Loading...
10 - Elevations----A B 2 1 TENANT A 44' - 1"9' - 2 1/2"1' - 4 17/32"5' - 0 15/32"6' - 7"11' - 4"2' - 6 3/16"35' - 7 13/32"10' - 11"36' - 2 7/16"11' - 4" 72' - 0 1/16"56' - 8 15/16" 128' - 9" 2600 ± SF 1,660± SF TENANT B C ELECTRICAL GEAR GAS METER FS RISER TENANT C 1,224 SF----------------A51-4 A51-1A51-3A51-23 SD52-4 SD52-1SD52-3SD52-2SD51-4 SD51-1SD51-3SD51-2SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID DMG REAL ESTATE PARTNERS, LLC FLOOR PLAN 12 FEBRUARY, 2021 SD21 ORCHARD PARK BUILDING 3 20231 1201 W CHINDEN BLVD MERIDIAN, ID JLHSCALE 3/16" = 1' T.O. FINISHED FLOOR 100' -0" A B T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" C T.O. PARAPET 2 123' -0" T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" A-7E-1E-1 D-2 F-6 B-4 E-1 F-6 F-6 H-5H-5B-4 H-5 C-4C-4C-4C-4 G-4 G-4 G-4 1234 5678 5678 E-3 1201 A-7 B-4 B-4 B-4 C-4 C-4 H-5 G-4 G-4 G-4 T.O. PARAPET 3 124' -0" B-4B-4B-4 C-4B-4 T.O. FINISHED FLOOR 100' -0" 21 T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" T.O. DRIVE-THRU PARAPET 126' -0" 3 T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5 E-1 H-5 D-2 F-6F-6A-7 H-5F-6 G-4 H-5A-7 B-4 C-4 G-4 G-4G-4 T.O. FINISHED FLOOR 100' -0" 2 1 T.O. STOREFRONT 110' -0" T.O. DRIVE-THRU PARAPET 126' -0" T.O. PARAPET 2 123' -0" 3 T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5 E-1 D-2 D-2E-1F-6A-7 C-4 B-4 D-2 E-1 H-5 H-5F-6 G-4 G-4G-4G-4 T.O. PARAPET 3 124' -0" T.O. FINISHED FLOOR 100' -0" AB T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" C T.O. DRIVE-THRU PARAPET 126' -0" T.O. PARAPET 2 123' -0" T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5B-4 F-6 D-2 E-1 A-7D-2D-2A-7F-6 E-1 F-6 H-5 E-1 E-1 H-5 H-5F-6 E-1 H-5 4' - 6"14' - 10"10 00-01 G-4G-4G-4G-4G-4G-4 T.O. PARAPET 3 124' -0" B-4 B-4 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID DMG REAL ESTATE PARTNERS, LLC RENDERED ELEVATIONS 12 FEBRUARY, 2021 SD51 ORCHARD PARK BUILDING 3 20231 1201 W CHINDEN BLVD MERIDIAN, ID JLH MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR X-X 1/8" = 1'-0"1ENTRY ELEVATION 1/8" = 1'-0"2SOUTH ELEVATION 1/8" = 1'-0"3NORTH ELEVATION 1/8" = 1'-0"4EAST ELEVATION A METAL:METAL SIDING. B METAL:TRIM AND FACIA. C ALUMINUM STOREFRONT D CMU SPLIT-FACE:BASELITE, COURSING PATTERN: STACK E EIFS:DRYVIT OUTSULATION PLUS MD SYSTEM, TEXTURE: SAND BLAST 1 PAINT: BUNGALOW BEIGE SW7511 2 COLOR: 695 CHARCOAL 3 PAINT: SW7660 EARL GRAY 4 BLACK ANODIZED ALUM. F CONCRETE: G METAL: COPING H INTERSTATE BRICK:EMPEROR, COURSING PATTERN: RUNNING BOND 5 COLOR: MIDNIGHT BLACK 6 NATURAL 7 PAC CLAD, FLUSH PANEL12" X 48", COLOR: MUSKET GREY, PATTERN 1/3 OFFSET T.O. FINISHED FLOOR 100' -0" A B T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" C T.O. PARAPET 2 123' -0" T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" A-7E-1E-1 D-2 F-6 B-4 E-1 F-6 F-6 H-5H-5B-4 A-7 C-4C-4C-4C-4 G-4 G-4 G-4 1234 5678 9101 E-3 1201 A-7 B-4 B-4 B-4 C-4 C-4 H-5 G-4 G-4 G-4 T.O. PARAPET 3 124' -0" T.O. FINISHED FLOOR 100' -0" 21 T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" T.O. DRIVE-THRU PARAPET 126' -0" 3 T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5 E-1 H-5 D-2 F-6F-6A-7 H-5F-6 