Loading...
Z - Findings Item#14. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW E IDIAN�' AND DECISION& ORDER A 1 In the Matter of Request for Annexation of 4 Acres of Land with an R-8 Zoning District for Meridian South Fire Station &Police Substation,by Stacy Redman,City of Meridian. Case No(s). AZ H-2021-0008 For the City Council Hearing Date of: April 27,2021 (Findings on May 11,2021) A. Findings of Fact 1. Hearing Facts(see attached Staff Report for the hearing date of April 27,2021, incorporated by reference) 2. Process Facts(see attached Staff Report for the hearing date of April 27, 2021,incorporated by reference) 3. Application and Property Facts(see attached Staff Report for the hearing date of April 27,2021, incorporated by reference) 4. Required Findings per the Unified Development Code(see attached Staff Report for the hearing date of April 27,2021, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use Planning Act of 1975,"codified at Chapter 65, Title 67,Idaho Code(I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified as Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has,by ordinance, established the Impact Area and the Comprehensive Plan of the City of Meridian, which was adopted December 17, 2019,Resolution No. 19-2179 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s)received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. 6. That the City has granted an order of approval in accordance with this Decision,which shall be signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant,the Community Development Department,the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the Conditions of Approval all in the attached Staff Report for the hearing date of April 27,2021, incorporated by reference. The conditions are concluded to be FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER FOR(MERIDIAN SOUTH FIRE STATION&POLICE SUBSTATION—FILE#H-2021-0008) - I Page 230 Item#14. reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § 11-5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for annexation and zoning to R-8 is hereby approved per the conditions of approval in the Staff Report for the hearing date of April 27,2021, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Preliminary Plat Duration Please take notice that approval of a preliminary plat, combined preliminary and final plat, or short plat shall become null and void if the applicant fails to obtain the city engineer's signature on the final plat within two (2)years of the approval of the preliminary plat or the combined preliminary and final plat or short plat(UDC 11-6B-7A). In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if submitted within successive intervals of two (2)years,may be considered for final approval without resubmission for preliminary plat approval(UDC 11-613-713). Upon written request and filed by the applicant prior to the termination of the period in accord with I I-6B-7.A,the Director may authorize a single extension of time to obtain the City Engineer's signature on the final plat not to exceed two(2)years.Additional time extensions up to two (2)years as determined and approved by the City Council may be granted.With all extensions,the Director or City Council may require the preliminary plat, combined preliminary and final plat or short plat to comply with the current provisions of Meridian City Code Title 11. If the above timetable is not met and the applicant does not receive a time extension,the property shall be required to go through the platting procedure again(UDC 1I- 6B-7C). Notice of Development Agreement Duration The city and/or an applicant may request a development agreement or a modification to a development agreement consistent with Idaho Code section 67-6511A. The development agreement may be initiated by the city or applicant as part of a request for annexation and/or rezone at any time prior to the adoption of findings for such request. A development agreement may be modified by the city or an affected party of the development agreement. Decision on the development agreement modification is made by the city council in accord with this chapter. When approved, said development agreement shall be signed by the property owner(s)and returned to the city within six(6)months of the city council granting the modification. A modification to the development agreement may be initiated prior to signature of the agreement by all parties and/or may be requested to extend the time allowed for the agreement to be signed and returned to the city if filed prior to the end of the six(6)month approval period. FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER FOR(MERIDIAN SOUTH FIRE STATION&POLICE SUBSTATION—FILE#H-2021-0008) -2- Page 231 Item#14. E. Notice of Final Action and Right to Regulatory Takings Analysis 1. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight(28)days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff Report for the hearing date of April 27,2021 FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER FOR(MERIDIAN SOUTH FIRE STATION&POLICE SUBSTATION—FILE#H-2021-0008) -3- Page 232 Item#14. By action of the City Council at its regular meeting held on the 11 day of May,2021. COUNCIL PRESIDENT TREG BERNT VOTED COUNCIL VICE PRESIDENT BRAD HOAGLUN VOTED COUNCIL MEMBER JESSICA PERREAULT VOTED COUNCIL MEMBER LUKE CAVENER VOTED COUNCIL MEMBER JOE BORTON VOTED COUNCIL MEMBER LIZ STRADER VOTED MAYOR ROBERT SIMISON VOTED (TIE BREAKER) Mayor Robert E. Simison 5-11-2021 Attest: Chris Johnson 5-11-2021 City Clerk Copy served upon Applicant, Community Development Department,Public Works Department and City Attorney. By: Dated: 5-11-2021 City Clerk's Office FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER FOR(MERIDIAN SOUTH FIRE STATION&POLICE SUBSTATION—FILE#H-2021-0008) -4 Page 233 EXHIBIT A STAFF REPORT E IDIANn-=- COMMUNITY DEVELOPMENT DEPARTMENT A H O HEARING 4/27/2021 Legend DATE: 0 TO: Mayor&City Council FROM: Alan Tiefenbach,Associate Planner 208-884-5533 - - Bruce Freckleton,Development Services Manager 208-887-2211 SUBJECT: AZ H-2021-0008 , Meridian South Fire Station&Police Substation 41 LOCATION: 2385 E. Lake Hazel Rd South side of E. Lake Hazel Rd,between S. Locust Grove Rd. and S. Eagle Rd. I. PROJECT DESCRIPTION Annexation&zoning of 4 acres of land with the R-8 zoning district to develop a 11,650 sq. ft. fire station and 11,060 sq. ft.police substation building(public or quasi-public use). The applicant is the City of Meridian. The property is directly east of Discovery Park, and surrounded by land that was annexed in 2015 as the South Meridian Annexation, although the subject property was not included as part of the annexation. Plans are to develop the fire station and the police substation separately, with the fire station construction planned for 2022. Following annexation,a conditional use permit is required for a public or quasi-public use in the R-8 zone district per UDC 11-2A-2. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 4 acres Future Land Use Designation Medium Density Residential Existing Land Use(s) Residential/Rural Proposed Land Use(s) Public or quasi-public use(Fire Station and Police Substation) Lots(#and type;bldg./common) 1 Phasing Plan(#of phases) 2,with the fire station proposed for development first. Density(gross&net) N/A Open Space(acres,total N/A [%]/buffer/qualified Amenities 6 N/A Page 1 Page 234 Item#14. Description Details Page Physical Features(waterways, None hazards,flood plain,hillside) Neighborhood meeting date;#of February 3,2021,no neighbors attended. attendees: History(previous approvals) None B. Community Metrics Description Details Page Ada County Highway District • Staff report(yes/no) Yes • Requires ACHD Commission No Action es/no Access(Arterial/Collectors/State E.Lake Hazel Rd/New N/S collector that is planned for Hwy/Local)(Existing and Proposed) construction at the east of the property. Traffic Level of Service Stub Street/Interconnectivity/Cross Applicant will be required to construct collector street Access along the eastern property line which will stub at the south adjacent to the southern property line. Existing Road Network E.Lake Hazel Rd. ML Existing Arterial Sidewalks/ None along property. There is an existing 10'pathway Buffers along the Discovery Park frontage to the west. Proposed Road Improvements Applicant will be required to construct 10'pathway along E.Lake Hazel Rd and will construct the new north/south collector roadway at the site's east property line to stub to the site's south property line as well as 10'pathway along this frontage as well. Distance to nearest City Park(+ Discovery Park(South Meridian Regional Park)directly size) adjacent to the west and south. Fire Service • Distance to Fire Station The proposal includes a fire station. Police Service • Distance to Police Station The proposal includes a police substation. Wastewater • Distance to Sewer Services N/A • Sewer Shed South Black Cat Trunkshed • Estimated Project Sewer See Application ERU's • WRRF Declining Balance 14.08 • Other Sewer will come from Discovery Park Flow is committed Water • Distance to Water Services 0 • Pressure Zone = 5 • Estimated Project Water See Application ERU's • Water Quality No concerns • Project Consistent with Water Yes Master Plan • Other Water will come from E.Lake Hazel Rd. Page 2 Page 235 1 1Aerial Map IIII �■ili _ - - f. ,F4 ,..I'xr. ,�. 