Z - Signed Findings Item 4. F58 CITY OF MERIDIAN V IDIAN;--- FINDINGS OF FACT, CONCLUSIONS OF LAW AND ! DAHO DECISION& ORDER In the Matter of the Request for a Modification to the Conditional Use Permit to Revise the Site Layout for the Northeast 11.22-Acre Portion of the Development to Include a Consolidation of Common Open Space into more Usable Areas,the Addition of a Clubhouse and Other Amenities, and a Change to the Mix of Unit Types within the Development for Pine 43 Apartments,by Pivot North Design. Case No(s).MCU-2021-0002 For the Planning&Zoning Commission Hearing Date of: April 15,2021 (Findings on May 6, 2021) A. Findings of Fact 1. Hearing Facts(see attached Staff Report for the hearing date of April 15,2021, incorporated by reference) 2. Process Facts(see attached Staff Report for the hearing date of April 15, 2021, incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of April 15,2021, incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of April 15,2021,incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use Planning Act of 1975,"codified at Chapter 65,Title 67, Idaho Code(I.C. §67-6503). 2. The Meridian Planning&Zoning Commission takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has,by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian,which was adopted April 19,2011,Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s)received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. 6. That the City has granted an order of approval in accordance with this decision,which shall be signed by the Chairman of the Commission and City Clerk and then a copy served by the Clerk CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S).PINE 43 APARTMENTS—MCU-2021-0002 Page 1 Item 4. 59 upon the applicant,the Planning Department,the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the conditions of approval in the attached staff report for the hearing date of April 15,2021, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the Planning & Zoning Commission's authority as provided in Meridian City Code § 11- 5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for conditional use permit modification is hereby approved in accord with the conditions of approval in the staff report for the hearing date of April 15, 2021, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Two(2)Year Conditional Use Permit Duration Please take notice that the conditional use permit,when granted, shall be valid for a maximum period of two(2)years unless otherwise approved by the City in accord with UDC 11-513-6F.1. During this time,the applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval, and acquire building permits and commence construction of permanent footings or structures on or in the ground. For conditional use permits that also require platting,the final plat must be signed by the City Engineer within this two(2)year period in accord with UDC 11-5B-6F.2. Upon written request and filed by the applicant prior to the termination of the period in accord with 11-5B-6.F.1,the Director may authorize a single extension of the time to commence the use not to exceed one(1)two (2)year period.Additional time extensions up to two (2)years as determined and approved by the Commission may be granted. With all extensions,the Director or Commission may require the conditional use comply with the current provisions of Meridian City Code Title 11. E. Notice of Final Action and Right to Regulatory Takings Analysis 1. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight(28)days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67,Idaho Code. F. Attached: Staff report for the hearing date of April 15,2021 CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S).PINE 43 APARTMENTS—MCU-2021-0002 Page 2 Item 4. 60 By action of the Planning&Zoning Commission at its regular meeting held on the 6th day of May ,2021. COMMISSIONER RHONDA MCCARVEL, CHAIRMAN VOTED COMMISSIONER ANDREW SEAL,VICE CHAIRMAN VOTED COMMISSIONER LISA HOLLAND VOTED COMMISSIONER STEVEN YEARSLEY VOTED COMMISSIONER WILLIAM CASSINELLI VOTED COMMISSIONER NICK GROVE VOTED COMMISSIONER MARIA LORCHER VOTED Rhonda McCarvel, Chairman Attest: Chris Johnson, City Clerk Copy served upon the Applicant, the Planning and Development Services divisions of the Community Development Department,the Public Works Department and the City Attorney. By: Dated: 5-6-2021 City Clerk's Office CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S).PINE 43 APARTMENTS—MCU-2021-0002 Page 3 Item 4. ■ EXHIBIT A C� E IDIAN�-- STAFF REPORT f D A H 0 COMMUNITY DEVELOPMENT DEPARTMENT HEARING 4/15/2021 Legend 0 DATE: + Proleot Lflcfltor TO: Planning&Zoning Commission FROM: Sonya Allen,Associate Planner -- 208-884-5533 SUBJECT: MCU-2021-0002 i Pine 43 Apartments—MCU I LOCATION: 2255 E. Fairview Ave., in the NW 1/4 of Section 8,T.3N.,R.IE. I. PROJECT DESCRIPTION Modification to the previously approved Conditional Use Permit(H-2018-0001)to revise the site layout for the northeast 11.22-acre portion of the development to include a consolidation of common open space into more usable areas,the addition of a clubhouse and other amenities, and a change to the mix of unit types within the development. