Loading...
A2_ELEVATIONS, SECTION2.5 / 12 2.5 / 12 A.2 210013A 04/09/21PART OF T.3N, R.1E SECTION 16, MEADOW LAKE PAVILION4037 E CLOCKTOWER LN, MERIDIAN, IDAHO, ADA COUNTYSHEET SHEET TITLE CONSTRUCTION SETPROJECT DATE DRAWN AFN CHECKED LCLGENERAL CONTRACTOR: CHARTER CONTRACTOR SERVICES, LLC.8150 WATERLILY AVE. NAMPA, IDAHO 83687 - (208) 860 0118 RCE-31461REVISIONS C COPYRIGHT 1999-2019 LCL THESE ARCHITECTURAL DRAWINGS ARE PROPRIETARY AND REPRESENT A DESIGN INTENT, CONCEPT AND SPECIFIC CONSTRUCTION INFORMATION. THESE DOCUMENT AND ALL ASSOCIATED DRAWINGS ARE PREPARED FOR A SPECIFIC SITE AND EVENT, AND INCORPORATE CALCULATIONS AND MEASUREMENTS AVAILABLE FROM THE CLIENT AT THE TIME OF DEVELOPING THEM. THE CONTENTS OF THESE DOCUMENTS CANNOT BE REPRODUCED, COPIED, DIVULGED, OR DISTRIBUTED, IN WHOLE OR PART, EXCEPT AS REQUIRED FOR THE SPECIFIC EVENT NAMED, WITHOUT WRITTEN PERMISSION OF EVERGREEN ARCHITECTURE, PLLC (THE ARCHITECT). USE OF THIS DESIGN IS GRANTED TO THE CLIENT FOR THE SPECIFIED AND NAMED EVENT ONLY.AR-215311200 W. HERCULES DR. #103 -STAR, IDAHO 83669208.375.4600 (o) 208.375.4030 (f)www.EverGreenIdaho.com04/09/21 1 BUILDING SECTION 1/4" = 1'-0"2 EAST ELEVATION 1/4" = 1'-0" 4 WEST ELEVATION 1/4" = 1'-0"3 NORTH ELEVATION 1/4" = 1'-0"5 SOUTH ELEVATION 1/4" = 1'-0" 6 GRADE BEAM 1" = 1'-0"9 POST FOOTING 1" = 1'-0"8 TYP. FOOTING 1" = 1'-0"7 POST FOOTING - (MID SPAN 1" = 1'-0" ELEVATIONS, SECTION & DETAILS4/19/2021 3:53:19 PM