Advanced Sign New Building DES,CZC A-2021-0055 (2) Page 1 DATE: 5/4/2021 TO: Wes Steele, AIA, Steele Architecture FROM: Alan Tiefenbach, Associate Planner 208-489-0573 SUBJECT: DES, CZC A-2021-0055 Advanced Sign CZC, DES & ALT LOCATION: The site is located at 2835 E. Lanark St, at the southwest corner of E. Lanark St. and N. Olson Ave I. PROJECT DESCRIPTION Certificate of Zoning Compliance (CZC) and Design Review (DE) to allow a 62,500 sq. ft. light industrial building on 5 acres of land in the I-L Zone District. The proposed building is proposed to be constructed on four lots within two different subdivision filings - Olson and Bush Subdivision No 2 and Olson and Bush Subdivision No 3. There is a 20’ landscape easement along the south perimeter of Lots 1-5, Block 3 of Olson and Bush No. 2. In order for the applicant to build across this easement it must be vacated through City Council. The applicant intends to submit a vacation application concurrently with the building permit process. Alternative Compliance is requested from UDC 11-3A-19 which states “for properties greater than 2- acres in size, no more than fifty percent (50%) of the total off street parking area for the site shall be located between building facades and abutting streets.” The applicant has also requested design exceptions from ASM standards 2.1A and 3.1A regarding wall modulation and roofline variation on the northern elevation. II. DECISION The applicant's request for Certificate of Zoning Compliance, Design Review, Alternative Compliance and Design Exception is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. CERTIFICATE OF ZONING COMPLIANCE REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 ALTERNATIVE COMPLIANCE REQUEST TO UDC 11-3A-19: The applicant is seeking Alternative Compliance approval from UDC 11-3A-19 which states “for properties greater than 2-acres in size, no more than fifty percent (50%) of the total off street parking area for the site shall be located between building facades and abutting streets.” In order to grant approval for alternative compliance, the Director shall determine the following findings: 1. Strict adherence or application of the requirements is not feasible. The applicant states that the project is an industrial use in an industrial zone and as such will have a significant amount of truck traffic accessing the site for receiving and shipping. The site has been designed to separate the employee / visitor vehicle traffic from the truck traffic for safety reasons allowing the trucks to complete their routes without having to encounter parking traffic. The west and south sides are set up for the truck activity and the east and north sides are dedicated to the auto parking areas and drives. To be compliant with the ordinance, at least half of the parking would have to be relocated to the truck maneuvering areas and this would create the opportunity for accidents between trucks and autos and walking employees approaching the building. The Director finds that due to truck traffic, locating visitor parking at the front with separate circulation for truck maneuvering along the sides and backs is safer and more practical for the site. 2. The alternative compliance provides an equal or superior means for meeting the requirements; and; UDC 11-3A-19 Structure and Site Design Standards mention that one purpose of the standards is to establish an aesthetically consistent street presence and limit the visual impacts of large parking areas on a site. Although the design does include all visitor parking at the front of the site, the landscape plan has been revised to include a 250 foot-long +/- landscaped internal parking island whereas the regulations only require a 50 sq. ft. island every 12 parking spaces. This is a significant increase in landscaping over what is required and would soften the visual impacts of the front-oriented parking lot. 3. The alternative means will not be materially detrimental to the public welfare or impair the intended uses and character of surrounding properties. The subject property is located within an industrial area, which is characterized by office, and industrial type uses. Virtually all the businesses along this section of E. Lanark St are comprised of CMU or prefabricated metal with little architectural detailing or fenestration, have their parking oriented between the front of the building and the street, and some have a significant amount of outdoor storage at the front. The proposed building includes landscaping at the front that exceeds the minimum requirements and quality architecture that meets the majority of the ASM standards. The site design and architecture as proposed will provide an aesthetic that will significantly enhance and upgrade the surrounding area. The Director finds that the proposed alternative will not be detrimental to the public welfare or impair the intended use/character of the surrounding properties and agrees it is impractical to require the parking to be located on either side or the rear of the property. Page 3 DESIGN STANDARD EXCEPTIONS The Applicant seeks Design Standard Exceptions from the following requirements of the Architectural Standards Manual: 1. ASM 2.1A - Buildings with rooflines 50-feet in length or greater must incorporate roofline and parapet variations. Variations may include step-downs, step-backs, other modulation, or architectural features such as cornices, ledges, or columns, and must occur in total combination for at least 20% of the façade length. May be averaged over entire façade but may not exceed 75-feet without a break. The applicant does not prefer to adjust the parapet height on the north elevation as it does not add any value to the modifications, would require unnecessary additional engineering for additional wind and snow loading and is an attempt to add visual importance to a location on the building that does not need attention. 