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 11.22(site);26.17 acres(overall) Future Land Use Designation Mixed Use Community(MU-C) Existing Land Use Multi-family development in the development process (apartments) Proposed Land Use(s) Multi-family residential Current Zoning R-40 High-Density Residential Physical Features(waterways, The Jackson Drain runs along the southern boundary and hazards,flood plain,hillside) the Settler's Canal bisects this site Neighborhood meeting date;#of 2/8/21; 1 attendee attendees: History(previous approvals) H-2017-0058(Pine 43 DA Inst. #2018-000751);H-2018- 0001 (Pine 43 Apartments—CUP);A-2018-0054(Property Boundary Adjustment);A-2020-0143 (CZC,DES for 1 St phase);FP-2021-0006 Page 1 1 1 1 Milli a-c ■::■ - - 1 • - ■X■Ell uu111 l .III '� v Iluml _ p 1 w —FAI 1ylIEW . . FiAI VIEW �/ ■ -� ,{� �;•r�1 �- it �AI.1 � " .��•s.,•1 i Ilhu5ml �- -X11,1,11:5 Y 'I 1 1 1 1 I I I I 1 I.II IIIIN�•2_■ • 1.111.1.' 1■�! ■--■ ::b 4 • ul lul lii�i ii ON ON ulullll11111 N + ■ I� .11111 � # ' .1 � +II II II IIII IIII III * 1111111 Ell 10 NEW Enn ■_ i II111151-11 •• 5 Mill " SI Ii�7111111 i 1 1 ufy. �;E�III I�1-'��"""L�I■ = NNE y■ �NII � h� . 1 1 , . , Item 4. F63 EXHIBIT A C. Representative: Patrick Boel, Roundhouse— 1109 W. Main St., Ste. 390,Boise, ID 83702 IV. NOTICING Planning&Zoning Posting Date Newspaper Notification 3/26/2021 Radius notification mailed to 3/24/2021 properties within 300 feet Site Posting Date 4/1/2021 Next Door posting 3/24/2021 V. STAFF ANALYSIS The existing Conditional Use Permit(H-2018-0001)approved for the overall site is for a 480-unit multi-family development on 27.48-acres of land in the R-40 zoning district. This application proposes to update the site layout on the northeast 11.22-acres to include a consolidation of common open space into more usable areas,the addition of a 1-story 7,047 square foot(s.£)clubhouse and other amenities, and a change to the mix of unit types within the development.No changes are proposed to the number of residential units or structures. Unit Types: The approved plan was for 240-units in ten(10) structures consisting of(60) 1-bedroom units, (120)2-bedroom units and(60) 3-bedroom units. The proposed plan is also for 240-units consisting of(80) 1-bedroom units, (110)2-bedroom units and(50) 3-bedroom units,which provides a better mix of unit types available for rent. Common Open Space: The approved plan required 66,800 square feet(s.f.) of common open space and proposed 87,224 s.f. The proposed plan requires 65,000 s.f. based on 190-units containing between 500-1,200 s.f. of living area and 50-units in excess of 1,200 s.f. and proposes 118,363 s.£,in excess of UDC standards. The proposed change results in an increase in common open space of 31,139 s.f. (or 0.71-acre)and consolidated common areas for better use. Amenities: Site amenities approved for this phase consisted of a fitness building and/or sports court/play equipment and plaza, and community grill areas with park style charcoal grills with an optional shade structure or cover dispersed throughout the development. Proposed amenities consist of a clubhouse, swimming pool with recreation deck and two (2) spas, BBQ deck, covered outdoor seating and beach volleyball court in the common area along Webb Way; and a dog run&dog wash, playground structure and community garden on the eastern portion of the development. Details of the proposed amenities should be submitted with the Certificate of Zoning Compliance application. The proposed changes result in more and a higher quality of amenities for the development. Off-Street Vehicle&Bicycle Parking: The approved plan required 450 vehicle spaces (210 covered)and provided 462 spaces (245 in covered carports and garages)for the residential units. The proposed plan requires 440 vehicle spaces(200 covered) for the residential units and 14 spaces for the clubhouse for a total of 454 spaces; and provides 462 spaces(248 in covered carports)in excess of UDC