111' 11111 -iiiiiiii ,a 'k 'I4i i '�1 1 • 11 11 III Il�ir�rw .IL 1111� u ril eu �q =' _ _ R le- - um 1 � uuuwl . Ct 1` W 111 Y 'FS 'r"11 a a a " a r C I _ ■ 1 1 1 1 I I I 1 111 - W1` WI 11111 ,, 11.11 „ IIII uu - IIII pYYIYn I�uu ilia ,,, - uuu sue- z nw - Ii111, IIIJIII- 11111 1 _ 1 Z ��111111 - _ llili _ I�iiiin Ilnlllll :1111� iiiill ll ■ �11� uuu au-1 . � ■ 1�11��1 -INUI� �hlw uu u uu ■■ 1 � � Illlll� lu ml w uumu I = m 1 r 11111111 ���. + M Lrlr. IIII�Z _- -_ 2=- III EuT=- � I IIII I I uwuu RII��� �- I RIIR _ IIII I111111111111= IIII I_- =r.�— Illllllll • � ____ " " r' a�'�it ail.'ll � �I Ililllll E— •E E—HPi�E 1111� � IIII IIIIII = ■ -= IIII �■� � I uuu all � I =III IIIIII IIII _Illl�b III Item#14. III. APPLICANT INFORMATION A. Applicant/Representative: Stacy Redman, City of Meridian 33 E. Broadway Ave,Meridian, ID 83642 B. Owner: City of Meridian 33 E. Broadway Ave,Meridian, ID 83642 IV. NOTICING Planning&Zoning City Council Posting Date Posting Date Newspaper Notification 3/12/2021 4/9/2021 Radius notification mailed to properties within 500 feet 3/9/2021 4/7/2021 Radius notification published on 2/22/2021 4/9/2021 Nextdoor posting 3/9/2021 4/7/2021 Sign Posting 3/15/2021 4/8/2021 V. STAFF ANALYSIS A. Future Land Use Map Designation(https://www.meridiancity.org/compplan) The property is designated for medium density residential (MDR). This designation allows for dwelling units at gross densities of three to eight dwelling units per acre. Density bonuses may be considered with the provision of additional public amenities such as a park, school, or land dedicated for public services. The FLUM shows a fire and police station symbol in the general vicinity(north side of E. Lake Hazel Rd). The purpose of this designation is to preserve and protect existing and planned fire and police station locations throughout the Area of City Impact which provide efficient emergency response. The proposed fire and police station in this location would be consistent with the recommendations of the FLUM. B. Comprehensive Plan Policies(https://www.meridiancity.orglcompplan): • Develop and implement master plans for all public facilities, services, and safety to guide the growth of the City. (3.02.01). The subject property is shown to be within an area designated as afire/police station on the Future Land Use Map. • Support the appropriate expansion of City facilities, services, staff, and other resources to keep up with demand and established levels of service. (3.02.01D) • Ensure that quality fire protection,rescue and emergency medical services are provided within Meridian. (4.11.03) • Establish and maintain levels of service for public facilities and services, including water, sewer,police,transportation, schools,fire, and parks. (3.02.01 G) A significant amount of land has been annexed in the surrounding area. This includes the Impressive East Ridge, Bicentennial Farms,Apex and Apex Southeast, Lavender Heights, Sky Page 4 Page 237 Item#14. Mesa, Pura Vida and The Keep subdivisions.Much of this area is not within the City's preferred 5-minute response time, and this future fire station and police sub-station were anticipated during the analysis of these projects'analysis. This annexation and zoning would support appropriate expansion and maintenance of services and would ensure quality fire and emergency services and would significantly improve the emergency response times. • Ensure that new development and subdivisions connect to the pathway system. (4.04.01A) The Pathways Master Plan shows a future 10'wide pathway along E. Lake Rd. as well as a 10'pathway along the eastern portion of the property(in the area of the future collector road). The 10'pathway already exists along the northern perimeter of Discovery Park; the applicant will be required to complete this pathway along the north and eastern property lines. • Reduce the number of existing access points onto arterial