G-4 H-5A-7 A-7 C-4 G-4 G-4G-4 T.O. FINISHED FLOOR 100' -0" 2 1 T.O. STOREFRONT 110' -0" T.O. DRIVE-THRU PARAPET 126' -0" T.O. PARAPET 2 123' -0" 3 T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5 E-1 D-2 D-2E-1F-6A-7 C-4 B-4 D-2 E-1 H-5 H-5F-6 G-4 G-4G-4 T.O. PARAPET 3 124' -0" G-4 T.O. FINISHED FLOOR 100' -0" AB T.O. PARAPET 4 125' -0" T.O. STOREFRONT 110' -0" C T.O. DRIVE-THRU PARAPET 126' -0" T.O. PARAPET 2 123' -0" T.O. WAINSCOT 103' -3" T.O. PARAPET 1 122' -0" H-5B-4 F-6 D-2 E-1 A-7D-2D-2A-7F-6 E-1 F-6 H-5 E-1 E-1 H-5 H-5F-6 E-1 H-5 4' - 6"14' - 10"10 00-01 G-4G-4G-4G-4G-4G-4 T.O. PARAPET 3 124' -0" B-4 B-4 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID DMG REAL ESTATE PARTNERS, LLC ELEVATIONS 12 FEBRUARY, 2021 SD52 ORCHARD PARK BUILDING 3 20231 1201 W CHINDEN BLVD MERIDIAN, ID JLH MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR X-X 1/8" = 1'-0"1ENTRY ELEVATION 1/8" = 1'-0"2SOUTH ELEVATION 1/8" = 1'-0"3NORTH ELEVATION 1/8" = 1'-0"4EAST ELEVATION A METAL:METAL SIDING. B METAL:TRIM AND FACIA. C ALUMINUM STOREFRONT D CMU SPLIT-FACE:BASELITE, COURSING PATTERN: STACK E EIFS:DRYVIT OUTSULATION PLUS MD SYSTEM, TEXTURE: SAND BLAST 1 PAINT: BUNGALOW BEIGE SW7511 2 COLOR: 695 CHARCOAL 3 PAINT: SW7660 EARL GRAY 4 BLACK ANODIZED ALUM. F CONCRETE: G METAL: COPING H INTERSTATE BRICK:EMPEROR, COURSING PATTERN: RUNNING BOND 5 COLOR: MIDNIGHT BLACK 6 NATURAL 7 PAC CLAD, FLUSH PANEL12" X 48", COLOR: MUSKET GREY, PATTERN 1/3 OFFSET SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID DMG REAL ESTATE PARTNERS, LLC PERSPECTIVES 12 FEBRUARY, 2021 SD53 ORCHARD PARK BUILDING 3 20231 1201 W CHINDEN BLVD MERIDIAN, ID JLHSOUTHEAST PERSPECTIVESOUTHWEST PERSPECTIVE NORTHWEST PERSPECTIVE NORTHEAST PERSPECTIVE pg. Scale: 1" = 20'-0" DESIGN REVIEW6"6"2"12" CLR. 2" 30"12"CLR.3"2" CONCRETE SOAP BLOCK, SLOPE TO DRAIN (2) #5 CONT. BOND BEAM AT TOP GROUT TOP COURSE SOLID (2) #5 CONT. BOND BEAM AT 2'-0" O.C. #6 VERT. BAR @ 16" O.C. 1/2" FIBER EXPANSION JOINT 6" CONCRETE SLAB WITH 13 X 13 D5 X D5 W.W.F. #5 DOWEL AT 24" O.C. EXTEND 36 BAR DIAMETERS OVER TOP OF FOOTING, ALTERNATE HOOKS GROUT SOLID CONC. FOOTING 12" X 30" W/ (2) #5 HORIZ. (2) #5 CONT. 6'-0" T.O. CMU 0'-0" T.O. PAVEMENT 24"STONE VENEER OVER METAL LATH AND GROUT BED, RE: SD51 E-3 T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 E-3 POST, PAINT BLACK, TYP.-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" D-8 E-3 CONCRETE SOAP BLOCK SLOP TO DRAIN-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" B-4 C-6 B-4 POST, PAINT BLACK CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 1. LONGBOARD SIDING, 6" CHANNEL PROFILE, COLOR: LIGHT FIR 2. WESTERN RED CEDAR TIMBER, COLOR: STORM SEALANT: 20041 3. 4. ANODIZED ALUMINUM, COLOR: BLACK 5. NATURAL COLOR 6. BERRIDGE 'M' DECK 7. SW BUNGALOW BEIGE 8. DARK GRAY A. WOOD B. METAL C. CORRUGATED METAL D. CONCRETE E. F. STUCCO X -#MATERIAL LEGEND 1/2" = 1'-0"1TRASH ENCLOSURE - WALL SECTION 1/2" = 1'-0"3ENCLOSURE SIDE - ELEVATION 1/2" = 1'-0"4ENCLOSURE REAR - ELEVATION 1/2" = 1'-0"2ENCLOSURE FRONT - ELEVATION TRASH ENCLOSURE SD54 200 W BROAD STREET, BOISE,ID DMG REAL ESTATE PARTNERS, LLC 18 JANUARY, 2021