Loading...
itd lanscape permitDistrict 3 Right -of -Way Encroachment Permit Cover & Inspection Form BLOOD, LLC ATTN: DAViia BLOOD 629 E.LAKE CREEK ST. MERIDIAN ID 83642 PERMIT# 3-18-025 RouTE SH 69 MILE POINTS 8.53 EXPIRATION 7/20/2018 lTD FOREMAN CONTACT: Travis Dodd - Cell: 208-830-3607 / Office: 208-332-7162 travis.dodd@itd.idaho.gov Work Description: Landscape r/w ** For safety concerns during the August 2017 Eclipse; No work shall be done on ITD right-of-way between the dates of Friday August 18`h through Tuesday August 2Z" at midnight ** Important: Before you start • Read and understand the entire contents of this permit packet, contact the Idaho Transportation Department (ITD) with any questions prior to starting work. • This permit serves as a permit to construct. Failure to complete work as permitted and receive final inspection sign -off before the expiration date listed shall render permit void. • Supply a copy of this permit to your contractor(s) including your traffic control contractor. Contractors may be required to obtain separate permit by 1TD. • Submit Certification and Materials documentation 14 days in advance (see Certification and Materials in provisions) • All documentation submitted to ITD shall have the permit number clearly listed on the top of the page; email correspondence shall reference the permit number in the subject line. • Receive authorization to begin work by the ITD Foreman listed above. Email start date request a minimum 5 business days in advance. Do not start without authorization. If needed, request to meet on -site to review the project and permit requirements. Prior to completion: + Prepare all required documentation, including As -Built submittals (see As -Built Requirement in provisions) • Send a notification email to the ITD Foreman that work is complete and schedule to meet on -site for inspection, all documentation must be available for inspection and acceptance, list permit number on each sheet. Final Inspection (for ITD use only) ❑Yes ❑No Did permittee request and receive authorization to start work prior to working within ETD R/W? ❑Yes ❑No Did ITD receive notification that work is complete and request a meeting for inspection ❑Yes ❑No ITD accepts all required documentation ❑Yes ❑No Was excessive remediation required during any aspect of permitted work? if so, please document any time and equipment charged outside the normal inspection shift. Document: date, beginning and end time, dispatched or not and by whom, reason or situation, corrective action, with whom you spoke. Additional Notes: (use separate sheet if needed) �0 Do not sign until all documentation has been received! Is ITD's representative, I accept that the work completed satisfies the permit. ITD Authorized Representative Signature Date x Return this form with all required permit documentation to: ITD District 3 Traffic Your Safety . Your Mobility . Your Economic Opportunity District 3 Right -of -Way Encroachment General Provisions Permit #3-18-025 ITD Foreman contact: Travis Dodd - Cell: 208-830-3607 / Office: 208-332-7162 travis.dodd@itd.idaho.gov Temporary Traffic Control (TTC) No work within the State right-of-way shall commence until a TTC plan has been submitted and accepted by ITD. TTC must be erected and maintained to meet: District 3 Operational Procedures 'Traffic Control for Encroachment Permits", M.U.T.C.D and Work Zone Safety and Mobility program as adopted by the State of Idaho. TTC plan must be on -site and available for inspection during traffic control erection and all construction activities. ❑Yes District 3 has accepted a TTC plan with the issuance of this permit as attached. ZNo a plan must be submitted and accepted prior to any work within ITD right-of-way. Travel Way Restrictions and Special Instruction: ** For safety concerns during the August 2017 Eclipse; No work shall be done on ITD right-of-way between the dates of Frida August 18`h through Tuesday August 22°d at midnight ** No travel way restrictions are authorized for this permit. Work time to be authorized by area Foreman Notes or Special Conditions : Hours may be modified by area Foreman, ITD contract or Authorized representative. 511. Traveler Information email ITDD3-511ReportNotification@itd.idaho.goy , (cc) the Foreman and itdd3permitsPitdJdaho.gov Include in subject line ITD permit #, inform of: dates of work, start time, end time, route affected, mile points, direction of travel for lane closure, type of traffic control, additional comments. Safety & Work Zone Practices All operations shall comply with the Work Zone Safety and Mobility program as adopted by the State of Idaho, (OSHA) regulations as enacted by The United States Department of Labor Occupational Safety and Health Administration, and ITD Policy (23 CFR § 634 — Worker Visibility) All workers within the highway right-of-way who may be exposed either to traffic (vehicles using the highway for purposes of travel) or to construction equipment within the