standards. Garages were originally proposed along the east boundary of the site which provided a buffer between the residential structures and the adjacent industrial uses to the east but have now Page 3 Item 4. F64 EXHIBIT A been changed to carports. This change should ultimately provide more needed parking for the development since some garages are typically used for storage and not parking; however, it will not provide a needed buffer between the different uses.The interface between the proposed residential uses and existing industrial uses was a topic of discussion and concern at the public hearing for the original conditional use permit. Therefore, Staff recommends a 6-foot tall closed vision/solid fence is installed along the east boundary with a fairly dense landscape buffer,as proposed. The approved plan required and proposed 20 bicycle parking spaces. The proposed plan requires 19 and provides 20 spaces in excess of UDC standards. Bicycle parking is required to comply with the standards listed in UDC 11-3C-5C. Specific Use Standards: The proposed multi-family development is subject to the specific use standards listed in UDC 11-4-3-27,Multi-Family Development. Plans submitted with the Certificate of Zoning Compliance application should demonstrate compliance with these standards and those in the development agreement rL-2017-0058(Pine 43 DA Inst. #2018-000751)]. Landscaping: Landscaping proposed for the site is depicted on the landscape plan in Section VII.D. Street buffers and parkways are required to be landscaped in accord with the standards listed in UDC 11-3B-7C. Internal common open space areas are required to be landscaped in accord with the standards listed in UDC 11-3G-3E. Parking lot and perimeter landscaping is required per the standards listed in UDC 11-3B-8C. Landscaping is required along all pathways in accord with the standards listed in UDC 11-3B-12C. Fairly dense landscaping(approximately 1 tree per 25-linear feet)is proposed in the perimeter buffer along the eastern boundary of the site adjacent to parking and industrial uses to the east. Staff recommends a mix of evergreen and deciduous trees,shrubs,lawn or other vegetative groundcover is provided in the buffer accord with the standards listed in UDC 11-3B-9C.1. Mitigation is required for any existing trees removed from the site per the standards listed in UDC 11- 3B-IOCS; the landscape plan in Section VII.D depicts the existing trees proposed for removal. Prior to removal of any trees from the site,coordinate with Matt Perkins,City Arborist,to determine mitigation requirements(208-371-1755). Calculations should be included on the plan demonstrating compliance with UDC mitigation standards. Pathways: A 10-foot wide multi-use pathway is proposed within the street buffer along N. Webb Way ang along the north side of the Jackson Drain, in accord with the Pathways Master Plan. 5. A public pedestrian easement is required to be submitted for the multi-use pathway along N. Webb Way prior to issuance of the first Certificate of Occupancy for the site. If the pathway is in the right-of- way, it should be covered under a pedestrian easement with ACHD. Pedestrian connections should be provided between buildings in the form of pathways distinguished from vehicular driving surfaces through the use of pavers,colored or scored concrete,or bricks in accord with the Development Agreement(provision#5.1.4b). Pathway/sidewalk connections should also be provided to the main building entrances along N. Webb Way from the multi-use pathway along N.Webb Way. Fencing: All fencing is required to comply with the standards listed in UDC 11-3A-7. The Applicant states there is existing fencing along the project's east boundary that consists of a combination of chain-link and barbed wire;no fencing is proposed. Because the garages have been removed from the plan that were previously proposed along the project's eastern boundary, Staff recommends a 6-foot tall closed vision/solid fence is provided along the eastern boundary,with landscaping as depicted on the landscape plan(approximately one tree per 25-linear feet and a mix of evergreen& deciduous trees),as a buffer. Page 4 Item 4. F65 EXHIBIT A Stormwater: An adequate storm drainage system shall be required in all developments in accord with the City's adopted standards, specifications and ordinances. Design and construction shall follow Best Management Practice as adopted by the City. There are some above-ground retention areas proposed along the eastern and southern boundaries of the site for stormwater management as depicted