A2_ELEVATIONS, SECTION2.5 / 12
2.5 / 12
A.2
210013A 04/09/21PART OF T.3N, R.1E SECTION 16, MEADOW LAKE PAVILION4037 E CLOCKTOWER LN, MERIDIAN, IDAHO, ADA COUNTYSHEET
SHEET TITLE
CONSTRUCTION SETPROJECT DATE
DRAWN
AFN
CHECKED
LCLGENERAL CONTRACTOR: CHARTER CONTRACTOR SERVICES, LLC.8150 WATERLILY AVE. NAMPA, IDAHO 83687 - (208) 860 0118 RCE-31461REVISIONS
C COPYRIGHT 1999-2019 LCL
THESE ARCHITECTURAL DRAWINGS ARE
PROPRIETARY AND REPRESENT A DESIGN
INTENT, CONCEPT AND SPECIFIC
CONSTRUCTION INFORMATION. THESE
DOCUMENT AND ALL ASSOCIATED DRAWINGS
ARE PREPARED FOR A SPECIFIC SITE AND
EVENT, AND INCORPORATE CALCULATIONS
AND MEASUREMENTS AVAILABLE FROM THE
CLIENT AT THE TIME OF DEVELOPING THEM.
THE CONTENTS OF THESE DOCUMENTS
CANNOT BE REPRODUCED, COPIED,
DIVULGED, OR DISTRIBUTED, IN WHOLE OR
PART, EXCEPT AS REQUIRED FOR THE
SPECIFIC EVENT NAMED, WITHOUT WRITTEN
PERMISSION OF EVERGREEN ARCHITECTURE,
PLLC (THE ARCHITECT). USE OF THIS DESIGN
IS GRANTED TO THE CLIENT FOR THE
SPECIFIED AND NAMED EVENT ONLY.AR-215311200 W. HERCULES DR. #103 -STAR, IDAHO 83669208.375.4600 (o) 208.375.4030 (f)www.EverGreenIdaho.com04/09/21
1 BUILDING SECTION
1/4" = 1'-0"2 EAST ELEVATION
1/4" = 1'-0"
4 WEST ELEVATION
1/4" = 1'-0"3 NORTH ELEVATION
1/4" = 1'-0"5 SOUTH ELEVATION
1/4" = 1'-0"
6 GRADE BEAM
1" = 1'-0"9 POST FOOTING
1" = 1'-0"8 TYP. FOOTING
1" = 1'-0"7 POST FOOTING - (MID SPAN
1" = 1'-0"
ELEVATIONS,
SECTION &
DETAILS4/19/2021 3:53:19 PM