work area shall wear high -visibility reflectorized safety apparel that is intended to provide conspicuity during both daytime and nighttime usage, and meets the Performance Class 2 or 3 requirements of the ANS111SEA 107- 2004 publication. As -Built drawings Subject to all ITD encroachment permits - shall apply when work consists of the exposure, installation, or modification of pipe, conduit, cable, or other utility conveyance. Overhead utilities will he excluded from this requirement; except for new pole or structure placement. As -built submittals must satisfy the following requirements: the precise location, referenced from the highway centerline or edge of right-of-way, where any utility is placed, or encountered during placement. Document: the type, quantity, size; referenced from the highway centerline or the edge of right-of-way, dimension horizontal, vertical and/or depth. Submittals may be accepted from: (GIS) geo-referenced spatial data bore logs, drawn/sketched, or prepared as -constructed stamped by a licensed engineer. Drawn/sketched sheets should be as "plan and profile" format. Other methods may be accepted with ITD prior authorization. Compaction effort and method must be documented for work outside the roadway prism. (see: Excavation and Paving for compaction requirements) Expeditious Prior to beginning construction, sufficient labor, material and equipment shall be at the job site to expediently complete the project. Addendums Any addendum "change order, alteration or modification" to this permit or any of its terms or conditions, must be authorized and signed by an ITD authorized representative. Addendum shall be on -site and available for inspection (with original permit) during construction activities. Addendum will be filed on record along with permit at ITD District 3 Traffic Department. Rev. 12-2016 Your Safety . Your Mobility . Your Economic Opportunity Damages The Permittee shall be responsible for damages caused during permit activity and must be reported to the area Foreman immediately. Repairs shall be made by the permittee as directed by the ITD authorized representative at no cost to the Department_ If the permittee falls to make the necessary repairs, the Department will make the repairs and bill the permittee. No new permits shall be issued to the permittee until such claims have been settled. Monuments Idaho Statute 54-1234 If any person shall willfully deface, injure or remove any signal, monument, building or other object set as a permanent boundary survey marker by a registered, professional land surveyor, he shall forfeit a sum not exceeding five hundred dollars ($500) for each offense, and shall be liable for damages sustained by the affected parties in consequence of such defacing, injury or removal, to be recovered in a civil action in any court of competent jurisdiction. Idaho Statute 18-7021 Every person, not the owner thereof, who willfully mars, disfigures breaks or otherwise injures, or molests, removes or destroys, any work of art, monument, landmark, historic structure, shade tree, shrub, ornamental plant, or useful or ornamental improvement, is guilty of a misdemeanor. Landscaping The permit holder shall return to original condition and re -seed all areas disturbed. Repair of landscaping shall be the responsibility of the permittee. The State will not be responsible for or participate in any repair or maintenance costs. Berms and/or fences will not be permitted. Only flowers, grasses and shrubs with a mature height not to exceed three (3) feet or trimmed with no sight obstructions between three (3) feet to five (5) feet in areas with a posted speed limit of 35 M.P.H or less, and three (3) feet to seven (7) feet in areas with a posted speed limit above 35 M.P.H. will be allowed within the sight triangle at corners and the safety clear zone of the State Highway. Landscaping shall be short enough or trimmed so it doesn't interfere with State Highway signs. No rocks over four (4) inches maximum size will be allowed within the State Highway right of way. Sprinkler heads shall be no closer than five (5) feet from the pavement edge and shall be adjusted so as not to cause water to cover any part of the highway surface. Landscaping shall be placed so as not to disturb the normal drainage patterns within the State Highway Right of Way. 1DAPA Rule 39.03.42, # 13. Drainage, B, Landscaping irrigation systems shall not disturb, obstruct, or add to the normal drainage patterns of the State highway right-of-way. No new ditches shall be constructed without prior approval. Landscaping, farming, and irrigation systems shall not interfere with utility installations, removals, or operations_ This section intentionally left blank Rev. 12-2016 SPECIAL PROVISION 6 LANDSCAPING Berms and/or fences will not be permitted within the State Highway Right of Way. Only flowers, grasses and shrubs with a mature height not to exceed three (3) feet or trimmed with no sight obstructions between three (3) feet to five (5) feet in areas with a posted speed limit of 35 M.P.H or less, and three (3) feet to seven (7) feet in areas with a posted speed limit above 35 M.P.H. will be allowed within the sight triangle at corners and the safety clear zone of the State Highway. Landscaping shall be short enough or trimmed so it doesn't interfere with State Highway signs. No rocks over four (4) inches maximum size will be allowed within the State Highway right of way. Sprinkler heads shall he no closer than five (5) feet from the pavement edge and shall be adjusted so as not to cause water to cover any part of the highway surface. Landscaping shall be placed so as not to disturb the normal drainage patterns within the State Highway Right of Way. IDAPA Rule 39.03.42, ff 13. Drainage, B Landscaping irrigation systems shall not disturb, obstruct, or add to the normal drainage patterns of the State highway right-of-way. No new ditches shall be constructed without prior approval. Landscaping, farming, and irrigation systems shall not interfere with utility installations, removals, or operations. The permit holder shall return to original condition and re -seed all areas disturbed, by their construction within the State Highway Right of Way, to the satisfaction of the District Engineer. Repair of landscaping shall be the responsibility of the perrnittee. The State will not be responsible for or participate in any repair or maintenance costs. Revised 0812013 Page I of I ct Q cd U r� bJ� cd O Cp 00 d' W Cd 0 0 0 �d r� ell WO iz• IO 05 7-4 0 c� c.� Q � y cU k"7 4- CZ rC 04 . •C"i fnL4 SPECIAL PROVISION 16 INSURANCE At its sole expense, the PERMITEE shall secure and maintain in effect a policy of general liability insurance issued by an insurer licensed to conduct business in the State of Idaho. The insurance policy shall provide liability coverage for any and all claims of bodily injury, property damage, and personal injury arising from the PERMITEE'S use of the Premises which is the subject of this Permit. The insurance policy required by this section shall provide coverage of not less $500,000.00 combined single limit of liability per occurrence. The PERMITEE shall provide additional endorsements and/or increase the policy limits at its sole cost, when and if the limits of liability contained in the Idaho Tort Claims Act are increased. The coverage required by this section shall be provided by the most current Commercial General Liability Policy Form ISO (Insurance Services Offices, Inc.) and shall be endorsed to include pollution liability coverage. The State of Idaho shall be the second named insured (not an additional insured) of the commercial general liability policy required by this section, and shall be written as new business, (upon policy inception). The policy shall be endorsed with a provision relieving the STATE of any responsibility for the payment of any policy premium. The endorsement shall require the insurer to provide the Idaho Transportation Department, District Three Maintenance Engineer in Boise, with no less than THIRTY (30) days written notice before any cancellation of the coverage required by this section. No changes whatsoever shall be initiated as to the coverage without prior written approval by the STATE and written authorization by the STATE to make any requested changes. Any self -insured retained limit of liability is subject to the STATE'S approval. Coverage, if obtained by the PERMITEE in compliance with this section, shall not be deemed as having relieved the PERMITEE of any liability. The PERMITEE shall provide the STATE with a certificate of insurance reflecting the insurance coverage required by this section within TEN (10) business days of the execution of this Permit. Such certificates shall also be provided upon renewal of said policies and changes in carriers. Wherever in this Special Provision written notices are to be given or made, they will be served, personally delivered or sent by certified or overnight mail addressed to the parties at the address listed below unless a different address has been designated in writing and delivered to the other party. The PERMITEE agrees to accept service of process at said address, STATE: IDAHO TRANSPORTATION DEPARTMENT Attn.: District Maintenance Engineer 8150 Chinden Boulevard P.D. Box 8028 Boise, ID 83707-2028 PERMITTEE: Revised 0812013 Page 1 of I Right -Of -Way Encroachment Application and Permit ITD2111 (Rev.11-13) Other Encroachments itd.idaho.gov Idaho Transportation Department ITD Permit Application Number Z18-00 Route S 14 b G Milepost J8, ,5_3 Annlicant Information - Print or Tune Applicant(s) Name (Printed) Mailing Address or P.O. Box City State Zip Code Blood Ilc 629 E Lake Creek St Meridian Id 83642 E-Mail Address (If available) Daytime Phone Number Alternate Phone Number davjd@speedyquick.net 208-272-0813 Property Owner's Name (Printed) Property Address and TAX ID Number City (If in city limits) County Blood Ilc 2560 S Meridian