on the landscape plan in Section VII.D. Waterways/Ditches: There is an existing irrigation ditch(Settler's Canal)that runs east/west across this site that is proposed to be relocated and piped in alignment with the new entry driveway via N. Webb Way in accord with UDC 11-3A-6. Buildings and trees should not be located within the easement/piped area. Ownership&Maintenance: The first phase(i.e. Jasper Apartments) and proposed second phase of development will have shared ownership and amenities for the overall development. The clubhouse proposed in this phase is sized to accommodate users from both phases. A pedestrian bridge will link the projects internally. Staff recommends both phases are under the same management company for consistent maintenance of the overall development. Building Elevations: Conceptual building elevations and perspective drawings were submitted for the proposed 3-story multi-family structures and the single-story clubhouse as shown in Section VII.F. Building materials for the residential structures consist of a mix of horizontal&vertical fiber cement board/batten siding with gable roofs and asphalt shingles;three primary color schemes are proposed for variety. Building materials for the clubhouse consist of vertical metal siding with vertical wood cladding, glazing, dimensional wood slat accents, a gable roof and metal roofing. Prefabricated steel siding is only allowed to be used as an accent material per the development agreement(see definition on pg.E-5 of the Architectural Standards Manual and#R5.1E)— revisions should be made to comply.Additionally,per the DA, exterior building walls should demonstrate the appearance of high-quality materials of stone,brick,wood, or other native materials (acceptable materials include tinted or textured masonry block,textured masonry block,textured architectural coated concrete panels, or stucco or stucco-like synthetic materials—smooth faced concrete block,tilt-up concrete panels, or prefabricated steel panels are prohibited except as accent materials. The building design shall incorporate at least two(2) changes in one or a combination of the following: color,texture and materials. Rooflines shall demonstrate two(2)or more of the following: overhanging eaves, sloped roofs with two or more roof planes, flat roofs with varying parapet heights, or cornices. Administrative Design Review of the proposed structures is required.All structures shall comply with the design standards listed in the Architectural Standards Manual. The elevations submitted with this application are not approved and will likely require further modifications to comply with design standards.Per the Architectural Standards Manual(ASM), architectural elements should be provided to clearly distinguish between the ground level and upper stories(ASM Goal#R3.IE);visually heavier and more massive elements or materials should be provided at the base of buildings with lighter elements and materials above(#R3.1F); horizontal and vertical elements should be integrated into facades to break up monotonous wall planes(#R3.20);25%or more of the non-roof surface area of the clubhouse(i.e. accessory structure)must utilize a like material of the primary structures(#R3.3B); locate focal points as key elements within the building design to enhance architectural character(#R4.20); incorporate a trim color and an accent color or unique material into the color scheme as integrated details of the building design(#R.5.2A); modulate and articulate roof form of the clubhouse to create building profile interest and to reduce the appearance of building mass and scale(#R3.4). The elevations in the first phase of the multi-family development lying directly to the southwest of this site(i.e. Jasper Apartments) are a different architectural style(flat roofs with parapets and more of a modern style—see Section VILE) and color palette but the proposed structures incorporate Page 5 Item 4. F66 EXHIBIT A several orientations of fiber cement board siding which assist in unifying the structures. The Applicant anticipates the existing structures will be re-painted in the future to coincide with the proposed color scheme. While different architecturally, Staff feels the similar use of materials and colors will offer variety within the development. Wayfinding signage and clear addressing should be provided on buildings for emergency responders; coordinate with Joe Bongiorno,Fire Dept. and Terri Ricks,Land Development. The Applicant should coordinate with the Police Dept. on emergency access for the secured buildings. Certificate of