streets by using methods such as cross access agreements,access management, and frontage/backage roads, and promoting local and collector street connectivity. (6.01.02B) The property presently takes access from two driveways off E. Lake Hazel Rd. However, a future collector is shown at the east side of the property. This collector is intended to serve the subject property as well as provide access to Discovery Park. The applicant will build this collector road from E. Lake Hazel Rd to the southern property line.As is required by UDC 11-3A-3, the applicant will be required to close both driveways accessing E. Lake Hazel Rd. • Require all new development to create a site design compatible with surrounding uses through buffering, screening,transitional densities,and other best site design practices. (3.07.01A) The applicant's concept plan shows landscape buffers along E. Lake Rd and the future collector street. Landscape screening is reflected on the plan to screen the site from Discovery Park at the west and any future development to the south. C. Existing Structures/Site Improvements: There is an existing residence and agricultural buildings on the site which were constructed in 1940. All buildings will be removed with development of the site. D. Proposed Use Analysis: UDC defines fire station and police stations as a"public or quasi-public use."This use is allowed in the R-8 zone district as a conditional use. E. Specific Use Standards(UDC 11-4-3): UDC 11-4-3-30 states public or quasi-public uses shall meet the standards for office use in accord with the district in which the use is located. F. Dimensional Standards(UDC 11-2): The applicant proposes to zone the property to R-8. Dimensional standards in the R-8 zone district include a minimum lot size of 4,000 sq. ft., front setbacks of 25' from a collector street, rear setback of 12' and 10' side setback. Building height is limited to 35'. A 25' buffer is required along arterial roads and 20' along collector roads. The concept plan as submitted appears to meet the minimum dimensional standards. Page 5 Page 238 Item#14. G. Access(UDC 11-3A-3, 11-3H-4): Lake Hazel Road is improved with 2-travel lanes and no curb,gutter or sidewalk abutting the site. There is 50-feet of right-of-way for Lake Hazel Road. Lake Hazel Road is planned to be widened to 5-lanes from Locust Grove Road to Eagle Road between 2036 and 2040. ACHD is requiring the applicant to dedicate right-of-way along Lake Hazel Road abutting the site. ACHD has mentioned the applicant will be required to construct a minimum 5-foot wide detached concrete sidewalk,but as already mentioned,the Parks Dept is requiring the applicant to construct a 10' detached pathway along E. Lake Hazel to connect to the pathway to the west. The applicant will be required to construct a new north/south collector roadway along the site's east property line from the south property line to Lake Hazel Road. The applicant will also be required to install a temporary turnaround at the terminus of the stub street since it will be longer than 150-feet. Although ACHD is requesting the applicant construct 5' wide sidewalk along this collector,per the Parks Department,the applicant will be required to construct a 10' detached pathway along this section. This E. Lake Hazel Rd/Collector Road intersection is planned for signalization. The applicant has proposed to construct 2 driveways from the site to the new collector roadway; one for the police station and a wider driveway for the fire station. The applicant will be required to close the 2 existing driveways from the site onto Lake Hazel Road. H. Parking(UDC 11-3C): UDC 11-3C requires one (1) space for every five hundred(500) square feet of gross floor area. With 22,710 sq. ft.between the first station and the police sub-station,45 parking spaces are required,whereas 55 are provided. 17 parking spaces are provided to the public at the east,and 38 secure parking spaces are provided at the west side of the property. 