Loading...
PZ - Elevations 2 3 4 - - 8 9 10 1 - 4 . EIFS TO BE ORANGE LIGHT CORNICE CORNICE PAINTED FIXTURE TO BE TO BE CORNICE TO PAINTED EP-1 LX-1 PAINTED PAINTED ,—NEW SIGNAGE - REFER TO BE EP-1 EP-1 SIGNAGE PACKAGE 1" EIFS BAND TO DRIVE THRU SPECIFICATIONS EP-2 CORNICE TO ORANGE LIGHT F-- EIFS TO BE PAINTED BE PAINTED T.O. PARAPET DRIVE THRU WINDOW-QUIKSERV BE PAINTED FIXTURE EP-1 21'-10"AFF MODEL# BP-7241 E- STANDARD INSTALLATION EP-1) LX-1 EP-1 20'-6PARAPET MODEL# BP-7241E-IP- HIGH WIND ZONE AS DETERMINED BY THE LOCAL 0 BUILDING CODE - FT.O. PARAPET GENERAL NOTES: M co ACTUAL DIMENSIONS: 72" (W)x 27" (H) a M ORANGE LIGHT ROUGH OPENING 72 1/2" (W)x 41 1/2" (H) FIXTURE 8'-7" 1 V-0 1/2 �op���� LX-1 1) EYE SET TO BE MOUNTED DIRECTLY BELOW THE SERVICE OPEN IN . BAR TO BE MOUNTED ON THE WALL. —NEW SIGNAGE - REFER TO 2) ANCHOR SCREWS TO BE SUPPLIED BY THE CONTRACTOR. SIGNAGE PACKAGE 3) JUNCTION BOX TO BE SUPPLIED BY CONTRACTOR. N INSTALLATION: CANOPY 1) QUIKSERV WINDOWS MUST BE INSTALLED LEVEL AND SQUARE TO ORK - EP-16 PROPERLY. N 2) ANCHOR ACCORDING TO THE LOCAL BUILDING CODE ANCHOR EQ EQ EQ ` SCHEDULE. N 3) 115V/15 AMP. DEDICATED CIRCUIT FEATURE. B.O. CANOPY 4) RECOMMENDED HEIGHT FROM FLOOR TO SERVCE OPENING TO BE 6". STOREFRONT 9'-4"AFF (CHECK FOR ANY LOCAL CODES OR CITY CODES) T.O. WALL ASSEMBLY 5) SILICONE ALL EXTERIOR AND INTERIOR JOINTS. 8'-0"AFF. 6) ALL OTHER TYPES OF ANCHORING TO BE APPROVED BY CERTIFIED ENGINEER. STOREFRONT NEW CANOPY D.T. WINDOW ASSEMBLY 4 EP-6 4B A6 NEW VERTICAL WOOD PANEL SIDING EF-1 L 5 6A A10 1 FINISHED FLOOR 0'-0"AFF. COOLER TO HAVE FRAMEDJL 1" EIFS TO BE EIFS ACCENT SHUTTERS EIFS SHUTTER — THIN BRICK EB-1 CANOPY EP-5 RAILING TO BE EIFS ACCENT EF-3 moll WALL WITH EIFS FINISH PAINTED%EP_3 BAND LIGHT D GREYED SURROUND TO BE PAINTED PAINTED BANPAINT TO BE TED EP-3 EP-1 K DT side Elevation Scale: 1/4'' = 1'-0" CORNICE TO BE 1 PAINTED A9 EIFS CORNICE GRAPHIC SIGNAGE EP-1 CORNICE EIFS BAND 4 TO BE PAINTED 2 SIGN VENDOR TO Lk T.O. PARAPET TO BE TO BE A8 EP-2 qg APPLY FOR 21'-10"AFF EIFS TO BE CORNICE TO PAINTED ORANGE LIGHT PAINTED VARIANCE 1 ORANGE LIGHT BE PAINTED PAINTED EP-1 FIXTURE EP-1 ORANGE A8 FIXTURE LX-1 LIGHT EP-1 EP-1 T.O. PARAPET FIXTURE J 19'-2"AFF �o�p�oga� J M � � I REFER TO LIGHTING 1 V-8 1/2" 9'-3" SCHEDULE ORANGE LIGHT FIXTURE SIGNAGE - REFER TO o SIGNAGE PACKAGE I 00 4,-5„ 3 1/2" -4� EIFS TO BE PAINTED _ 1' EP-1 EQ EQ EQ 4'-3" B.O. CANOPY (2) DOUBLE LOUVER _i 9'-4"AFF T.O. WALL OdLVINYL SHUTTER FLAT CANOPY 8'-0"AFF. H EP-6 FLAT CANOPY H E P-6 I STOREFRONT ao ASSEMBLY 4B o 0 8 A10 A17 1„ SPACE GAP I e e a 6 I - - 5 - � - _ _ c EIFS FRAME, G A 0 A10 ? _ PAINTED EP-1 G FINISHED FLOOR 5' VERTICAL WOOD EIFS ACCENTJmlllllllllll� — 1" EIFS TO BE EIFS TO BE DOORS ARE TO BE THIN BRICK EIFS TO BEV 1" EIFS TO BE EIFS TRIM TO BEL COOLER TO HAVE FRAMED SHUTTERS GAS METER PANEL SIDING EF-1 BAND TO BE PAINTED EPp _ PAINTED EP-1 PURCHASED FROM VENEER EB-1 PAINTED EP-1 PAINTED EP-3 PAINTED