Loading...
A4-51_PARKING CANOPYP-1 P-A P-B P-C P-D P-E P-F P-G 1' - 0"180' - 0" (18 PARKING STALLS @ 10'-0")1' - 0" 30' - 0" (3) EQ 30' - 0" (3) EQ 30' - 0" (3) EQ 30' - 0" (3) EQ 30' - 0" (3) EQ 30' - 0" (3) EQ 32' - 0"16' - 0"16' - 0"A A4-51 B A4-51 TYP 13.01 ROOF ABOVE CURB & GUTTER, REFER TO CIVIL TYP 32.19 P-AP-BP-CP-DP-EP-FP-G TOP OF BEAM15' - 0"180' - 0" TYP 13.01 TYP 13.20 P-1 15' - 0"15' - 0" 32' - 4"15' - 0"14' - 0"1' - 0"TYP 13.01 TYP 13.20 EXTERIOR FINISHES LEGEND COLOR TAG MFR COLOR P-1 SHERWIN WILLIAMS SW 7648 BIG CHILL P-2 SHERWIN WILLIAMS SW 9163 TIN LIZZIE P-3 SHERWIN WILLIAMS SW 7068 GRIZZLE GRAY P-4 SHERWIN WILLIAMS SW 7069 IRON ORE SHEET TITLE CLIENT / PROJECT INFORMATION PROJECT NO: DRAWN BY: CHECKED BY: SEAL THIS DRAWING WAS PREPARED BY STEELE ARCHITECTURE FOR A SPECIFIC PROJECT, TAKING INTO CONSIDERATION THE SPECIFIC AND UNIQUE REQUIREMENTS OF THE PROJECT. REUSE OF THIS DRAWING OR ANY INFORMATION CONTAINED IN THIS DRAWING FOR ANY PURPOSE IS PROHIBITED UNLESS WRITTEN PERMISSION FROM BOTH SA AND SA'S CLIENT IS GRANTED. SHEET # PO BOX 245 | EAGLE, ID 83616 208.871.7176 NOT FOR CONSTRUCTION PRELIMINARY 5/3/2021 8:24:22 AM2883 E LANARK ST MERIDIAN, ID 83642 NEW BUILDING 20016 WAS WAS A4-51A4-51 ADD ALTERNATE PARKING CANOPY SCALE: 1/8" = 1'-0" PARKING CANOPY PLAN1 SCALE: 1/8" = 1'-0" PARKING CANOPY ELEVATIONA SCALE: 1/8" = 1'-0" PARKING CANOPY ELEVATIONB PRINT RECORD REV DESCRIPTION DATE A ISSUED FOR REVIEW 04/20/2021 KEYED NOTES #NOTE 13.01 PEMB STRUCTURAL FRAME, REFER TO VENDOR DRAWINGS 13.20 PEMB COVERED PARKING STRUCTURE 32.19 STANDARD PARKING PLACE 3" WIDE STRIPING 10' x 36' EXTERIOR ELEVATION NOTES 1. ALL CONCRETE WALLS TO RECEIVE ONE COAT CONCRETE PRIME, TEXTURED CONCRETE COATING SYSTEM (MEDIUM TEXTURE) AND 'FLAT' TOP COAT. 2. PAINT ALL EXTERIOR METAL SURFACES WITH PRIMER COAT AND DIRECT TO METAL, SEMI-GLOSS FINISH 3. ALL CONCRETE WALL JOINTS TO BE SEALED (INTERIOR & EXTERIOR WITH TREMCO DYMERIC 240FC POLYURETHANE SEALANT OR EQUAL. TINT SEALANT TO MATCH ADJACENT PAINT COLORS 4. ALL BOLLARDS TO BE PAINTED SAFETY YELLOW OR RED 5. ALL EXPOSED PRE-FINISHED METAL ITEMS SHALL MATCH SELECTED PAINT COLORS 6. ALL INTERIOR CONCRETE WALL SURFACES TO BE SMOOTH HARD TROWEL FINISH 7. ALL METAL RAILINGS SHALL BE GALVANIZED WITH NO PAINT