12 of the parking spaces would be covered.The concept plan shows at least 3 additional spaces for fire apparatus at the east side of the fire station. The parking plan does not appear to meet all the landscaping requirements of UDC 11-3B-8. Internal parking lot landscaping is required with any parking lot with more than 12 spaces, including internal islands at intervals no greater than 12 spaces. Landscape planters are also required at the end of rows of parking. This will need to be addressed at the time of CZC submittal. I. Pathways ( UDC 11-3A-8): The Pathways Master Plan shows a future 10' wide pathway along E. Lake Rd. as well as a 10' pathway along the eastern portion of the property(in the area of the future collector road). The 10' pathway already exists along the northern perimeter of Discovery Park; construction of a pathway along the north and a new detached pathway along the eastern property line will be required with development of the site. J. Sidewalks(UDC 11-3A-17): The applicant will be required to construct pathways along the north and east property lines as part of this development. K. Parkways (UDC 11-3A-17): Parkways are not included with this development. Page 6 Page 239 Item#14. L. Landscaping(UDC 11-3B): UDC 11-2A-5 requires a 25' wide buffer along arterial roads and 20' along collector roads. These buffers must be landscaped at one(1)tree per thirty-five(35) linear feet. Parking lot landscaping is required around the perimeter of the parking lot, and no linear grouping of parking spaces shall exceed twelve (12)in a row,without an internal planter island. Parking islands are also required at the ends of all parking rows. The submitted concept plan does suggest the road buffers are incorporated but along the E. Lake Hazel Rd frontage there is no landscaping shown. As mentioned in the parking analysis above, the parking lot and road buffers will need to meet the requirements of UDC 11-2A-5 at the time of CZC. There are existing trees on the site that will be removed with development of the site. The applicant should work with the City Arborist and submit a landscape plan that meets the tree mitigation requirements of UDC 11-3B-10 at the time of CZC submittal. M. Waterways(UDC 11-3A-6): No waterways are associated with this development. N. Fencing(UDC 11-3A-6, 11-3A-7): The applicant proposes security fencing of up to 8' in height(fencing shown in red on the attached concept plan). The materials and type of fencing is not specified. Staff notes fencing height is limited to 6' in height in the R-8 zone district. The applicant should apply for alternative compliance concurrently with the CZC. There was discussion during the pre-application meeting regarding whether there would be security issues with the screen fencing on the west side of the site obstructing views into Discovery Park. It was determined this would require storage of vehicles at the east, along the new collector and in the same location as public parking,which was determined to be less than ideal. O. Utilities (UDC 11-3A-21): Connection to City water and sewer services is proposed in accord with UDC 11-3A-21. The submitted Water Main& Service Sizing Plan indicates 8"water and sewer lines serving the property. Water would be provided from a main in E. Lake Hazel Rd. Sewer would be provided from a main at Discovery Park. P. Building Elevations(UDC 11-3A-19 I Architectural Standards Manual): The Applicant has submitted colored elevations for both buildings. Architecture consists of sloped roof buildings with CMU and wood grain metal panel as the primary field materials, and exposed timber frame and metal soffit accents. The proposed architecture will be reviewed in detail with Administrative Design Review and must meet the requirements of the City of Meridian Architectural Standards Manual and the site and structure design standards in UDC 11- 3A-19. VI. DECISION A. Staff: Staff recommends approval of the proposed annexation per the provisions and comments included in Section VII in accord with the Findings in Section V111. Page 7 Page 240 Item#14. B. The Meridian Planning&Zoning Commission heard this item on April 1,2021.At the public hearing,the Commission moved to approve the subject annexation request. 1. Summary of the Commission public hearing a. In favor: Gunnar Gladics,Rice Fergus Miller b. In opposition:None c. Commenting: Gunnar Gladics d. Written testimony: None e. Staff presentinggpplication: Alan Tiefenbach f. Other Staff commenting on application:None 2. Key issue(s) testimony a. None 3. Key issue(s)of discussion by Commission: a. None 4. Commission change(s)to Staff recommendation: a. None C. The Meridian City Council heard these items on April 27,2021.At the public hearing.the Council moved to approve the subject annexation and zoning requests. 