Loading...
Elevations_Page_2City Approval D DECK BEARIN, SECTIONS C SOFFIT SEE R.C.P. B A (INSTALL SEALANT AT JOINTS) CANOPY DETAIL 1 1 /2" = 1'-0" STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT REMOVE EXISTING NON -ENGINEERED FILL SOILS. REPLACE W/ STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT IN SPECIFICATIONS. (GEOTECHNICAL ENGINEER SHALL OBSERVE THE FOOTING / FOUNDATION / CONCRETE SLAB / CONCRETE PAVEMENT / EXTERIOR FLATWORK EXCAVATIONS TO IDENTIFY THAT ALL UNSUITABLE SOILS HAVE BEEN REMOVED AND THAT SUITABLE SOILS HAVE BEEN ENCOUNTERED, BEFORE PROCEEDING WITH FOOTING CONSTRUCTION). PROVIDE NEW STRUCTURAL FILL AS REQUIRED IN THE GEOTECHNICAL REPORT. L _ J DRIVE-THRU SOUTH ELEVATION 3/16" = 1'-0" B3 A E202 DRIVE-THRU SECTION 3/16" = 1'-0" FIBER CEMENT LAP SIDING, BLIND NAIL _IQUID APPLIED qIR & WATER 3ARRIER, CONT. MEMBRANE :LASHING (3" LAP) METAL FLASHING ✓V/ 6'' MIN. VERTICAL LEG, 3ET IN SEALANT _ATICRETE MORTAR STONE VENEER 3/4'' TO 1 1 /2'') 1 /4'' CONCRETE 3ACKER BOARD _IQUID-APPLIED qIR & WATER 3ARRIER WALL DETAIL D2 3" = 1'-0" T.O. WALL 73.29 DECK BEARING 71.29 STEEL PIPE BOLLARD (REFER TO DETAIL FOR SIZE), FILL W/ CONCRETE CONCRETE ISLAND, REINF. W/#4@ 18'' O.C., B.W. REFER TO DETAIL 3 PRE-MANUF. BOLLARD WRAP, (BY OWNER) JOINT FILLER W/ SEALANT z Q CONCRETE O PAVING w Lu a z 1% IIa�oo0 � IVEHMA—Hal �� I �I IIIII IIII IIII Illll i• IIII�I�I IIIIII II a II z_ N 12'' DIA. I u L _ J CONCRETE L _ J FOOTING 6° 4'- 0" ISLAND & BOLLARD DETAIL D3 1 /2" = 1'-0" /B2 G A E202 PREFINISHED TAL COPING SOFFIT 67.29 VAT TUBING: GENERAL CONTRACTOR TO PROVIDE & I INSTALL CLEAN, FINE, & WASHED FILL SAND, W/ NO MORE THAN MAX. OF 1 /8'' AGGREGATE. SAND IS TO BE FILLED 6'' BELOW, 12'' ABOVE & 18'' ON SIDES OF THE ' PNEUMATIC TUBES. SAND IS TO BE HAND FILLED W/ I LIBERAL AMOUNTS OF WATER TO PROMOTE LEVELING, SETTLING & ELIMINATE AIR POCKETS & HAND TAMPED. (NO MECHANICAL LOADERS OR TAMPING ' COMPACTORS ARE TO BE ALLOWED) (ASTM C144-11). I T.O. PIER - —56.59 ' IIIII, a IIIII III IIIII IIIII B.O. FOOTING 50.75 REMOVE EXISTING NON -ENGINEERED FILL SOILS. REPLACE W/ STRUCTURAL FILL, REFER TO GEOTECHNICAL REPORT IN SPECIFICATIONS. (GEOTECHNICAL ENGINEER SHALL OBSERVE THE FOOTING / FOUNDATION / CONCRETE SLAB / CONCRETE PAVEMENT / EXTERIOR FLATWORK EXCAVATIONS TO IDENTIFY THAT ALL UNSUITABLE SOILS HAVE BEEN REMOVED AND THAT SUITABLE SOILS HAVE BEEN ENCOUNTERED, BEFORE PROCEEDING WITH FOOTING CONSTRUCTION). PROVIDE NEW STRUCTURAL FILL AS REQUIRED IN THE GEOTECHNICAL REPORT. 