Sadie Creek Commons Multi-Tenant Building with Drive-Through CZC DES A-2021-0065CERTIFICATE OF ZONING
COMPLIANCE REPORT
COMMUNITY DEVELOPMENT DEPARTMENT
DATE: 6/9/2021
TO: John Day, SU Architecture
FROM: Sonya Allen, Associate Planner
208-884-5533
SUBJECT: Sadie Creek Commons Multi -Tenant
Building — CZC, DES
A-2021-0065
LOCATION: 3030 N. Cajun Ln. (Parcel
#S1105110120)
I. PROJECT DESCRIPTION
( �/ WE IDIAN*--
.►AHO
Certificate of Zoning Compliance (CZC) and administrative Design Review (DES) for a 7,847 square
foot multi -tenant shell and core building with a drive -through on 1.16-acres of land in the C-G zoning
district.
II. DECISION
The applicant's request for Certificate of Zoning Compliance and Administrative Design Review is
approved with the conditions listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if
you need a building permit and/or inspection. If you do need a building permit, you must complete
that process before you commence the use or construction. Please contact Building Services for
additional details about building permits and inspections.
Site Specific Conditions of Approval
1. Prior to Certificate of Occupancy, the applicant shall submit a public access easement for
the multi -use pathway(s) to the Park's Department for approval by City Council and
subsequent recordation.
2. Obtain approval from Republic Services for the location of the trash enclosure prior to
construction; if changes are required, re -submit revised plans to the Planning Division.
3. The driveway accesses from the north via E. Ustick Rd. and from the west via E. Picard
Ln./N. Cajun Ln. shall be constructed with development of this site or with the development
of the Villasport site to the west, whichever occurs first.
Page 1
4. All of the frontage improvements (i.e. street buffers, sidewalks, pedestrian lighting, etc.) on
this site along E. Ustick Rd. and N. Eagle Rd./SH-55 shall be installed with the first phase of
development as set forth in the Development Agreement (Villasport — Inst. #2019-060877). If
the Villasport site to the west develops prior to this site, these improvements will be required with
that development.
5. Include shrubs within the street buffer along E. Ustick Rd. as set forth in UDC 11-313-7C.3a.
6. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
7. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3
Article D and receive approval for such signs.
8. The applicant shall complete all improvements related to public life, safety, and health as set forth
in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with
UDC 11-5C-3C.
9. Upon installation of the landscaping and prior to inspection by Planning Division staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-313-14A.
10. The site plan prepared by The Land Group on June 7, 2021, labeled Sheets C0.50, C1.00, C1.01
and C 1.50 is approved by the City of Meridian Planning Division as shown in Exhibit A.
11. The landscape plan prepared by The Land Group on June 7, 2021, labeled Sheets L0.50, L1.00,
L1.01 and L1.50, is approved by the City of Meridian Planning Division as shown in Exhibit B.
12. The elevations prepared by SU Architecture, labeled A3.11 and A3.12, are approved by the City
of Meridian Planning Division as shown in Exhibit C.
13. The approved site plan, landscape plan and/or elevations may not be altered without prior written
approval of the City of Meridian Planning Division.
14. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
15. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant
shall submit a new site plan to the City of Meridian Planning Division for approval prior to
issuance of the building permit.
16. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building Official
has issued a Certificate of Occupancy.
17. If the subject property is part of a final plat that has not yet recorded, the applicant shall be
responsible for all plat improvements prior to release of Certificate of Occupancy for the first
structure within such plat.
18. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a
Warranty Surety in the amount of 20% of the total construction cost for all completed public
sewer and water infrastructure for a duration of two years. This surety amount will be verified by
a line item final cost invoicing provided by the owner to the City. The surety can be posted in the
form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to
Certificate of Occupancy. Applicant must file an application for surety, which can be found on
the Community Development Department website. Please contact Land Development Services
for more information at 208-887-2211.