1. Summary of the City Council public hearing: a. In favor: Gunnar Gladics b. In opposition:None c. Commenting: Gunnar Gladics d. Written testimony: None e. Staff presenting application: Alan Tiefenbach f. Other Staff commenting on application:None 2. Key issue(s)of public testimony: a. None 3. Key issue(s)of discussion by City Council: a. None 4. City Council change(s)to Commission recommendation: a. None Page 8 Page 241 Item#14. VII. EXHIBITS A. Concept Plan(date: 1/5/2021) - j 1 ■ i t j= 1 is 1 is 1 - a 2 0 Cr w ZD a Page 242 Item#14. B. Water Main and Service Sizing Plan(date: 2/23/2021) — F.I.V:— ?=1 F�. SLEIION LlF-— �Q i FE 13 lu &V HH E SEH's'1uE I M4 WATm MAN 24�uV�SETr WAIER {STUBBED V OTHERS, +211-LT Kfi'S[10 SFA'MF&Z4NWA7L9 MFTFR 1 - PHJPU7 EDHYC�AVT 1 • �: _�Ile It - 8-M SEWER MAIN (sIL•r3ULDi y till 1EgE�' M -IN FFF SFFNIC F - n4l INTO'FT AT G.T• S% MIN) 1 ' 24N QaMESEM kVATER RRE H4[1lgAN, i 71;','k C$24N WATFR!METER [9Y O7}ERS) ` anti SE14>R A�AK 1 F i � sum:1.) 124N WATFR NWU B1.O{i,5[];FC: TA:,: ice'4THER$� k 1 fL�ii.f iilJ�lil MamamL=1 Im f5 IiIY 1'Ji4 Page 10 Page 243 Item#14. C. Building Elevations: 2/9/2021) �—Now-- LEGEND 1.)Four Fold flows 2.)Overhead 3ectlanal Doors 3.)Composts Shingle Roofing _ - 4.)Mehl Fasda with Metal Soft -- LA - = 5.)Glulwn Columns and Beams 6.)Metal Pana4s 7.)Wood Grain Metal Panel S.)Premium Grade Ground Face CMU 9.)Wcod Grain Metal Panel Screening B + e i e a a a r a �61 FRONT J Page 11 Page 244 Item#14. - = - LEGEND 1.)Four Fold GYara 2_)Owwhand Saul doors - 3-)DorrgxmNs Shingle RaAng ova _ 4.)Me4!Faede rdth Mecal So1Rt r I 5.]€&dmFnCokmns and Beaune - 5.) Panels 7.)Wood Grain Metal Panel 6_)Premium grade{;round 4-Boo CMU 0.)WoM Grain Ma®I Parsl SawkV 5 I Page 12 Page 245 Item#14. D. Annexation Legal Exhibit EXHIBIT"A" ANNEXATION J REZONE MERIDIAN RURAL FIRE PROTECTION DISTRICT MERIDIAN FIDE STATION#S A parcel of and situate in a portion of Government Lot 3 of Section 5,Township 2 North, Range 1 East, Boise Meridian,Ada County, Idaho, being more particularly described as fol lows; BEGINNING at the North One Quarter Corner of said Section 5,(from which the West One Sixteenth corner ccmman to Sections 5 and 32 bears North 89"58' 22" West, 1331.92 feet, distance); Thence on the north-south mid-section line of said Section 5,South 00'01'18"West, 500. feet; Thence North 89'58' 22" West, 348.63 feet; Thence North 00'02' 18" East,500.00 feet,to a paint on the north line of said Section S; Thence on said north line, South 89"58'22"East,348.48 feet,to the POINT OF BEGINNING. The above-described parcel contains 174,277 Ft'(4.00 acres)more or less. PREPARED BY: NI,LA The Land Group, Inc, `�0 N Michael Femenia, PLS ry 2. i 1 5 ��'t OF ` S. D'f 13f2" Page 13 Page 246 Item#14. �589°570WE 1331.97' N8958'22'W 983.44' EAST LAKE HAZEL O D 79-7 2"E 348.48' NW C4R SEC.5 WEST 1J16TH P�8 N1t4 5E0.5 CP&F#2015-011238 CP&F#111068375 Z T Cn 2385 E LAKE HAZEL RD MERIDIAN RURAL FRE PROTECT10N DISTRICT MERIDIAN FIRE STATION#8 Y a ry a o APN:S1405212420, ' ZE - 0 174.277 Ft'-(4.00 Acres}± w � a Annexation Rezone far Meridian Rural Fire Protection District Situate in a Portion of Lot 3 of Section 5 Township 2 North,Rangee 1 1 E East,Boise Meridian Ada County.Idaho N89 58'22"W 348.63` 2021 Cq 4D Grp �GT .:p � �- a� � I 0 U3 �• �n 01J4 SECS CP&F#114018231 L�1143f2U2'� r. Exhibit ,V, Page 14 Page 247 Item#14. VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION a. Future development of this site shall be generally consistent with the conceptual site plan, conceptual building elevations, and the provisions contained herein. b. All structures shall comply with the design standards listed in the Architectural Standards Manual and the design standards listed in UDC 11-3A-19. An application for Design Review shall be submitted concurrently with the Certificate of Zoning Compliance application and approved prior to submittal of building permit applications. c. Per UDC 11-2A-2, a conditional use permit is required for a public or quasi-public use in the R-8 zone district prior to CZC and design review submittal. d. A segment of the City's 10-foot multi-use pathway along E. Lake Hazel Rd and the new collector street planned along the east boundary of the property shall be constructed prior to certificate of occupancy. e. The applicant shall design and construct the multi-use pathways along E. Lake Hazel Rd and the new collector street planned along the east boundary of the property consistent with Meridian Pathways Master Plan. f. Applicant shall construct the