Loading...
ACHD Transmittal (A-2021-0016)Applicant name:MANDIE BROZO, CSHQA Phone: Applicant address:200 BROAD STREET, BOISE, ID 83702 Email:mandie.brozo@cshqa.com Owner name: DAVE MCKINNEY, HIGH DESERT DEVELOPMENT LINDER VILLAGE, LLC Phone:Fax: Owner address:2537 W STATE ST. STE 110, BOISE, ID 83702 Email:LDM@CTCWEB.net Administrative Applicant Information Type of Review Requested File number:A-2021-0016 Assigned Planner:Stacy Hersh Related Files: Subject Property Information Location/street address:1201 W CHINDEN BLVD Assessor's parcel number(s):S0425212500 Township, range, section: Agent name (e.g. architect, engineer, developer, representative):MANDIE BROZO Firm name:CSHQA Phone:Fax: Address:200 BROAD STREET Email:mandie.brozo@cshqa.com Contact name:Phone:Fax: Contact address:Email: Project/Application Name:Orchard Park BLDG 3 - DES, CZC Description of Work:New 5,500 sf multi tenant commercial building in Orchard Park Development. Narrative included with submittal. Project Description Planning Division ADMINISTRATIVE APPLICATION 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 1 APPLICATION TYPES Alternative Compliance - ALT:UNCHECKED Certificate of Zoning Compliance - CZC:CHECKED Does project have prior approval?:No Does your project contain new construction and/or modifications to an existing building or the site?: Yes Design Review - DES:CHECKED Private Street - PS:UNCHECKED Vacation - VAC:UNCHECKED ADDRESS VERIFICATION Address Verification Permit Number:LDAV-2021-0019 TYPE OF USE PROPOSED Residential:UNCHECKED Office:UNCHECKED Commercial:CHECKED Employment:UNCHECKED Industrial:UNCHECKED Single-Family Detached:UNCHECKED Single-Family Attached:UNCHECKED Townhouse:UNCHECKED Duplex:UNCHECKED Multi-Family:UNCHECKED Vertically Integrated:UNCHECKED PUBLIC WORKS INFRASTRUCTURE Does this project require the extension of public infrastructure?:No I agree to upload required checklist items for review:UNCHECKED I acknowledge deferral of the required checklist items, may require additional review time: UNCHECKED I agree to upload required checklist items with the building application:UNCHECKED PROPERTY INFORMATION General Location:SEC Linder Rd. and Chinden BLVD. Current Land Use:Vacant Total Acreage:49.58 Prior Approvals (File Numbers):0 ZONING DISTRICT(S) R-2:UNCHECKED R-4:UNCHECKED R-8:UNCHECKED R-15:UNCHECKED R-40:UNCHECKED Application Information 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 3 C-N:UNCHECKED C-C:CHECKED C-G:UNCHECKED L-O:UNCHECKED M-E:UNCHECKED H-E:UNCHECKED I-L:UNCHECKED I-H:UNCHECKED O-T:UNCHECKED TN-C:UNCHECKED TN-R:UNCHECKED County:UNCHECKED PROJECT INFORMATION Site Plan Date (MM/DD/YYYY):1/18/2021 Landscape Plan Date (MM/DD/YYYY):1/15/2021 Elevations Date (MM/DD/YYYY):1/18/2021 Percentage of Site Devoted to Building:14.8 Percentage of Site Devoted to Landscaping:22 Percentage of Site Devoted to Paving:63.2 Who will own and Maintain the Pressurized Irrigation System in this Development:Owner Irrigation District:Settlers North Slough Primary Irrigation Source:Surface Water Square Footage of Landscaped Areas to be Irrigated by City Water Connection:8,159 Proposed Building Height:20'-6" Existing Floor Area (If Applicable):0 Gross Floor Area Proposed:5,500 Number of Standard Parking Spaces Provided:40 Number of Compact Parking Spaces Provided:0 Number of Employees:0 Number of Residential Units:0 Minimum Square Footage of Living Area (Excluding Garage):0 Gross Density:0 In Reclaimed Water Buffer:Yes QUALIFYING OPEN SPACE Open Grassy Area (min. 50' x 100'):UNCHECKED Community Garden:UNCHECKED Ponds or Water Features:UNCHECKED Plaza:UNCHECKED Additions to Public Park:UNCHECKED Collector Street Buffer:UNCHECKED Arterial Street Buffer:UNCHECKED 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 5 8' or 6' Wide Parkways:UNCHECKED 10' Parkway Along Arterials:UNCHECKED Stormwater Detention Facility:UNCHECKED QUALIFYING SITE AMENITIES Clubhouse:UNCHECKED Fitness Facilities:UNCHECKED Enclosed Bike Storage:UNCHECKED Public