1C-1] WALL 73.29 S-1 a.v. rvvi iivv� B.O. F( L — J 52.75 52.75 ROOF MEMBRANE STRIP OVERTOP & FACE OF BLDG. SEAL TO PARAPET ROOF MEMBRANE �_ I TREATED L WOOD SHIMS 'I WRAP CAP W/ MEMBRANE LAG SCREW 32'' O.C. FIBER CEMENT LAP SIDING, BLIND NAIL PLYWOOD SHEATHING, REFER TO STRUCTURAL LIQUID -APPLIED AIR &WATER BARRIER PARAPET DETAIL r„ 3" = 1'_0„ ASPHALT PAVING OVER GRAVEL BASE, REFER TO CIVIL 12'' CLEAN FILL SAND W/ NO MORE THAN 1 /8'' AGGREGATE ABOVE VAT TUBING: GENERAL CONTRACTOR TO PROVIDE & INSTALL CLEAN, FINE, & WASHED FILL SAND, W/ NO MORE THAN MAX. OF 1/8'' AGGREGATE. SAND IS TO BE FILLED 6'' BELOW, 12'' ABOVE & 18'' ON SIDES OF THE PNEUMATIC TUBES. SAND IS TO BE HAND FILLED W/ LIBERAL AMOUNTS OF WATER TO PROMOTE LEVELING, SETTLING & ELIMINATE AIR POCKETS & HAND TAMPED. (NO MECHANICAL LOADERS OR TAMPING COMPACTORS ARE TO BE ALLOWED) (ASTM C144-11). TRENCH DETAIL 3/4" = 1'-0" VAT TUBING, BY DIEBOLD METAL SOFFIT 4 PRE -FINISHED METAL COPING TREATED PLYWOOD T.O. WALL REFER TO ELEVATIONS V, FASTENER W/ NEOPRENE WASHER 12" O.C. ROOF MEMBRANE TO EXTEND UP PARAPET OVER TOP & FACE OF SHEATHING 5/8'' GYP. SHEATHING STRUCTURAL STUDS, REFER TO STRUCTURAL 1' -6" 83/4" 1'-6" 4'- 1 1 /4' MEMBRANE ROOFING OVER TAPERED INSULATION F, T.O. WALL 73.29 DECK BEARING 71.29 SOFFIT 67.29 :E20 2 AE202 STRUCTURAL FILL, REFERTO� GEOTECHNICAL REPORT CONCRETE I I APPROXIMATE ISLAND — — — — � EXISTING GRADE— T.O. PI ER� 55.79 IIII e. IIIII ,IIIII IIIII B.O. FOOTING IIIIIIIIIII 52.751III1I - DRIVE-THRU SECTION 3/16" = 1'-0" DRIVE-THRU EAST ELEVATION 50.75 3/16" = 1'-0" B.O. FOOTING J 50.75 PNEUMATIC TUBES N.I.C. EXTERIOR MATERIAL SCHEDULE MARK MANUF. PRODUCT COLOR / FINISH EXTERIOR PAINT SHERWIN EXTERIOR PAINT SW6990 CAVIAR 251-C2, EP-1 WILLIAMS EGGSHELL MASONRY STN-1 DELTA STONE STONE VENEER IVORY WHITE MECHANICAL SCREEN GEOLAM QUALITA 020C EBONY, END CAPS @ ALL EXPOSED MS 1 ENDS METAL SEE SPEC. 076200 PRE -FINISHED METAL SEE SPEC. MC-1 COPING METAL PANEL MP-1 ALPOLIC METAL PANEL SBR BRONZE SIDING FIBER CEMENT LAP CEDAR TEXTURE FINISH, PAINT S 1 SIDING SW7026 GRIFFIN FIBER CEMENT LAP CEDAR TEXTURE FINISH, PAINT ST-1 SIDING TRIM SW7026 GRIFFIN NOTE: TOP AND BOTTOM ELEVATIONS OF DRIVE-THRU ARE REFERENCING CIVIL ELEVATIONS. CIVIL ELEVATIONS ARE USED ON THIS SHEET ONLY. THE REST OF THE CONSTRUCTION DOCUMENTS REFER TO ARCHITECTURAL ELEVATION OF 100' - 0'' D C L J b.�. IIN�2_ J z — 52.75 — B DRIVE-THRU NORTH ELEVATION 3/16" = 1'-0" 4 DRIVE-THRU WEST ELEVATION 3/16" = 1'-0" -1] VALL_.$, 73.29 A Consultant Z 0 Z 0 U^ J 1V U Q U 1� _ U U 5 z Q L Q m Z a 0 Q Q W CY) J �c) 00 Z z w Z � 0 z Q ° z o UJ -_O —_0 — W o= Issued No. Date Description Revision No. Date Description SAA Project No. 2020-19 Drawing Title DRIVE-THRU ELEVATIONS, SECTIONS, & DETAILS Sheet Number AE202 3