Rd Meridian Request Detail (i.o.., landscaping, benches, bus turnout, etc.) We would like to landscape the Itd right of way between our property and the pavement. Attached is the lanscape plan. For ITD Use Project Number From ITD Highway Plan Date Application Received Date Application Determined Complete In City Limits �S - 379 Cz 711,— zo/7 ] Yes ❑ No Route Segment CIL Milepost CIL Highway Station H (� DG Z f S^d . S 3 4 Right ❑ Left r.7S-- E� Right ❑ Left Site Distance Reason if Restricted to Right Or Left Right Left ITD Distrir_t Review Section Reviewer Date Recommendation A rove Den Section Reviewer Date Recommendation _...._.._._.. A rove Den Design ❑ 3 ❑ Property Mgmt ❑ ❑ Maintenance ❑ ❑ Traffic ❑ ❑ Planner ❑ ❑ Dist. Engineer ❑ ❑ List any conditions of approval List reason(s) for denial recommendation ❑ttar_hmPntc ❑ Special Provisions/Conditions of Approval ❑ Construction Drawings ❑ Traffic Control Plan ❑ Dept. Roadway Plansheets ❑ Standard Drawings ❑ Letters of Recommendation/Denial Upon signature of both parties, subject to all terms, conditions, and provisions of this permit or attachments, permission is hereby granted to begin work within the State Highway Right of Way. Property Owner/Authorized Representative's Signature Date Phone Number X Z7)av-z�ke4 7/15/2017 2082720813 Idaho Transportation Department Authorized Representative's Signature Title Date X / //�- r/ I ¢� / ,,"— I., / Page 1 of 2 General Requirements ITD Permit Application Number 1. The original permit or a copy must be kept an the job site whenever work is taking place. 2. No work shall commence until the permittee is given notice to proceed by an authorized representative of ITD_ The permittee shall notify ITD five (5) working days prior to commencing the permitted work if work does not commence immediately upon notice by ITD. 3. During the progress of all work, traffic control devices shall be erected and maintained as necessary or as directed. All traffic control devices shall conform to the most current edition of the Manual on Uniform Traffic Control Devices for Streets and Highways, as adopted by the State. Equipment or materials left within the highway right-of-way when work is not taking place shall be delineated and protected with appropriate approved traffic control devices. 4. All work within the State Highway Right of Way shall comply with the requirements of the ITD Workzone Safety and Mobility Policy. Copies available from ITD upon request. 5. All work herein permitted shall conform to current government and industry standards, including Americans with Disabilities Act, and shall be performed and completed to the satisfaction of ITD. The expense of any required supervision of work performed under this permit shall be borne by the permittee. 6. All utilities shall be installed under culverts. 7. Work done under this permit shall be constructed in a manner that shall not cause water to flow onto the roadway or shoulder, and shall not interfere with the existing drainage on the State Highway System or any adjacent drainage system. 8. The permittee shall furnish all material; labor, and equipment for the installation and maintenance of approved encroachments. This shall include furnishing drainage pipe, curb, gutter, concrete sidewalk, etc., where required. 9. ITD may inspect the materials and workmanship during construction and upon completion to determine that all terms and conditions of the permit are met. Inspectors are authorized to enforce the conditions of the permit during construction and to halt any activities within state right-of-way that do not comply with the provisions of the permit, that conflict with concurrent highway construction or maintenance work, and/or that endanger highway property, natural or cultural resources protected by law, or the health and safety of workers or the public. % ITD shall be reimbursed by the permittee for any additional inspection required to insure compliance with the conditions of this permit. Inspection fees will be based upon inspection time including travel from the ITD facility and charged at rates commensurate with industry standards. 11. [upon completion of the permitted work, any disturbance of the highway, right of way, and/or traffic control devices shall be restored to the satisfaction of ITD including the removal of all rubbish and debris and may include seeding, planting and grading. 12. Any encroachment that is found to be in non-compliance with the terms of the approved permit may be required to be modified, relocated, or removed at the sole expense of the permittee upon written notification by the District Engineer or his authorized representative. 13. The permittee shall maintain at its sole expense the encroachment for which this permit is granted. 