THRU SECTION 3/16" = 1'-0" B2 DRIVE-THRU SECTION 1 1/2" = 1'-0" B1 CANOPY DETAIL 3" = 1'-0" D1 PARAPET DETAIL 3/4" = 1'-0" D4 TRENCH DETAIL 3" = 1'-0" D2 WALL DETAIL No. Date Description