Loading...
Southridge Apartments, Phase 2 CZC,DES (A-2021-0033)CERTIFICATE OF ZONING COMPLIANCE REPORT COMMUNITY DEVELOPMENT DEPARTMENT DATE: 6/11/2021 TO: Kristen McNeill, The Land Group, Inc. FROM: Joe Dodson, Associate Planner 208-884-5533 SUBJECT: A-2021-0033 Southridge Apartments, Phase 2 CZC, DES LOCATION: Project is located near the southwest corner of W. Overland Road and S. Grand Fork Way (Parcel S1223212615). I. PROJECT DESCRIPTION ( �/ WE I *-- �AHO Legend Project Location City Limits Kristen McNeill, the Applicant, requests approval of Certificate of Zoning Compliance (CZC) and Administrative Design Review (DES) for a multi -family development consisting of 236 units and 470 parking spaces on 14.43 acres of land in the R-15 zoning district. Note: The proposed project has multiple previous approvals (see record for specific file numbers) and this application is for phase 2 only. Staff has confirmed that some of the labeling on the site plan is not entirely accurate. Buildings 31- 37 noted on the site plan are 8-unit apartments and not 12-unit as depicted on the site plan. This change keeps the total number of apartment units across both phases at 476 units; the maximum number of units allowed per the approved Conditional Use Permit (H-2017-0077). II. DECISION The applicant's request for Certificate of Zoning Compliance and Administrative Design Review is approved with the conditions listed in this report. The previously approved elevations are included as an exhibit in this report to ensure continued compliance with the approved plans. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Page 1 Site Specific Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property (including monument signs), the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-313-14A. 4. The site plan prepared by The Land Group, dated May 20, 2021, labeled CZC Site Plans, is approved by the City of Meridian Planning Division as shown in Exhibit A. 5. The landscape plans prepared by The Land Group, dated May 21, 2021, CZC Landscape Plans, are approved by the City of Meridian Planning Division as shown in Exhibit B. 6. The elevations prepared by TAO, dated August 18, 2017, labeled Design Review, are approved by the City of Meridian Planning Division as shown in Exhibit C (The submitted elevations are the same as those approved with phase 1 and still comply with the ASM while matching what is currently under construction). 7. The approved site plan, landscape plan, and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 8. The required landscaping along W. Overland Road shall be completed or part of a performance surety agreement with the City prior to receiving any certificate of occupancy for this phase of development. 9. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 10. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 11. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 12. The Applicant shall comply with all previous ACHD conditions of approval. 13. Prior to issuance of Certificate of Occupancy on any building, the Applicant shall provide proof of the required maintenance agreement to the Planning Division in accord with UDC 11-4-3-27 — all multifamily developments shall record legally binding documents that state the maintenance and ownership responsibilities for the management of the development, including, but not limited to, structures, parking, common areas, and other development features. 14. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887-2211. General Conditions of Approval Page 2 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-313-6 and to install and maintain all landscaping as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site: RZ-11-002; PBA-14-012; A-2017-0267; H-2017-0077 (CUP); H-2020-0109 (MDA, Inst. #2021-018471). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. 7. The applicant has a continuing obligation to comply with the outdoor service and equipment area provisions as set forth in UDC 11-3A-12. 8. The Applicant shall have an ongoing obligation to comply with the Multi -Family specific use standards, asset forth in UDC 11-4-3-27. III. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before June 26, 2021, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. IV. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until June 12, 2022. Page 3 V. EXHIBITS A. Architectural Site Plan (dated: 5/20/2021) P.,khq Stalks: Setbacks: PIWILY Butner: SQU-IDGE FARM. L C 71Q Engineer, Landscape A[Chlteet, Planner. . ....... . -PHASE 2 ASE I --- xz F 21 09A J 28 2, a L AREA 0 j 4z L Phase I Area 25 Shown for 3 Building Data, ARE) CZC Site Plans -Project Overview 7;� Page 4 116 -m AMTHE Le LAND —GROUP W .GROUP i� x - rx u31 4 ii! / .wem 0ruurs � N ij �C� L 1 pp ii r! y -� J�-i---x o- l- =�i' A ^ o oo29�nrs E cc _ 6 32 7 25 CZC Site Plans -Area A = CZC-2 P 9 y AMTHE NLAND GROUP 21 33 27 21 \g � r/, I!� O 11, ,✓ N CD ten,' 4. n34 Q W v_ v u35 1 _ r 7 asma39xu b CZC Site Plans -Area B = CZC_3 Page 5 L4 zwon36s+xRa[ 37 CZC Site Plans -Area C ul c Page 6 TH E L(GROUP IL 'a 41W, m Q =THE WIPLAV GROUP 04 CS CL a) a) C" m M m CZC-5 B. Landscape Plans (date: 5/21/2021) Page 7 %A CZC Landsc w .l L d: THE LAND GROUP 30 cm BUILDING TYPE C 4 29 BUIMINGTYPE2 1p Q) J� co to Page 8 T—w CZC-L2 X-11A L—d: THE LAND WROUP 12 CZC-L3 Plans -Area D LI L THE ANUOP VORO - .4777 41 BUILDIMG TYPE 1 C%j to CL m M.thndgeAparbncnts phase,In CM, 42 DU ILDI NG TVPE 2 vqw, CZC-L4 Page 9 CZC-L5 BUILDING TYPE G r BUILDING TYPE 1 UUILUING TVPL 2 BUILDING -TYPE 3 LAND .GROUP Land3caps Note: N err co to t Material Legend: ,.., G. ........ R LL _== w d Sheet Nate.: OJ cm 6 a a t L o s •.e.,n,t�.,�w,,,_r, N y s z Pmjeer Calculations: CZC Landscape Plans -Building Landscapes R,=•• CZC-L7 Page 10 C. Building Elevations (date: 8/18/2017) -_ T 71 r I I T;I I I III III _ «/ I � IJI I� 111� lai � .- rl �r - L,€�o vrac'7 BUILOIXG TYPE 1A FRONT ELEVATION { r' Ts - BUILDING TYPE 1A 2 LEF1 SIDE ELEVATION J BUILDING TYPE 1A RIGHT SIDE ELEVATION +t�mr _ r 7 Z] � m IT m BUILDING TYPE I REAR ELEVBTIXXFF- �a� J {J bn..a - BUILBIN6 ttPE 1�B FRONT ELEVATIONcc O BUILOINfi TYPE 1B RUILOIX'G TYPE IS LEFT GIUE ELEVATION RIGNT DIRE ELEVATIUX BUILDING TYPE 1O READ ELEVATION KEYNOTES Page 11 tJ KE TA� TNEdiCNUELTiUFFI(E€ _ ATM=^^-"�•�m^-m� SOUTHNIOGE o - APARTMENTS GENERAL NOTES DESIGN REVIEW EXTERIOR FINISH SCHEDULE� AA5A 31111➢IN6TVP'�L NOTES ERTERINR PINION SCNENNLE TAB IHEARIROFR$DFFIFE� SOUTNRIOGE APARTMENTS TEv xliLe r.o. a nrevioiAH. 