Loading...
A2-01_EXTERIOR BUILDING ELEVATIONSFIRST FLOOR 100' - 0" 1 T.O.W. 135' - 0" 11 2345678910 LEVEL 2 - FLOOR PLAN 115' - 0" ROOF 128' - 0" 03.17 26.11 03.23 08.11 12.04 05.20 26.11 08.11 07.02 03.25 ENTRY PARAPET 139' - 0" FIRST FLOOR 100' - 0" 1 T.O.W. 135' - 0" 112345678910 LEVEL 2 - FLOOR PLAN 115' - 0" ROOF 128' - 0" DOCK 96' - 0" ENTRY PARAPET 139' - 0" 13.21TYP 11.04 TYP 11.01 TYP 32.10 FIRST FLOOR 100' - 0" G T.O.W. 135' - 0" ABCHI LEVEL 2 - FLOOR PLAN 115' - 0" ROOF 128' - 0" TYP 03.23 03.24 12.04 26.11 05.20 26.11 08.11 03.17 08.11 P3P4 P1P2 P3 TYP 08.05 TYP 08.01 TYP 08.11 TYP 26.11 ENTRY PARAPET 139' - 0" FIRST FLOOR 100' - 0" G T.O.W. 135' - 0" A B C H I LEVEL 2 - FLOOR PLAN 115' - 0" ROOF 128' - 0" ENTRY PARAPET 139' - 0" 03.21 EXTERIOR FINISHES LEGEND COLOR TAG MFR COLOR P-1 SHERWIN WILLIAMS SW 7648 BIG CHILL P-2 SHERWIN WILLIAMS SW 9163 TIN LIZZIE P-3 SHERWIN WILLIAMS SW 7068 GRIZZLE GRAY P-4 SHERWIN WILLIAMS SW 7069 IRON ORE SHEET TITLE CLIENT / PROJECT INFORMATION PROJECT NO: DRAWN BY: CHECKED BY: SEAL THIS DRAWING WAS PREPARED BY STEELE ARCHITECTURE FOR A SPECIFIC PROJECT, TAKING INTO CONSIDERATION THE SPECIFIC AND UNIQUE REQUIREMENTS OF THE PROJECT. REUSE OF THIS DRAWING OR ANY INFORMATION CONTAINED IN THIS DRAWING FOR ANY PURPOSE IS PROHIBITED UNLESS WRITTEN PERMISSION FROM BOTH SA AND SA'S CLIENT IS GRANTED. SHEET # PO BOX 245 | EAGLE, ID 83616 208.871.7176 NOT FOR CONSTRUCTION PRELIMINARY 3/3/2021 7:25:56 AM2883 E LANARK ST MERIDIAN, ID 83642 NEW BUILDING 20016 WAS WAS A2-01A2-01 EXTERIOR BUILDING ELEVATIONS SCALE: 1" = 10'-0" NORTH ELEVATIONA SCALE: 1" = 10'-0" SOUTH ELEVATIOND SCALE: 1" = 10'-0" EAST ELEVATIONB SCALE: 1" = 10'-0" WEST ELEVATIONC KEYED NOTES #NOTE 03.17 SITE-CAST CONCRETE TILT UP WALL. REFER TO WALL TYPES AND STRUCTURAL 03.21 SITE CAST TILT UP CONCRETE DOCK WALL WITH GALVANIZED PIPE GUARDRAIL 03.23 CONCRETE REVEAL TYPE 1, REFER TO WALL DETAILS 03.24 CONCRETE REVEAL TYPE 2, REFER TO WALL DETAILS 03.25 CONCRETE REVEAL TYPE 3, REFER TO WALL DETAILS 05.20 STEEL ENTRANCE CANOPY 07.02 PRE-FINISHED 24 GA. GALV. STEEL COPING CAP. ANCHOR 10' SEGMENTS WITH 1" INTERLOCKING 'S' JOINTS FILLED WITH SEALANT 08.01 HOLLOW METAL DOOR AND FRAME. PRIME AND PAINT, POLYURETHANE INSULATED AT EXTERIOR 08.05 INSULATED OVERHEAD SECTIONAL DOOR 08.11 ALUMINUM STOREFRONT & TINTED GLAZING SYSTEM 11.01 7' x 8' MECHANICAL 40,000 LB DOCK LEVELER AND BUMPERS. PROVIDE WITH UNDER LEVELER SEAL SYSTEM AND VEHICLE RESTRAINT. 11.04 DOCK SEAL WITH HEAD PAD 12.04 SIGNAGE FOR REFERENCE BY TENANT, UNDER SEPERATE APPROVAL AND PERMITS 13.21 PEMB COVERED PATIO STRUCTURE 26.11 BUILDING MOUNTED LIGHT FIXTURE WITH CUT OFF LENS SHIELD, REFER TO ELECTRICAL 32.10 CAST IN PLACE CONCRETE STAIR WITH GALVANIZED PIPE INDUSTRIAL SAFETY GUARDRAIL AND HANDRAIL EXTERIOR ELEVATION NOTES 1. ALL CONCRETE WALLS TO RECEIVE ONE COAT CONCRETE PRIME, TEXTURED CONCRETE COATING SYSTEM (MEDIUM TEXTURE) AND 'FLAT' TOP COAT. 2. PAINT ALL EXTERIOR METAL SURFACES WITH PRIMER COAT AND DIRECT TO METAL, SEMI-GLOSS FINISH 3. ALL CONCRETE WALL JOINTS TO BE SEALED (INTERIOR & EXTERIOR WITH TREMCO DYMERIC 240FC POLYURETHANE SEALANT OR EQUAL. TINT SEALANT TO MATCH ADJACENT PAINT COLORS 4. ALL BOLLARDS TO BE PAINTED SAFETY YELLOW OR RED 5. ALL EXPOSED PRE-FINISHED METAL ITEMS SHALL MATCH SELECTED PAINT COLORS 6. ALL INTERIOR CONCRETE WALL SURFACES TO BE SMOOTH HARD TROWEL FINISH 7. ALL METAL RAILINGS SHALL BE GALVANIZED WITH NO PAINT PRINT RECORD REV DESCRIPTION DATE 1 ISSUED FOR DR & CZC 13/03/2021