Zoning Compliance/Design Review: A Certificate of Zoning Compliance and Design Review application(s)is required to be submitted for the proposed use prior to submittal of building permit applications to ensure consistency with the provisions in the development agreement, conditions in Section VIII,UDC standards and design standards in the Architectural Standards Manual. VI. DECISION A. Staff: Staff finds the proposed changes result in more diversity in rental options, larger and more consolidated/usable common open space areas and a higher quality and more site amenities. Therefore, Staff recommends approval of the proposed conditional use permit modification with the conditions included in Section VIII per the Findings in Section IX. B. The Meridian Planning&Zoning Commission heard this item on April 15,2021.At the public hearing.the Commission moved to approve the subject MCU request. 1. Summary of the Commission public hearing: a. In favor: Gary Sorensen,Applicant's Representative b. In opposition:None c. Commenting: None d. Written testimony: Brian Wenzel,Applicant's Representative e. Staff presenting application: Sonya Allen f. Other Staff commenting on application:None 2. Key issue(s)of public testimony: a. None 3. Key issue(s)of discussion by Commission: a. In favor of the proposed change from garages to carports as it will provide more parking for the development and the increase in common open space area and amenities. 4. Commission change(s)to Staff recommendation: a. None Page 6 Item 4. F67 EXHIBIT A VII. EXHIBITS A. Approved Site Plan(dated: 1/5/2018) - PERIGN 549ATINJ WE CMTA 160' f Lam.JI `,`.� ••'+ Bl COMAAEA r 9PEMmEPAZE IS Imp- r . it I SffE DEYaQPMEYi.1M3JfTEE . r �_ - L — J' F - _DUiEzrK-YEOHQTS if r f LECEhb �SffE P.AIJ•FNAbE2 �:•• 1 I I _+���� _ ^.,,��J I o.,.... - .e.. .9..'.' Page 7 Item 4. F68 EXHIBIT A B. Proposed Site Plan(dated: 2/23/2021) 0�O �5! IV =r� 2 F� ' .`• 1 134{ y i35Wd-SLM3WLVVdV EV3Nld - IL ;NOLL7f1ll15N0}71Q!101�IMaLLtl71dI00W LW713d 3Sf1lhH01110N0} 77, rXJ I };. ..... �•ka off •�I = �. LLLZ I-� _......................................................................................................................................................... Page 8 Item 4. F69 EXHIBIT A C. Approved Landscape Plan&Open Space Plan(dated: 1/5/2018) GENERAL BHEETMOTEB i -- FE 6XER PERIC* LEG=yo SANATIRJ - W GEMERAL SHEETMQTEB J - .. W -.... few i74 I +�- - • _ _ 44lIdITwLedYW2 h r � U:y :uuuuu� c I SHEET KEYED MOTES T IllIryryryry,,,, � 4 `� ✓1:� I � LEOEM -- i II . R,r II I R/N 'Al' PLVIfIMfl PLANj AS TREE PR4TEC7I0H —C.UP2 2 Page 9 Item 4. F70] EXHIBIT A 8 T E OhTA y sew— �EN1[E$ _pE$ICH eu LOIMI.AREA SAIATIN� OPEN 2PhCE aT Ai�a1�_ r C 3F==T NEYEO FODYEE ,00p II: C I M-� LEGEND fJ. mIImTIfQI1QID'IIIIIiDI�L'�IIl`� �II I �- _y_'_______-_____ --- h1 LPEM 3PhLE 3�F 4L+ I CUP1.3 Page 10 ' ••• • • . • ' • T MWOM' MITORWIMEMKIIIIIII IIr _ 1 1 ■ r 4 i �p o � ■ I�Fk�y � LEAop V i f L_ - ■ `ir Item 4. F72 EXHIBIT A (D 07 u 953'Hd�S1N9W101'�'d'�'FF3HId + _ � � Tifi�,fF-13€,K9u53�11r3Wd4T3h34 HF]�€i4 all - , I Icy I I I � Jf E I � e � 1 t j I H Ulm a w Page 12 Item 4. F73 EXHIBIT A as ! e 'n DAM LIP I`�' ,=a �,;,;u ro 11 3WHd-51N3V9AVdV E9 3 N Id d TUN/F.-135 AMIAR 1N3Wd013A30 N91S30 0 O—F1- t � I,I � i; i i l l __• 3 - Ys'l�9ii6 ' l3�ai�lsli6 � r a 00 O �: IN I�iEin�9a =F:i�see:ie�:�s! a Og �li:Ei!1Fe:fll8l8FiE�ig��3E •, r ,,f � � > � i--- - - - ' 7 J L- -"•� d J l\ � - o _ a Page 13 Item 4. F74 EXHIBIT A /Ny j YBg �S Y g gg uN7 - /n�� ff 2 ¢F�lLL� ' 113SVMd•S1N3W1WdVE73NI4 ; g LZ�tC�fi-135 M31R3k!1N 3 NIdOl3R39 N91539 o � r — e T° p•Sk y � 1 f I!E 1 I EE1e1eI �l+ i Me �!Fleig�6i ff 1 '- �a o c I NI _ — f E it .1lt. a a'� i � � n 9 i LLJ '- -------1 — f Ii, m d J N U 4 10�0�0��i410 01141I O IIIIC y `w Page 14 — Item 4. F75 EXHIBIT A ------------------------------------------------------------------------------------------------------------------------------------------- 1135tlHd•S1N3W111tldtlE43Nld � g T4WE—13S M431AR IN 3 M013AK WNS30 1 o . alEr il�o p yr�ilE 1 I I�-. Ln sedtlsi9 3iiicsli:l6!'2�.1 a r OT B CY: y ❑ � � Q 5 s! -MM HISS.@SQ...2 O O b O o D Q � — e el I I I 5_ 0 b b �f I Q - —0 o~b LC "Qf Il ia I � b oa�4�Qlb 1b .l W Page 15 »m* F76 EXHIBIT ���` �' � , ,_H-SiN__V=,m ,Z/ZZ/wmmlAR aHmm___ - �m, |�q| � ;.. . || _ |i| |�. @dmmfi| \ e i!I )/ �| h� ■ gII'l -...'..||:|�.■. |•�:...;. � ¢ Hmmammmmm .i & \ � ) 2 , e . _ Z _ Wit • ° ° ° a - §� Page 16 EXHIBIT A m .................................................. .......................................................................................... -v PE NIP m -PON ij -------------.............. ----------- ..............I............ ............. ...... Page 17 Item 4. F78 EXHIBIT A [ CIA - U *Concept only—exact system to be determined in the future Page 18 EXHIBIT A El E. Approved Conceptual Building Elevations 000 FORKER PERICH SADATINJ - - -- �. ■r■ i... .. CONCEPT I Ru MULTIFAMILY lfR; lliiul�- I�1 � -Y Illiilil �l1�: Ili 1 �r y uwr.�i F ■ ti ■ Page 19 Item 4. F80 EXHIBIT A Elevations approved for construction in Phase 1: rEf(RER PERICN SA0ATINJ `° B "�'a.oa9 sus�e,,nur�oEm ous cl 13 �nw'°`i� __f6ra aJ9 1r�EJ'�llll['lYPE 2-F#PHER SSE o,sw� �18U1➢ING TYPE ® ® ® _ ® Ulm H O� o— �:o ® om a IL B1911tMINGlYPE2-FISR CZG SNBMPTTAL El El 13 El ® ® ® mar Aar :s .��g E%7HigR ® ELEVATIDlS pig ( T9N�lRGTYPE2-�K �. ,...�. ..�., ,...., CZC4.3 Page 20 Item 4. F81 EXHIBIT A F. Proposed Conceptual Building Elevations&Perspective Drawings for Multi-Family&Clubhouse Structures NOT APPROVED—SUBJECT TO DESIGN REVIEW APPROVAL VERT.FIRER DEMENTRDARDIRATTEN SIDING 2 TEMRES FOR NTEREST 5� ■ ■ ■ ■ ■ ?� ■ ■ ■ ■ ■ -- ------� a X-0 1.WEST(WEBB WAY)ELEVATION 2.S OUTH ELEVATION sraic i=m' ALUM.STOREFRONT va r.�= NNri��� PAINTED METAL AWNING PAINTED METAL DOWNSPODi AOPHPITSHINGLE ROOF PANTED METP1 RNLING VERT FBER CEMENT DOARDI BATTEN SIDING 2 RIZFIBE FDR INTEREST BOAR[WHIE C CONCRETE HORIZ.FIRER CEMEM IPP SIDING (YRIERE OCCDRS) 5F C J10 ° 3.EAST ELEVATION xmw.I 4.NORTH ELEVATION Ale= C 13 TYP.BUILDING(BUILDING 3)ELEVATIONS 04.06 21 Pine 43 Multifamily F'I.BS.i 11RndiagID RIVOT FORTH PNa JOB,,,-,.2 architecture uuM.s`oREFRONT VERnGALWOOD CLABDING VERTICAL AffTAL SIDING DIMENSICNALWOODSNTs METALSIGNAGE,SEE LAIM]SCAPE DRAWINGS I O 1.WEST(WEBB WAY)ELEVATION 2.SOUTH ELEVATION PNNTFI]METPIAWMING VERTICAL WDDD CIAOOING METAL ROOF Aluu sToBEFRONT N� 3.EAST ELEVATION 4.NORTH ELEVATION(POOL DECK) �Ir RFraIaN - - O 14 AMENITY BUILDING ELEVATIONS wNy�nz� Pine 43 Multifamily Pint Subdivision,Mandian,ID PIVOT FORTH PNa JOB ft 20-052 architecture Page 21 Item 4. F82] EXHIBIT A i r w VIEW 1 AERIAL LOOKING EAST FROM WEBS WAY 6 NBYPlaV1 -" �] 07 PERSPECTIVE VIEWS o-a.os.zari Pine 43 Multifamily Pine Subdivision,Mendian,ID PIVOT NORTH PNa J DB#24052 arci�itect a re f MIL. - . }; - Will LOOKINGNE TOLMEPIl BUILDING n PERSPECTIVE VIEWS Pine 43 Multifamily PIVOT NORTH Page 22 Item 4. F83 EXHIBIT A ri VkY11,LO0pNO EAST TO VEHICUURENTRY FROM WEBS WAY09 S PERSPECTIVE VIEWS Pine 43 Multifamily Poe3W3 w MrnAn I° PIVOT FORTH PNa JCQk�OMS archltzcture do VIE W L LO II SECONOAKY OPEN SPACE PERSPECTIVE VIEWS Pine 43 Multifamily �;10 i— e1 w ID PIVOT NORTH e�cNitecL��e r � _ VIEWS.LOOKING NOUN TO AMEN"POOL DECK Li Q PERSPECTIVE VIEWS Pine 43 Multifamily PI..Subd .mend. PIVOT FORTH PNa JOB k2 52 arcM1itecture Page 23 Item 4. F84 EXHIBIT A Potential Color Schemes: NOTE.COLOR SCHEME SHOWS ARTISTS INTERPRETATION OF POTENTIAL COLOR PALATTE.POTENTIAL RECOLORING OF PHASE 1 WILL BE REVIEWED WITH CITY ■ ■ ■ ■ i 11 PINE 43 PHASE 4 COLOR 1 PINE 43 PHASE 4 COLOR 2 I� 9 i PINE 43 PHASE 1 EXISTING BUILDING PINE 43 PHASE 1-EXISTING BUILDING 1 El i PINE 43 PHASE 1-BUILDING 2 E - I POTENTIAL RE-COLOR INOOF PHASE 1(JASPER APARTMENYS) PINE 43 PHASE I-BUILDING 1 TO MORE-CLOSELY ALIGN Wild PROPOSED PHASE 4 PROJECT USE SIMILAR COLORS IN DISTINCT WAYS FOR COHESIVE ALIGNMENT 04 ELEVATION CONCEPT-PHASE 1 FIELD OCLOR OF PHASE 4 BECOMES ACCFJR DF PHASE I,VICE VERSA 61.Q92Q21 Pine 43 Multifamily Pine Subdivision,Meridian,ID PINE 43 PHASE I COLOR STUDY RIVOT NORTH 'Na JOB#20-052 arch itectu ne Page 24 Item 4. F85] EXHIBIT A VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING 1. All future development shall comply with the provisions in the existing Development Agreement(Inst. #2018-000751),preliminary plat(H-2017-0058), final plat(FP-2021-0006) and the site/landscape plan, including amenities, submitted with this application and with the associated conditions of approval contained herein. 