plant schedule picturesPLANT SCHEDULE
NUMBER QTY COMMON NAMES SCIENTIFIC NAME 3D
PERSPECTIVE
P01 4 AVALANCHE FEATHER REED GRASS CALAMAGROSTIS X ACUTIFLORA 'AVALANCHE'
P02 12 DWARF BLUE SPRUCE PINUS PUNGENS
P03 17 DWARF JAPANESE BARBERRY BERBERIS THUNBERGII ATROPURPUREA
P04 1 GIANT WEEPING SEQUOIA SEQUOIADENDRON GIGANTEUM 'PENDULUM'
P05 3 GOLDEN RUBY BARBERRY BERBERIS THUNBERGII 'GORUZAM’ PLAN 2’
P06 7 GOLDFLAME SPIREA SPIRAEA X BUMALDA ‘GOLDFLAME'
P07 13 NORTHERN LIGHTS TUFTED HAIR GRASS DESCHAMPSIA CESPITOSA 'NORTHERN LIGHTS'
P08 6 SILOAM GUMDROP DAYLILY HEMEROCALLIS X 'SILOAM GUMDROP'
P09 3 SPRING SNOW CRAPAPPLE MALUS X SPRING SNOW
P10 2 SUNSET MAPLE ACER SACCHARUN
P11 3 THUNDERCLOUD PLUM PRUNUS CERASIFERA 1/3 TREEHEIGHTWIDE NYLON WEBBING
ROOT CROWN AT
FINISH GRADE,
OR 1-2" ABOVE GRADE
2"x2" WOOD STAKE AT
OR BELOW GRADE
FINISH GRADE
TILLED OR BROKEN UP
SOIL MIN 12" DEEP
2" SETTLED LAYER OF MULCH
2X WIDTH OF
ROOTBALL
NOT TO SCALE
EVERGREEN TREE PLANTING
NOTES: EVERGREEN TREE PLANTING
1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH THE AMERICAN STANDARDS
FOR NURSERY STOCK (ANSI Z60.1-2004). PLANT ACCORDING TO ANSI A300 PART 6.
2. DIG THE PLANTING HOLE A MINIMUM OF 2x WIDTH OF ROOTBALL FOR AT LEAST THE
FIRST 12 INCHES OF DEPTH. BELOW 12 INCHES, DIG HOLE WIDE ENOUGH TO PERMIT
ADJUSTING. DO NOT DIG THE HOLE DEEPER THAN ROOT BALL DEPTH.
3. SCARIFY THE SUBGRADE AND SIDES OF THE PLANTING HOLE WHEN PLANTING IN CLAY
SOILS (MORE THAN 15% CLAY).
4. LIFT AND SET THE TREE BY ROOT BALL ONLY. DO NOT LIFT USING THE TREE TRUNK
AND DO NOT USE TREE TRUNK AS A LEVER.
5. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL SURFACE OR SLIGHTLY
HIGHER IF THE SOIL IS PRONE TO SETTLING.
6. AFTER THE TREE IS SET IN PLACE, REMOVE BURLAP, WIRE AND STRAPS FROM AT
LEAST THE UPPER 1/3 OF THE ROOTBALL.
7. BACKFILL WITH EXISTING SOIL THAT HAS BEEN WELL-TILLED OR BROKEN UP. DO NOT
ADD AMENDMENTS TO THE BACKFILL SOIL. AMEND THE SURFACE WITH MULCH.
8. USE THREE 2" X 2" WOOD STAKES DRIVEN INTO UNDISTURBED SOIL A MINIMUM OF 16
INCHES. SPACE STAKES EQUALLY AROUND THE TREE.
9. ATTACH 3/4" NYLON WEBBING TO CONNECT THE TREE TO STAKES. ATTACH WEBBING
AT 1/3 THE TREE HEIGHT.
10. APPLY A 2-3" (SETTLED) DEPTH OF PINE STRAW OR BARK MULCH TO THE PLANTING
SURFACE. LEAVE A 2" SPACE AROUND THE TRUNK FOR AIR CIRCULATION.
11. PRUNING SHALL BE LIMITED TO DEAD, DISEASED, OR BROKEN LIMBS ONLY AND SHALL
BE IN ACCORDANCE WITH ANSI A300 SPECIFICATIONS.
12. REMOVE ANY TRUNK WRAP REMAINING AT TIME OF PLANTING. NO WRAPS SHALL BE
PLACED ON TRUNK.
NOTES: TYPICAL SHURB PLANTING, INDIVIDUAL
PLANTING HOLE
1. DIG PLANTING HOLE AT LEAST 2X THE WIDTH OF
THE ROOT BALL OR CONTAINER.
