Edington Pump House DES A-2021-0093CERTIFICATE OF ZONING
COMPLIANCE REPORT
COMMUNITY DEVELOPMENT DEPARTMENT
DATE: 5/ 10/2021
TO: Sophia Durham
G20 LLC
FROM: Stacy Hersh, Assistant Planner
208-884-5533
SUBJECT: A-2021-0093
Edington Pump House DES
LOCATION: 3590 N. Linder Road
I. PROJECT DESCRIPTION
( �/ WE IDIAN*--
.►AHO
The applicant Sophia Durham, requests Administrative Design Review (DES) approval to construct
a new 192 square foot shed (public utility minor) to house the irrigation equipment that will be used
to provide pressurized irrigation to the Edington Commons Subdivision on 7.27 acres of land in the
R-15 zoning district. NOTE: The irrigation plans were reviewed and approved with the
development (H-2019-0190).
II. DECISION
The applicant's request for Administrative Design Review (DES) is approved with the conditions
listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if
you need a building permit and/or inspection. If you do need a building permit, you must complete
that process before you commence the use or construction. Please contact Building Services for
additional details about building permits and inspections.
Site Specific Conditions of Approval
1. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3
Article D and receive approval for such signs.
2. The applicant shall complete all improvements related to public life, safety, and health as set forth
in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with
UDC 11-5C-3C.
Page 1
3. The site plan prepared by Civil Site Works on February 8, 2021, labeled C2.0, is approved by the
City of Meridian Planning Division as shown in Exhibit A.
4. The elevations prepared by Guided Light Drafting on April 27, 2021, labeled 1.0, are approved
by the City of Meridian Planning Division as shown in Exhibit B.
5. The approved site plan and elevations may not be altered without prior written approval of the
City of Meridian Planning Division.
6. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
7. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant
shall submit a new site plan to the City of Meridian Planning Division for approval prior to
issuance of the building permit.
8. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building Official
has issued a Certificate of Occupancy.
9. If the subject property is part of a final plat that has not yet recorded, the applicant shall be
responsible for all plat improvements prior to release of Certificate of Occupancy for the
first structure within such plat.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets
the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth
in UDC 11-313-5, UDC 11-3B-13 and UDC 11-313-14.
2. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (AZ, PP H-2019-0109, DA Inst. #2020-044056; FP-2020-
0005).
III. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director. All
requests for review shall be filed in writing with the Planning Division on or before May 25, 2021,
within fifteen (15) days after the written decision is issued, and contain the information listed in UDC
11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a final
decision on a land use application. You have the right to request a regulatory taking analysis under
Idaho Code 67-8003.
IV. EXPIRATION
The Administrative Design Review shall be exercised with the approval period of the
underlying permit or the approval shall expire.
Page 2
V. EXHIBITS
A. Site Plan (date: 2/8/2021)
III II
Y
"
,
�.
....., �.�,..,. .......�... � �p � � _ _ � _... ,L_•e� R� ;
�03 ;o is
8 'y'S 3 � i .•� �.' �.'i�i.-w--3[�^r.:•F-i-.=T�� ' �sa ji
r�s
piet'•74��&i.:ti='�!-'°a5��y:.�.n�'rL,•
y
ILir`k
w
C2.0
s J .
Page 3
B. Building Elevations (date: 4/27/2021)
iz
�FRONT ELEVAIM
iI! =1�
.-, REAR ELEvwrioN
L �fII =-1�•
^RIGHT ELEVAim
�d =lam
------------
IL:
/1 LEFT BEVArON
IL
!01 FOUNDATION PIA"
�ra =mow'
Page 4
ITV
EESM COMMA 2MM Mc
VM-
n ROOF FRAMING PINJ
TYP. 0+, EAVE
�l
n TW. SIEfA VYALL