required landscape buffers along streets consistent with the standards as set forth in UDC 11-3B-7C in accord with the installation schedule in UDC 11-3B- 14. g. Parking lot landscaping shall meet the requirements of UDC 11-313-8C. h. At time of CZC, a landscape plan shall be submitted that preserves any existing trees on the subject property that are four-inch caliper or greater; or mitigate for the loss of such trees as set forth in UDC 11-313-1OC. i. Applicant shall comply with any ACED conditions of approval. j. All proposed fencing and/or any fencing shall be constructed as required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and I I-3A-6B, as applicable, or submit an application for alternative compliance concurrent with the future CUP or CZC/DES application. k. Collector Road to east shall be constructed with the first phase of development. 1. There shall be no access to or from E. Lake Hazel Rd. in. The applicant shall comply with the ordinances in effect at the time of application submittal. n. The applicant shall be required to comply with tree preservation mitigation standards per UDC 11-3B-10. A. PUBLIC WORKS 1. Site Specific Conditions of Approval 1.1 Sanitary sewer and water infrastructure plans will need to be submitted and approved through the Land Development Division of Community Development. 1.2 A street light plan will need to be included in the final plat and or building permit application. Street light plan requirements are listed in section 6 of the City's Design Standards. Page 15 Page 248 Item#14. 2. General Conditions of Approval 2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department. Minimum cover over sewer mains is three feet,if cover from top of pipe to sub- grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2.2 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at(208)334-2190. 2.3 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.4 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.5 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.6 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.7 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.8 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 2.9 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.10 At the completion of the project,the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 2.11 A street light plan will need to be included in the civil construction plans. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.oMIpublic_works.aspx?id=272. B. MERIDIAN PARKS AND PATHWAYS https://weblink.meridiancily.orglWebLinkIDocView.aspx?id=224659&dbid=0&redo=MeridianC iv C. ACHD https://weblink.meridianciU.orglWebLinkIDocView.aspx?id=224325&dbid=0&repo=MeridianC iv Page 16 Page 249 Item#14. IV. FINDINGS A. Annexation and/or Rezone(UDC 11-513-3E) Required Findings: Upon recommendation from the commission,the council shall make a full investigation and shall,at the public hearing,review the application. In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; Council finds annexation of the subject site with an R-8 zoning designation is consistent with the Comprehensive Plan MDR FL UM designation for this property. This area is specifically recommended for afire and/or police station (see Section V for more information). 2. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; Council finds that a map amendment to the R-8 zoning district is consistent with Comprehensive Plan as the Plan puts high priority on quality fire protection, rescue and emergency medical services. 3. The map amendment shall not be materially detrimental to the public health, safety, and welfare; Council finds that the proposed zoning map amendment should not be detrimental to the public health, safety, or welfare as the proposed facilities are intended to protect the public health, safety and welfare. Council considered any oral or written testimony that may be provided when determining this finding. 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and Council finds that the proposed zoning amendment will not result in any adverse impact upon the delivery of services by any political subdivision providing services to this site. 5. The annexation(as applicable)is in the best interest of city As the need for adequate public services and facilities is mentioned repeatedly in the Comprehensive Plan, Council finds that the proposed annexation is in the best interest of the City. Page 17 Page 250