2. SCARIFY SUBGRADE AND SIDES OF PLANTING
HOLE WHEN PLANTING IN CLAY SOIL.
3. SET THE TOP OF THE ROOT BALL LEVEL WITH
THE SOIL SURFACE, OR 1-2" ABOVE IF THE SOIL IS
PRONE TO SETTLING.
4. IF CONTAINER GROWN PLANT, GENTLY SLIDE
PLANT OUT OF CONTAINER. DISTURB THE ROOTS.
5. IF B&B PLANT, REMOVE BURLAP FROM AT LEAST
THE TOP 12 INCHES OF THE ROOTBALL, WITHOUT
DISTURBING THE ROOTBALL. REMOVE ALL CORD
FROM THE TRUNK. REMOVE BURLAP AND WIRE
BASKET (IF PRESENT) FROM THE ROOT BALL.
6. BACK FILL THE PLANTING HOLE WITH
EXCAVATED NATIVE SOIL, BROKEN UP OR TILLED.
WATER TO REMOVE AIR POCKETS. DO NOT ADD
AMENDMENTS.
7. PLACE PINE STRAW OR BARK MULCH ON THE
SURFACE TO A (SETTLED) DEPTH OF 1 TO 3
INCHES.
2X WIDTH OF
ROOTBALL
TYP. SHRUB PLANTING:
INDIVIDUAL PLANTING HOLE
NOT TO SCALE
ROOT CROWN TO BE
AT FINISH GRADE OR
1-2" ABOVE GRADE
FINISH GRADE TILLED OR BROKEN
UP SOIL MIN 12" DEEP
2" SETTLED
LAYER OF MULCH1/3 TREEHEIGHTFINISH GRADE
TREE PLANTING
NOT TO SCALE
2X WIDTH OF
ROOTBALL
2"x2" WOOD STAKE AT
OR BELOW GRADE
ROOT CROWN AT
FINISH GRADE,
OR 1-2" ABOVE GRADE
WIDE NYLON WEBBING
2" SETTLED LAYER OF MULCH
TILLED OR BROKEN UP
SOIL MIN 12" DEEP
NOTES: TREE PLANTING
1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH THE AMERICAN STANDARDS
FOR NURSERY STOCK (ANSI Z60.1-2004). PLANT ACCORDING TO ANSI A300 PART 6.
2. DIG THE PLANTING HOLE A MINIMUM OF 2x WIDTH OF ROOTBALL FOR AT LEAST THE
FIRST 12 INCHES OF DEPTH. BELOW 12 INCHES, DIG HOLE WIDE ENOUGH TO PERMIT
ADJUSTING. DO NOT DIG THE HOLE DEEPER THAN ROOT BALL DEPTH.
3. SCARIFY THE SUBGRADE AND SIDES OF THE PLANTING HOLE WHEN PLANTING IN CLAY
SOILS (MORE THAN 15% CLAY).
4. LIFT AND SET THE TREE BY ROOT BALL ONLY. DO NOT LIFT USING THE TREE TRUNK
AND DO NOT USE TREE TRUNK AS A LEVER.
5. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL SURFACE OR SLIGHTLY
HIGHER IF THE SOIL IS PRONE TO SETTLING.
6. AFTER THE TREE IS SET IN PLACE, REMOVE BURLAP, WIRE AND STRAPS FROM AT
LEAST THE UPPER 1/3 OF THE ROOTBALL.
7. BACKFILL WITH EXISTING SOIL THAT HAS BEEN WELL-TILLED OR BROKEN UP. DO NOT
ADD AMENDMENTS TO THE BACKFILL SOIL. AMEND THE SURFACE WITH MULCH.
8. USE THREE 2" X 2" WOOD STAKES DRIVEN INTO UNDISTURBED SOIL A MINIMUM OF 16
INCHES. SPACE STAKES EQUALLY AROUND THE TREE.
9. ATTACH 3/4" NYLON WEBBING TO CONNECT THE TREE TO STAKES. ATTACH WEBBING
AT 1/3 THE TREE HEIGHT.
10. APPLY A 2-3" (SETTLED) DEPTH OF PINE STRAW OR BARK MULCH TO THE PLANTING
SURFACE. LEAVE A 2" SPACE AROUND THE TRUNK FOR AIR CIRCULATION.
11. PRUNING SHALL BE LIMITED TO DEAD, DISEASED, OR BROKEN LIMBS ONLY AND SHALL
BE IN ACCORDANCE WITH ANSI A300 SPECIFICATIONS.
12. REMOVE ANY TRUNK WRAP REMAINING AT TIME OF PLANTING. NO WRAPS SHALL BE
PLACED ON TRUNK.