14. Changes in the use as defined in I. D.A.P.A. 39.03.42, of the permitted access not consistent with the terms and conditions listed on the permit may be considered a violation of the permit. Any modification, relocation, or removal of an encroachment or subject granted by this permit shall require a new permit prior to commencement of such work. 15. ITD may revoke, amend, amplify, or terminate this permit or any of the conditions herein enumerated if the permittee fails to comply with any or all of its provisions, requirements, or regulations as herein set forth or through willful or unreasonable neglect, fails to heed or comply with notices given, or if the approach, structure, or subject herein granted is not installed or operated and maintained in conformity herewith. Final Inspection and Approval Subject to all terms, conditions, and provisions of this permit or attachments, Final Inspection has been completed and the permitted work within the State Highway Right of Way is hereby given final approval. District Engineer or Assigns Signature Date X Page 2 of 2 Instructions For Completing ITD 2111, Right -of -Way Encroachment t Application And Permit - Other Encroachments Idaho Transportation Department Note: An incomplete application will delay processing You may be able to expedite the application process and reduce site designing and engineering costs by requesting a pre -application conference with the Idaho Transportation Department (ITD). Contact your local ITD District Office and ask to speak with the Permits Coordinator to schedule a meeting. District 1 District 2 District 3 District 4 District 5 District 6 600 W. Prairie Ave. P.O. Box 837 8150 Chinden Blvd. 216 & Date St, 5151 S. 5th Ave. 206 N_ Yellowstone Ave. Coeur d'Alene, Idaho Lewiston, Idaho Boise, Idaho Shoshone, Idaho Pocatello, Idaho Rigby, Idaho 83815-8764 83501-0837 83714-8028 83352-0820 83205-4700 83442-0097 (208) 772-1200 208) 799-4300 (208) 334-8300 (208) 886-7800 (208) 239-3300 (208) 745-7781 Counties served: Bonewah, Bonner, Counties served: Clearwater, Idaho, Counties served: Ada, Adams, Boise, Canyon, Counties served: Blaine, Camas, Cassia, Custer, Counties served: Bannock, Bear Lake, Counties served: Bonneville, Butte, Clark, Boundary,Kootenai, Latah, Lewis, Nez Perce Elmore, Gem, Owyhee, Payette, Valle y Goading, Jerome; Lincoln, Bingham, Caribou, Custer, Fremont, Jefferson, Shoshone , y, Washington Minidoka, Twin Falls Franklin, Oneida, Power Lemhi, Madison, Teton I. The form initially serves as an application_ If approved, the completed and signed form becomes a permit for the encroachment. 2. Please print (in ink), type, or complete the application in Microsoft Word and print the form. 3. Read and understand these instructions and all of the General Requirements on the form. These requirements apply to all permits and if you are granted a permit, you must adhere to each of them. Additional permit -specific provisions may be a part of any approved permit. 4. Complete each item in the shaded box titled "Applicant Information." 5. Include the following with your application: a. $50 non-refundable application fee. b. Photographs of the proposed encroachment location, including one looking each direction along the highway from the proposed location. Digital photographs are acceptable. c. Include: A drawing or map that shows the location of your property in relation to other roads and/or landmarks. A drawing, such as a landscaping plan or detail of a turnout location. Show the requested encroachment in relation to property lines, the highway, existing buildings, etc. Show dimensions, mark which direction is north and if possible, draw to scale. 6. After your application is received: a. ITD will review the application, all access options, local conditions, and local government plans. The application will then be discussed internally with staff. Your request may be approved, approved with conditions, or denied. b. If your application is approved or approved with conditions, you will receive your permit from lTD accompanied by any additional special provisions that must be adhered to. i. All work under the permit shall be completed within one year from the date that the Department issues the permit to begin work. You may request, in writing, one, 6 month extension prior to expiration of the permit. ii. All permitted work shall be completed and available for final inspection within thirty (30) days after construction begins, unless otherwise stated in the special provisions of the permit. iii. After construction is completed you must notify the ITD Maintenance Foreman for final inspection of the permitted work. The contact information for the foreman will be included in your permit package. iv. Permit will be considered temporary until final approval by the [TD. V. Failure to complete all work in accordance with the requirements of the permit and receive final approval within the allotted time will render the permit null and void. c. If your application is denied, you will be notified by certified mail. The reason(s) for the denial and the process for appealing the denial will be outlined in the letter you receive. ITD 2111 Instructions, Rev. 11-13