Art:UNCHECKED Picnic Area:UNCHECKED Additional 5% Open Space:UNCHECKED Communication Infrastructure:UNCHECKED Dog Owner Facilities:UNCHECKED Neighborhood Business Center:UNCHECKED Swimming Pool:UNCHECKED Children's Play Structure:UNCHECKED Sports Courts:UNCHECKED Pedestrian or Bicycle Circulation System:UNCHECKED Transit Stop:UNCHECKED Park and Ride Lot:UNCHECKED Walking Trails:UNCHECKED APPLICATION DISCLAIMER I have read and accept the above terms:CHECKED Your signature:Mandie Brozo 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 7 January 20, 2020 City of Meridian Planning Department Meridian City Hall, Suite 210 33 East Broadway Avenue Meridian, Idaho 83642 Re: Design Review Application Project – Orchard Park Building 3 1201 West Chinden Boulevard Meridian, Idaho Project No. 20231.000 Dear City Planner: The following is a project narrative for the construction of a one-story multi-tenant shell and associated site work, located at in the new Orchard Park development at 1201 West Chinden Boulevard, Meridian, Idaho. The construction of the project will take place on parcel: S0425212500, which is currently zoned (C-C) Community Business District, which permits this type of commercial use. The building size is approximately 5,500 square feet with three (3) tenants. The building shell is planned for construction; separate tenant improvements will be submitted for review at a future time. The new site work will tie into the existing adjacent site construction that was completed under a separate permit, this work includes adjacent curbs, gutters, and main drive isles construction. The related site improvements associated to the building including new sidewalk, parking, drive throughs and landscaping. The building’s exterior has been designed to meet current city design standards. The materials that give the building its character consists of stone, EIFS, and metal panels. These materials ensure that the look of the building will remain intact over time. Black anodized metal on the storefronts, canopies, and trim provides contrast next to other building materials. The front façade of the building consists of the three (3) main entries into tenant spaces. Entry tower elements balance the linear façade of the building. Differing parapet heights and canopies serves to bring the scale of the building to the pedestrian level. The building massing is broken up by the rhythm of alternating metal siding, stone and EFIS with the portions of the building protruding vertically and horizontally to give hierarchy to the entry element. This same design language is used throughout the other elevations to provide a consistent massing on all façades. The design intent with mechanical system is to have it serve the building without being obtrusive. Mechanical equipment and units will be placed on the rooftop with parapets to screen, preventing sight of the units from the ground. City Planner Page 2 January 20, 2021 One tenant monument sign is proposed on the street side of the building as well as above each tenant entry for clear visibility from all directions. Strategically place landscaping will be used to help screen the trash enclosure and exterior patios from vehicular circulation this will create a welcoming experience for the visitor. The required number of parking stalls is 11, there are 11 parking stalls proposed on BLDG 3 site, and an additional 28 stalls are proposed with a cross access parking agreement for multi-tenant use. The surrounding area of the buildings and parking lot proposed landscaping is designed to create an inviting area for visitors; similarly, the trash enclosure area will be screened. LED lighting is placed throughout the site to ensure visibility for pedestrians. Two (2) of the tenant spaces include a drive thru components. Tenant A’s drive through would start on the south side of the building, turn north and then merge to the west drive though lane where pick up window would be clearly marked for vehicular circulation. Tenant C’s drive