2. The site/landscape plan submitted with the Certificate of Zoning Compliance application shall include the following: a. Demonstrate compliance with the specific use standards listed in UDC 11-4-3-27 Multi- Family Development, as follows: (1) All on-site service areas, outdoor storage areas,waste storage, disposal facilities, and transformer and utility vaults shall be depicted on the plan and be located in areas not visible from a public street,or shall be fully screened from view from a public street as set forth in UDC 11-4-3-27B.2. (2) Depict the location of the property management office,maintenance storage area, a central mailbox location(including provisions for parcel mail)that provide safe pedestrian and/or vehicle access, and a directory and map of the development at an entrance or convenient location for those entering the development. (3) Depict landscaping along the foundations of all street facing elevations as set forth in UDC 11-4-3-27E.2, as follows: the landscaped area shall be at least 3-feet wide and have an evergreen shrub with a minimum mature height of 24 inches for every 3 linear feet of foundation. The remainder of the area shall be landscaped with ground cover plants. b. Depict landscaping along the multi-use pathways along N. Webb Way and the Jackson Drain in accord with the standards listed in UDC 11-3B-12C. c. Depict pedestrian connections between buildings in the form of pathways distinguished from vehicular driving surfaces through the use of pavers,colored or scored concrete,or bricks in accord with the Development Agreement(provision#5.1.4b). d. Depict pathway/sidewalk connections to the main building entrances along N. Webb Way from the multi-use pathway along N. Webb Way. e. Include mitigation information for the existing trees being removed from the site in accord with the standards listed in UDC 11-3B-I005. Coordinate with Matt Perkins, City Arborist,to determine mitigation requirements (208-371-1755). £ Depict the boundary of the minimum 20-foot wide street buffer(future common lot) along N. Webb Way,measured from back of curb,to ensure compliance with building setback requirements. g. Include a calculations table that demonstrates compliance with the landscape standards listed in UDC 11-3B-7C(street buffer/parkway), 11-3B-8C(parking lot), 11-3B-12C (pathway), and 11-3G-3E(common open space). h. Parkways planted with Class II trees shall be a minimum of 8-feet wide(Class II trees are preferred) as set forth in UDC 11-3A-17E. If less than 8-feet wide,root barriers shall be constructed. i. Depict all stormwater retention areas on the plan. Page 25 Item 4. F86 EXHIBIT A j. Depict 6-foot tall closed vision/solid fencing along the project's eastern boundary. k. Include details for the playground equipment,BBQ's,covered seating area(s), community garden and dog wash facilities. 1. Depict landscaping within the perimeter buffer along the eastern boundary of the site as proposed(i.e. a minimum density of one tree per 25-linear feet).A mix of evergreen and deciduous trees, shrubs,lawn or other vegetative groundcover shall be provided in accord with the standards listed in UDC 11-3B-9C. 3. Submit floor plans for the units with the Certificate of Zoning Compliance application that demonstrate compliance with the private usable open space requirements in UDC 11-4-3- 27B.3 (a minimum of 80 square feet is required for each unit). 4. The Settler's Canal shall be piped as proposed in accord with UDC 11-3A-613. 5. Submit a public pedestrian easement to the Planning Division in accord with Park's Department requirements for the multi-use pathway along N. Webb Way prior to issuance of the first Certificate of Occupancy for the site.If the pathway is in the right-of-way, it should be covered under a pedestrian easement with ACHD. 6. The development is required to record legally binding documents that state the maintenance and ownership responsibilities for the management of the development,including,but not limited to, structures,parking, common areas, and other development features as set forth in UDC 11-4-3-27F; submit a copy of this recorded document to the Planning Division with the first Certificate of Zoning Compliance application. 7. Compliance with the qualified open space and site amenity standards listed in UDC 11-3G-3 and 11-4-3-27 is required. Plans submitted with the Certificate of Zoning Compliance application shall demonstrate compliance with these standards and be consistent with those proposed with this application. 8. Phases I and 11 shall be managed by the same company to ensure consistent maintenance of the overall site. 9. Wayfinding signage and clear addressing shall be provided on buildings for emergency responders. Coordinate with Joe Bongiorno, Fire Dept. and Terri Ricks,Land Development. 10. Coordinate with the Police Dept. on emergency access to the secured buildings. 