19. 100-watt and 250-watt, high-pressure sodium street lights shall be required on all public
roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights
shall be installed at developer's expense. Final design shall be submitted as part of the
development plan set for approval. Applicant shall also include the location of any existing street
lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs,
and at a spacing that does not exceed that outlined in the Standards. The contractor's work and
Page 2
materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to
the ISPWC.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets
the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth
in UDC 11-313-5, UDC 11-313-13 and UDC 11-3B-14.
2. The subject property adjoins a state highway; access to the state facility is restricted as set forth in
UDC 11-311413.
3. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in
UDC 11-3A-14.
4. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (H-2018;0121 Villasport MDA Inst. #2019-060877; H-2021-
0006; cross access easement Inst. #2020-075458).
5. The issuance of this CZC does not release the applicant from any previous requirements of the
other permits issued for the site.
6. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the
area.
7. The applicant shall have an ongoing obligation to maintain all pathways.
8. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set
forth in UDC 11-3A-11.
9. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping
and constructed features within the clear vision triangle consistent with the standards in UDC I I -
3A-3.
10. The applicant and/or assigns shall have the continuing obligation to meet the specific use
standards for the proposed use as set forth in UDC 11-4-3-11 Drive -Through Establishment and
11-4-3-49 Restaurant.
III. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director. All
requests for review shall be filed in writing with the Planning Division on or before June 24, 2021,
within fifteen (15) days after the written decision is issued, and contain the information listed in UDC
11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a final
decision on a land use application. You have the right to request a regulatory taking analysis under
Idaho Code 67-8003.
IV. EXPIRATION
The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not
commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until June
9, 2022.
Page 3
V. EXHIBITS
A. Site Plan (date: 6/7/2021)
. .. rniaiEc�aaea,
sff sui�r ci.ol
�T
• m tip - ® � ® m e a
Project Overview
Page 4
Prpeu imor.mon: L@THE
LARD
GROUP
Pro'ncl tal ularionr:
m c..7
Co-.m. s... ems..
E
E
o
CD
w
W
W V
C. v
it Co
CL 6a
CLfm�r
tea....
C0.50
Medrinl leaentl ��
i-LAND
Ill URUUP
u
J
J
SYe Plan Ymes�p�e��'�
Ytlnnalic lletlegrouM lnigafi.e Moles �:
.Y.
i
a la
C1.00
tiaaaalknanna THE
' - ED �LISROUP
UND
ler.ote:
w
J
J
R04E°
CIf�
APP
LAND
GHE
ROUP
w
O
E
E
O
V
Y.
IL �
d
w °' g
��, ShN bllaN �e1 Bie Rack d y ' �
C1.5D
Page 5
B. Landscape Plan (date: 6/7/2021)
CZC-Landscape Project Ovad r
i
CZC-Landscape Plan
Page 6
P�gect lnbmafi.c LJTHE
LAND
6ROUP
C]
LAP,."�DWNS
�-
o� sa
snePt nm�:
�annsoaue xme,,,.sm,...s..
THE
LAND
_��•_� -�
GROUP
U
C
lantls�.i �-Lc: :,i
F—I
O
O
Y
Cu
4-1
L1.ao
........ ... ..... .....
Ez
Page 7
L THE
LAND
IIRQUP
El El
W—bl U.6.W..d knqgm Nd—
=M., rl=
CUNIA}SONS
L1.01
I THE
LAND
ORQUP
—7r-
Om r
PROVED d
C. Building Elevations
a
t
EAST ELEVATION (� w z
Op
a �
m
a
-Vw
NORTH ELEYAIION /�
e
APPROVER nq EiEvuioxs
I
-.
I
AWFARM
J11
O
-----7�1�------�nl� -
........... R-10 MEN
Page 8
�z
m=
00
o�
�m
A
B� W
a$i
e�evwA3.12J
PERSPECTIVE
Wi
u
a
nn
Yii®INl71iN!•�
PERSPECTIVE
� p/_ PERSPKIIYES
Allj
Page 9