Loading...
Z - Landscape Plan Revised THE IIII � LAN D PLANT SCHEDULE �_� CLASS II TREES BOTANICAL/COMMON NAME SIZE CONTAINER - GROUP LT LIRIODENDRON TULIPIFERA/TULIP TREE 2"CAL. B&B NOT APPROVED CLASS III TREES BOTANICAL/COMMON NAME SIZE CONTAINER OR QUERCUS RUBRA/RED OAK 2"CAL. B&B FOR CONSTRUCTION EVERGREEN TREES BOTANICAL/COMMON NAME SIZE CONTAINER SS PICEA OMORIKA/SERBIAN SPRUCE 6' HT. B&B Legend: + + + + NEW TURF SOD ++++++++ NON MOWN RED FESCUE + + + + + + + + 0 0 & OPEN STYLE METAL FENCE & TAN VINYL FENCE, MATCH EXISTING 13 t , I CLOSED VISION FENCING. -_ Keynotes: 2 , j 2 \\\� 1. BEGIN FENCING, SEE LEGEND FOR FENCING TYPE. ICC) \\��\\� \\ 2. END FENCING, SEE LEGEND FOR FENCING TYPE. \ /I r // ��\���`\\� ���� `� Project Calculations - --► I r \\\\� \\� \\ \ \ �� ��\� A. RESIDENTIAL SUBDIVISION TREES: 9 TREES (1 PER LOT. NOTE: NO TREES PLANTED WITHIN 10'OF ANY STORM DRAINAGE STRUCTURES) S. GRAND FORK WAY: LF 555,TREES PROVIDED-9 B. ACREAGE DEDICATED FOR COMMON OPEN SPACE: 1.03 ACRES. (45,182 SQ FT) C. COMMON OPEN SPACE PERCENTAGE OF THE GROSS LAND AREA OF DEVELOPMENT: 13.1% (MINIMUM 10%) D. NUMBER OF TREES PROVIDED ON COMMON OPEN SPACE: 7 PROVIDED O (1 PER 5,376 SQ. FT.) (MINIMUM 1 PER 8,000 SQ.FT.) L — — — — I /// // \�\ baU�,h ^ E. MITIGATION FOR REMOVAL OF EXISTING TREES: N/A Landscape Notes: 1. NO CANALS, CREEKS, DRAINS, PONDS,WETLANDS, FLOODPLAINS, HIGH GROUNDWATER AREAS, OR ROCK /l/ /// OUTCROPPINGS ARE EXISTING ON THIS SITE. Q 2. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT 4 \ � / �� ���_ \ THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. \���� 3. ALL EXISTING TREES OUTSIDE OF WORK LIMITS WILL BE RETAINED AND PROTECTED. 4. NEW TREE PLANTING, SEE DETAILS SHEET L150. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, LE..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. 5. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE 1 II I II I r .• / ; �� / / ( ` — ` / I \ r \\ \� SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. \ I I — '•'• ` / `'•'•` I — , `/ I r — — / \, \���\ 6. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3"OF SMALL(1"MINUS) BARK CHIPS. W 7. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION Cz IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. J 8. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. 2 9. IN ALL PLANTER BED AND LAWN AREAS,THE TOP 6 INCHES OF TOPSOIL WILL BE AMENDED AT A RATIO OF 3 \ \\\\\ CUBIC YARDS OF COMPOST/ORGANIC MATTER PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A + +\ \�\\\ MINIMUM OF 6 INCHES INTO TOPSOIL.ALL TREE PITS SHALL BE A MIX OF SEVEN PARTS TOPSOIL(AS SPECIFIED ;:;'� +� \ \\\\ IN THESE NOTES)AND THREE PARTS COMPOST/ORGANIC MATTER, BY VOLUME. -_ _- _ I� III - - - - : • ., J + \\ \ y — — ___— — — — — � I .•� � :;: ,-,, ` J f � ,�\ \\ \ 10. FERTILIZE ALL TREES AND SHRUBS WITH AGRIFORM PLANTING TABLETS. QUANTITY PER MANUFACTURERS _ — _� ✓ III III — — — — — — 1 i \•. : 'k.��.;\ ' .• .�,. + + +�\ \ RECOMMENDATIONS. ____ -- — — — _ _ - _ `�� I I I I .� LT( ) I -- — I ��:�;: ' .•. : y . .;•SS(3 �'�' +� \\\\ 11. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18"OF TOPSOIL, SOD AREAS A MINIMUM OF 12"OF TOPSOIL. Q ttfd„g� = ;_ \ I I/I 1'1' l I I I / �"�;;�;• �;•'•;•'.'.'