1- AA5.1 uuiEiivc 1rTL i� 'INNS Ci III, III O BUILDING TYPE 2RA 1 FRONTELEVATIOX s,;•�—:, .-L .fie .-.{7 r ;m� 19�111 TT !n+ pp�,I -c� BUILDING TYPE 2A BUDDING TYPE,u 2 LEFT SIDE ELEVATION 9 RIGHT SIDE ELEVATION so." ___________ NYili <3r4� amp- +per BUILDING TYPE 29 LEFT SIDE ELEVATION BUILDING TYPE 2A R EAR ELEVATION IIIll �IIIRI�III OI�EII!H I II III III I�. � III III BUILDING TYPE 2B I.FRONT ELEVATION BUILDING TYPE 2B R EAR ELEVATION 4z-,_- m- 1 BUILDI NG TYPE 2B RIGHT SINE ELEVATION Page 12 KEYNOTES CT. nm— IAO THEAKFELTSRFFICU •^^' m,x SOUTHRIOGE - APARTMENTS TEN MILE RD,L GENERAL NRTES DESIGN REVIEW ` ENiERIOR FINISH SCHEDULE Q� AA5.2 3111LVING 11PE 7ti W ... KEYNOTES O, . �. �m�.. ...........^.., m. IA� THEAKFECISGFFICEP TM=^^-^•�m^-m SOUTHRIOGE - - _ APARTMENTS TEN MALE RD& GENERAL NRTES ulfRIJIAl..-L DESIGN REVIEW EYTERIOR FINISH ` SCHEDULE Q� AA5.3 BVIL�IN6N�f 2R [LLVAP'JN,�. wQA . r"i�mv ww.i. um.n •.. i,""..-x.. sd"Vi I [Ell I-: '111 ,l I-, l�J", I 7v., BUILDING TYPE 3A FRONT ELEVATION �ilfliiilll-illii oil 11,11 9111, mo BUILDING TYPE 3A 2 LEFT SIDE ELEVATION BUILDING TYPE 3A & R 1 0 H T SIDE ELEVATION BUILDING TYPE 3A 4 HEAR ELEVATION I III II rn F] III I I= III II iLLL- tell � �W� I -[1116,11-'' BUILDING TYPE 3B F HART ELEVATION �311IYIIIIIIIIIIm� BUILDING TYPE 30 BUILDING TYPE 311 LEFT SIDE ELEVATION RIGHTSIDE ELEVATION W- h lik LH L3 -I] m [I] Lll.:�: IEEE: TIE BUILDING TYPE 311 4, G EAR ELEVATION 13 KEYN07ES (i) TAO 7T�lzl� 2 — THEAKNUMIFFICU SOUTHRIDGE APARTMENTS TEN IAILE FEC & -HIN— GENERAL NOTES EOIN10.1DIHO DESIGN REVIEW EXTERIOR FINISH SCHEDULE 7— �w— AA5.4 KEYN07ES TA %T SOUTHRIDGE APARTMENTS TEN IAILE FEC & GENERAL NOTES NERINIM. IDAHO DESIGN REVIEW EXTERIOR FINISH SCHEDULE 7 7— AA5.5 BVIE m BUILDING TYPE 4A LEFT SIDE ELEVATION I- -----------II II� R BUILDING TYPE 4A FRONT ELEVATION BUILDING TYPE 4A 4 REAR ELEVATION BUILDING TYPE 4B F BUNT ELEVATION 4i� lw BUILDING TYPE 4A 31RIGHT n16 H T SIDE ELEVATION BUILDING TYPE 48 LEFT SIDE ELEVATION BUILDING TYPE 4B RIGHT SIDE ELEYk7IDN + Lit ----------- (D LL BUILDING TYPE 4B 4 REAR ELEVATION Page 14 KEYNOTES (i) TAO 7T�lzl�2 THEAKFEMOFFICU SOUTHRIDGE APARTMENTS TEN IAILE FEC & GENERAL N07ES ENNOX- DESIGN REVIEW EXTERIOR FINISH SCHEDULE MFY. 7 7— AA5.6 KEYNOTES (I) TAO OZ7 ol THEAKFEMOFFICU SOLITHRIDGE APARTMENTS GENERAL N07ES DESIGN REVIEW EXTERIOR FINISH SCHEOULE E-7,1 771-1 AA5.7 BVIELE-01 1111111 IIII II —1111�111 NEU ri a IIIIII IIHII IMII6_I —H111'I VIE IN cm n ------------------ HORTR ELEVATIDN R.xr 4oE 7,7 iL ��a' ': ±•�'yA WESTELEYATIDH elan C SOUTH ELEVATION LEFT ROE Page 15 TA0 THE ARCHRELTSHFFICU SOUTHRIDGE APARTMENTS TEN ImLE Ro, a a HUN ' i.EEINO.IDAHO DESIGN REVIEW pQy e� AA5.8 BULDI 1 sa ILN Sl HEYMDTES (I, m. �..,...„.�,.�..„.:,,,._^. TAB ..... . ,.y THEAKFEMOFFICU GENERAL HDTES SOUTRRIDGE APARTMENTS TEN IALE RN, L HEaioiaH ioaHo DESIGN REVIEW AC5.0 DESIGN NP'EITP-T suurvc :Lenses J o { KEYN07ES (I) 0 Cs� is C, f, c:`C O _,`G `G) SOUTH FRONT ELEVATION Ll Will EAST SIDE ELEVATION GENERAL N07ES IlEj NIT Lw 3._.XDRTH. REAR ELEVATION EXTERIOR FINISH SCHEDULE u r � r WEST SIDE ELEVATION Page 16 TA0 THEAKFELTSOFFICU SOUTRRIOGE APARTMENTS TEN ImLE ND, a -HINNNu. i.EEDM 1SlES DESIGN REVIEW AP5.0 PoSLHOUSE fLNAlINN6