2. ASM 3.1A and 3.1B require building modulation of at least 50-foot intervals for buildings greater than 150 feet. Qualifying modulation must be at least 6-inches in depth, be at least 8-inches in width or height (whichever is narrowest) and occur in total for 20% of overall façade elevation. The applicant states that the project is in an industrial area and is one of the last lots to be developed on a dead-end cul-de-sac with virtually no pedestrian traffic. The applicant modulated the parapet and changed colors where it is appropriate to emphasize entries and main corners of the buildings. The north wall does have one section that exceeds the modulation standard but the applicant is reluctant to add additional elements, colors or offsets as they believe it would ultimately detract from the overall design and make the portions that were emphasized (the three tenant entries) less important. Instead, the applicant proposes to modify the east wall changing the rustication pattern, changing the panel color and eliminating one upper window to add a visual break that does comply with the 50’ change requirement. The applicant believes that adding additional materials with 6”x 8” projection will not provide any enhancement as viewed from the street for the proposed design. The applicant proposes that all of the additional upper clear story windows they have included be allowed as a substitution for the 6”x8” projection with the explanation that these provide a material change and break up the elevation more than a small bump of arbitrary material, and will provide a valuable daylighting function in an industrial building. In addition, the applicant has provided landscaping that exceeds minimum requirements in the front parking area. The Director finds the quality of the proposed architecture exceeds that of the surrounding buildings. In order to grant approval for a design standard exception request, the Director will consider the following: 1. The standard(s) that are proposed to be exempt, including the actual text; 2. The reason the exception is requested; and 3. How the alternative means for compliance meets the intent and goals of the requested standard exemption, or how the alternative proposes to maintain a similar level of effort by exceeding other site and building standards. The Director finds that the proposed exceptions will not be detrimental to the public welfare or impair the intended use/character of the surrounding properties. The architectural design as proposed meets the intent of the Architectural Standards Manual, staff does not see the utility in Page 4 requiring the additional modulation and parapet variation to an already quality building in an industrial area, and varying the parapet on the north side would require additional engineering required for wind and snow loading with minimal benefit. Site Specific Conditions of Approval 1. Prior to issuance of the building permit, the applicant shall complete Council approval of vacation of the 20’ landscape easement shown along the south perimeter of Lots 1-5, Block 3 of the Olson and Bush Subdivision No. 2. 2. Per UDC 11-5B-5B2, the Director (at the applicant's request) approved alternative compliance regarding the requirements of UDC 11-3A-19 requiring no more than fifty percent (50%) of the total off street parking area for the site shall be located between building facades and abutting streets. 3. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 4. Proposed carports will be consistent with the materials and architecture of the principal structure. 5. The applicant shall comply with the outdoor storage as an accessory use standard as set forth in UDC 11-3A-14. 6. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 7. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 8. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 9. The site plan prepared by Steele Architecture on April 20, 2021, labeled “Site Plan” shall be revised to reflect one of two options: a. Provide substantial wheel restraints within parking spaces to prevent cars from encroaching upon abutting private and public property or overhanging beyond the designated parking stall dimensions as required by UDC 11-3C-5-B.3. b. Widen sidewalks to 7 feet and reduce parking stalls from 19 to 17 feet as allowed per UDC 11-3C-5-B4. 10. The landscape plan prepared by Steele Architecture on April 20, 2021, labeled “Landscape Plan” is approved by the City of Meridian Planning Division as shown in Exhibit B, with the revision that internal pedestrian walkways shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks as required by UDC 11-3A-19- B4. 11. The elevations prepared by Steele Architecture on April 20, 2021, labeled “Building Elevations”, are approved by the City of Meridian Planning Division as shown in Exhibit C. 12. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 13. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 14. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 15. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Page 5 16. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887-2211. 17. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ 12-003, DA Inst. #113071289, DA Inst # 104056166, DA Inst. # 106187190, PP-12-012, VAR-99-002, FP 00-011). 3. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for light industry use as set forth in UDC 11-4-3. 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3-25. III. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before May 19, 2021, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. Page 6 IV. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until May 5, 2022. V. EXHIBITS Page 7 A. Site Plan (date: 04-20-2021) Page 8 B. Landscape Plan (date: 04/20/2021) Page 9 C. Building Elevations (date: 4/20/2021) Page 10 D. Building Perspective (date: 4/20/2021)