11. The subject property shall be subdivided prior to submittal of any building permit applications for structures on this site. 12. All future structures shall comply with the design standards in the Architectural Standards Manual and in the Development Agreement. Exterior building walls should demonstrate the appearance of high-quality materials of stone, brick, wood, or other native materials (acceptable materials include tinted or textured masonry block, textured masonry block, textured architectural coated concrete panels, or stucco or stucco-like synthetic materials — smooth faced concrete block, tilt-up concrete panels, or pre-fabricated steel panels are prohibited except as accent materials as set forth in the Development Agreement (provision #5.1.4h). See notes in Section V under Building Elevations. 13. A Certificate of Zoning Compliance(CZC)application shall be submitted and approved for the proposed use prior to submittal of a building permit application. An Administrative Design Review application shall be submitted concurrently with the CZC application. Page 26 Item 4. F87 EXHIBIT A B. PUBLIC WORKS SITE SPECIFIC CONDITIONS 1. A manhole will be required at the 90-degree sewer bend in sewer located East of Building 7. 2. Sewer services are private and should not be within utility easements,remove the easement around the sewer service located North of Building 7. 3. Upsize the water line South of Building 7 to an 8" main and connect the Clubhouse water meter and fire line from that main extension. 4. Provide a water utility easement near the Southeast corner of Building 1 to the East property line for a future water connection to the East. C. ADA COUNTY HIGHWAY DISTRICT(ACHD) hgps://weblink.meridianciU.org/WebLink/DocView.aspx?id=223662&dbid=0&repo=MeridianC Lty D. NAMPA&MERIDIAN IRRIGATION DISTRICT(NMID) https://weblink.meridiancity.org/WebLink/Doc View.aspx?id=224331&dbid=0&repo=Meridian C hty E. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https://weblink.meridiancity.org/WebLink/Doc View.aspx?id=224004&dbid=0&repo=MeridianC Lty IX. FINDINGS Conditional Use(UDC 11-5B-6) Findings: The commission shall base its determination on the conditional use permit request upon the following: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The Commission finds the site is large enough to accommodate the proposed development and meet all dimensional and development regulations of the R-40 zoning district. 2. That the proposed use will be harmonious with the Meridian comprehensive plan and in accord with the requirements of this title. The Commission finds the proposed use will be harmonious with the Comprehensive Plan and is consistent with applicable UDC standards with the conditions noted in Section VIII of this report. 3. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The Commission finds the design, construction, operation and maintenance of the proposed use should be compatible with other uses in the general neighborhood, with the existing and intended character of the vicinity and will not adversely change the essential character of the area. 4. That the proposed use,if it complies with all conditions of the approval imposed,will not adversely affect other property in the vicinity. The Commission finds the proposed use will not adversely affect other properties in the vicinity if it complies with the conditions in Section VIII of this report. Page 27 Item 4. F88 EXHIBIT A 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal, water, and sewer. The Commission finds the proposed use will be served by essential public facilities and services as required. 6. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. The Commission finds the proposed use will not create additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. 7. That the proposed use will not involve activities or processes,materials, equipment and conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive production of traffic,noise, smoke, fumes, glare or odors. The Commission finds the proposed use will not be detrimental to any persons,property or the general welfare by the reasons noted above. 8. That the proposed use will not result in the destruction,loss or damage of a natural, scenic or historic feature considered to be of major importance. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005) The Commission finds the proposed use will not result in the destruction, loss or damage of any such features. 9. Additional findings for the alteration or extension of a nonconforming use: a. That the proposed nonconforming use does not encourage or set a precedent for additional nonconforming uses within the area; and, This finding is not applicable. b. That the proposed nonconforming use is developed to a similar or greater level of conformity with the development standards as set forth in this title as compared to the level of development of the surrounding properties. This finding is not applicable. Page 28