through would start on the north drive through lane, adjacent to the building, then turn north to the drive through window. Then vehicles will exit to the east drive through lane. Additional “STOP”, “ENTER” and “EXIT” directional signage is proposed to help guide vehicles safely through the site. Thank you for reviewing our application for Design Review and Certificate of Zoning Compliance approval. Please contact us if you have any questions or require further information. Sincerely, CSHQA, Inc. Mandie Brozo MB:pk ENTERDO NOTENTER5,500 S.F.BLDG 3 PATIO ENTERSTOP S T O PENTER EXIT MO'BETTAH'S2626 SF VACANT1610 SF JAMBA JUICE ORTROPICAL SMOOTHIE 1656 SF FSRISERDMG REAL ESTATE PARTNERS, LLC SITE PLAN 18 JANUARY, 2021 pg. SP10 ORCHARD PARK BUILDING 3 20231 Scale: 1" = 20'-0" DESIGN REVIEW CONTACT INFORMATIONOWNER: MR. DAVID MCKINNEY DMG REAL ESTATE PARTNERS2537 W. STATE ST., STE 110 BOISE, ID 83702 ARCHITECT: JAMES MARSH CSHQA200 BROAD ST. BOISE, ID 83702P: (208)429-4049 SITE PLAN INFORMATION PROJECT ADDRESS: 1201 W. CHINDEN BLVD. MERIDIAN, ID 83646 PARCEL: S0425212500 ZONE CODE: C-C COMMUNITY BUSINESS DISTRICT TOTAL ACRES: 49.580 SUBDIVISION: LINDER VILLAGE TOWNSHIP/RANGE/SECTION: 4N1W25 DIMENSIONAL STANDARDS IN THE COMMERCIAL DISTRICTS FROM TABLE 11-2B-3 OF THE MERIDIAN CITY CODE FRONT SETBACK (IN FEET)0 REAR SETBACK (IN FEET)0 INTERIOR SIDE SETBACK (IN FEET) 0 STREET LANDSCAPE BUFFER (IN FEET) LOCAL 10' COLLECTOR (LINDER)35' ARTERIAL (CHINDEN)35' LANDSCAPE BUFFER TO RESIDENTIAL 20' MAXIMUM BUILDING HEIGHT (IN FEET) 50' SITE AREA CALCULATIONS: SITE AREA: 37,135 SF BUILDING AREA: 5,500 SF LANDSCAPE AREA: 8,159 SF PERCENTAGE OF SITE DEVOTED TO BUILDING:14.8% PERCENTAGE OF SITE DEVOTED TO LANDSCAPING: 22% PERCENTAGE OF SITE DEVOTED TO PAVING:63.2% PARKING REQUIREMENTS -SECTION 11-3C-6-B.1: ONE PARKING SPACE REQUIRED FOR EVERY 500 SQ. FT. OF GROSS FLOOR AREA 5,500 SF/ 500 = 11 = 11 PARKING STALLS REQUIRED = 40 PARKING STALLS PROVIDED 11 PARKING STALLS INCLUDED ON PROJECT PROPERTY, ADDITIONAL 29 STALLS WILL BE CONSTRUCTED WITH BUILDING 3. PARKING PART OF OVERALL DEVELOPMENT CROSS ACCESS AGREEMENT. LANDSCAPE REQUIREMENTS: REFER TO LANDSCAPE PLAN L4 S00°37'56"W 214.55'R/W S00° 32' 03"W 1256.82'24 2526 23 24 25 487.86'425.90'52.07'250.99'N89° 25' 01"W 2629.97'N00° 55' 10"E 513.26'40.21'109.93'363.13'L2L6L7L8L9 L10 C 1 C 2 C 3 L11 236.09'7.87'189.65'30.00'246.77'143.17'235.00'65.00'259.89'650.12' S89° 22' 30"E 1827.47' N89°22'04"W 645.81' 213.90'177.26'189.65'65.00'235.00'143.17'246.77' N89°22'04"W 624.94'N00° 37' 56"E188.15'85.81'128.74'231.17'259.41'259.43'259.43'259.46'259.48'259.51'203.43'S72° 55' 5 9 " W 148.02' N89° 22' 04"W 225.00'N00°37'56"E 261.37'S00°37'56"W 381.26'S00°37'56"W 355.79'S00°37'56"W 307.82'N00°37'56"E 319.15'N89°09'10"W 364.40' S5 5 ° 0 4 ' 0 4 " E 7 1 3 . 3 0 'N45°42'09"E 344.05'S89°22'01"E 730.57' L12 L13L14 L15 L16 L17L18L19 L20L21L22L23L24L25 L26 N00°37'56"E 625.72'L27 L28 L29 L30 L31 L32 C 4 C 5 C 6 C 7 C 8 C 9 C 1 0 C 1 1 C 1 2 C 1 3 C 1 4 C 1 5 C 1 6 C 1 7 C 1 8 S89°22'01"E 709.74' S89°04'44"E 260.53'L33L34 L37 N45°42'09"E 344.05'L35 L36 L43 L44L45 4 5 6 8 9 10 14 3 1 2 15 16 12 13 11 2 1 W. CHINDEN BLVD (HIGHWAY 20/26)N. LINDER ROADW. PLAZA SHOPS DRIVE W. DIRECTOSTREET N. BERGMANAVENUEN. ARLISSAVENUEPARAMO U N T SUBDIVI SI O N N o. 7 PARAMO U N T SUBDIVI SI O N N o. 5MIDWAYPLACESUBDIVISIONL54 L55 794.91'52.00'863.42'55.00'864.64' S89°22'30"E 2669.54'S00°55'10"W 1328.81'S89° 25' 01"E 48.50'VARIES40.00'47.00'22.00'65.00' 30.00'35.00' 40 . 0 0 ' BOUNTI F U L C O M M O N S SUBDIVI SI O N W. Plaza Shops Drive perI.N. 2020-_______________PLS7612PLS7612L3 L1 C 2 6 L5L5657.00' 45.00' 53.00' 48.50' L57 145.00'70.00'70.00'ITD Right-of-WayI.N. ______________ PARAMO U N T SUBDIVI SI O N N o. 5 47.00' ITD Right-of-WayI.N. ______________ N1/16 N89°25'01"W 2678.47' BASIS OF BEARINGS 7 CR 2017072470 CR 2017072469 1 C27L64L6570.00'See Detail 'B' Sheet 2 See Detail 'A' Sheet 2 See Detail 'C' Sheet 2 TRUE POINT OF BEGINNING POINT OF COMMENCEMENT