.;:'• .;�;.' '�,•,•, \ \\ \mon SPREAD COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3 BELOW SURFACE OF O CD I I I •�:• �' ' '�•:•�'•. �•'•' '•'� •\\ \\ �\ WALKS AND CURBS IN PLANTING BED AREAS,AND 1/2"IN LAWN AREAS. oC Y / .�;.'.• .:`. . . . .;.� . .;:;:' •: .•.,:�, , \ S 12. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE.VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE y — _ — — — — —_� ��\ I I •.�. I III �•.•. \ \s �;.;. . :• :.%.: : •.�;�'o� \ TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY.TOPSOIL SHALL BE A LOOSE, FRIABLE, � — — � — � �� ��� �� � ��f� J .f• �� �• I I I I I, / / I / / I �`''' . . . . . . . . . .�' .?6�, .�,;A . . \\ \\ \ \ SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS,WEED SEEDS, ROCKS, GRASS OR rr` 11 I / • o . \\ \\ OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM _ I I \ I / f �;: .;';. •:�i•:•. :•.• \\ \ \ Revisions _ •. `�.,., \\ \\ \\\ STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER:A) PROVIDE APPROVED IMPORTED TOPSOIL,OR B.) �� ��-� I 1 1 I / __ / \ ;;: '•�' •`'•'•�•�'• \\\ \�\\ \ IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH 1. ACHD COMMENT 10.26.2020 1 I I I — _ I '�•. \ IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, �r I 1 1 _ — __— — / \ \ '� •:�•' •.••• '• \\\\ \ \ 2. CITY COMMENT 4.12.2021 STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. ,� � -. , , � °� all - _��_-_==___-_� \_�.�I \ �� �•��•• •• •���' \\\ �� — I I �j __— — __ — — ? �;� '•'j• ;�\ \\ \ 13. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, 2 w I 6"P P$ '/� �i �\ 645 �� :�•. •:� '�:;�,'� \\\\\\\ FRIABLE, NATURAL LOAM,SURFACE SOIL, REASONABLY FREE OF SUBSOIL,CLAY LUMPS, BRUSH,WEEDS AND �I II I I ����j'/ \� \?6S� \:�';.:�:�:..•�: •\• \ \\\ \\\ OTHER LITTER,AND FREE OF ROOTS, STUMPS,STONES LARGER THAN 2 INCHES IN ANY DIMENSION,AND _j��/�/ — � —2 ����\� �� \ � +� '�:•. :•:�'•.• .�,.�•\ \\�\ \ \ OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. 1 I L •:� :••• •�.,�. \ \\\\�\\ 14. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT `I � I u — —�j'/ � ��\��\ ,�+�++ ;,�:•�: \\\\ \ � \ FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY,WELL-DRAINED SITES WHERE TOPSOIL a ' ,h •'.... • .•. . \\ \ \ OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. R�� \���� + +�;:;:;:;:C;. :j .•�:•'•'�'•�•. \\\ \\� 15. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE ��\ �� �+\• ' :•.•�' '�' \\\\\\ \ \ OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 16. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH ENSURES I \ �;*� • :•:•�:• \\\ \ COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. ti• .��• '� \� \� AND Landscape Plan Notes: 60 + '•' '•' '•'�`�`• \\ \ \ 1. TREES SHALL NOT BE PLANTED WITHIN THE 10'CLEAR ZONE OF ALL ACHD STORM DRAIN PIPES, STRUCTURES, OR . . . . ...•.•\\\\\\\ FACILITIES. \�\ OF p �/ D, q �i \ \___� / �� �*� �• �� \\\ \\ \ 2. IF ACHD SEEPAGE BEDS ARE LOCATED WITHIN A COMMON LOT WHERE IRRIGATION LINES WILL BE INSTALLED, SEEPAGE BEDS MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND \\ �;� INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. = r" � LA-202 Z4)VDSCAY� 1104/12/2021 � Project Na.: 117035 Date of Issuance: 05-27-2020 � Project Milestone: Construction Set Landscape Plans - a Landscape Plan 50 100, Landscape Plan J_ HORIZONTAL SCALE: 1" = 50' �=o wE� L 1 .0 0 ��o