WALL WITH EIFS FINISH EP-3 PAINTED EP-3 MANUFACTURER IN EP-1 ORANGE FINISH Entry side Elevation F Scale 1/4'' = 1'-0" F Mark Description Date SPECIFICATIONS FOR SITE PLAN APPROVAL 04/15/21 SECTION TITLE 2.5. DEFLECTION: MAXIMUM ALLOWABLE DEFLECTION IN ANY MEMBER QUALITY ASSURANCE ALUMINUM - FRAMED ENTRANCES AND STOREFRONTS YKK AP PRODUCT WHEN TESTED IN ACCORDANCE WITH ASTM E 330 WITH 1. QUALIFICATIONS: 3. SHIM AND BRACE ALUMINUM SYSTEM BEFORE ANCHORING TO SERIES YKK AP YES 45 FS/FI SERIES ALLOWABLE STRESS IN ACCORDANCE WITH AA SPECIFICATIONS FOR 1.1. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED (AS STRUCTURE. PART 1 GENERAL ALUMINUM STRUCTURES. DETERMINED BY CONTRACTOR)TO PERFORM WORK OF THIS 4. PROVIDE SILL FLASHING AT EXTERIOR STOREFRONT SYSTEMS. EXTEND 1. SECTION INCLUDES: ALUMINUM STOREFRONT, INCLUDING: 2.6. THERMAL MOVEMENT: PROVIDE FOR THERMAL MOVEMENT CAUSED SECTION WHO HAS SPECIALIZED IN THE INSTALLATION OF WORK EXTRUDED FLASHING CONTINUOUS WITH SPLICE JOINTS; SET IN 1.1. YKK AP SERIES YES 45 FI STOREFRONT SYSTEM (INSULATING BY 180 DEGREES F. (82.2 DEGREES C.) SURFACE SIMILAR TO THAT REQUIRED FOR THIS PROJECT. IF REQUESTED BY CONTINUOUS BEADS OF SEALANT. F GLAZING) TEMPERATURE, WITHOUT CAUSING BUCKLING STRESSES ON GLASS, OWNER, SUBMIT REFERENCE LIST OF COMPLETED PROJECTS. 5. VERIFY STOREFRONT SYSTEM ALLOWS WATER ENTERING SYSTEM TO BE Building Design & Documentation ©2021-2022 Jeffrey Parker Architects Inc. 1. RELATED SECTIONS: JOINT SEAL FAILURE, UNDUE STRESS ON STRUCTURAL ELEMENTS, 2.2. PRE-INSTALLATION MEETINGS: CONDUCT PRE-INSTALLATION COLLECTED IN GUTTERS AND WEPT TO EXTERIOR. VERIFY METAL JOINTS 1.1. SINGLE SOURCE REQUIREMENT: ALL PRODUCTS LISTED BELOW DAMAGING LOADS ON FASTENERS, REDUCTION OF PERFORMANCE, MEETING TO VERIFY PROJECT REQUIREMENTS, SUBSTRATE ARE SEALED IN ACCORDANCE WITH MANUFACTURERS INSTALLATION SHALL BE BY THE SAME MANUFACTURER. OR DETRIMENTAL EFFECTS. CONDITIONS, MANUFACTURER'S INSTALLATION INSTRUCTIONS, AND INSTRUCTIONS. 2.7. THERMAL PERFORMANCE: WHEN TESTED IN ACCORDANCE WITH MANUFACTURER'S WARRANTY REQUIREMENTS. SECTION 8D: GLAZING Jeffrey 2. SYSTEM PERFORMANCE DESCRIPTION AAMA 1503.1 AND NFRC 100: 3. PROJECT CONDITIONS/SITE CONDITIONS. 2.1. PERFORMANCE REQUIREMENTS: PROVIDE ALUMINUM 2.7.1. CONDENSATION RESISTANCE FACTOR (CRF F ): A MINIMUM OF 44 FOR 3.1. FIELD MEASUREMENTS: VERIFYACTUAL MEASUREMENTS/ GENERAL PROVISIONS Parker STOREFRONT SYSTEMS THAT COMPLY WITH PERFORMANCE YES 45 1SYSTEMS. OPENINGS BY FIELD MEASUREMENTS BEFORE FABRICATION; RETAIN 1. SCOPE: FURNISH AND INSTALL GLASS IN STOREFRONT AND DRIVE-THRU REQUIREMENTS INDICATED, AS DEMONSTRATED BY TESTING 2.7.2. THERMAL TRANSMITTANCE U VALUE: 0.51 BTU/HR/FT2/°F OR LESS FOR RECORDED MEASUREMENTS ON SHOP DRAWINGS. COORDINATE D MANUFACTURER'S ASSEMBLIES IN ACCORDANCE WITH TEST YES 45 FI SYSTEMS. FIELD MEASUREMENTS, FABRICATION SCHEDULE WITH SERVICE WINDOW. 11 rch i teas METHOD INDICATED. NOTE: THERMAL PERFORMANCE FOR THE GLAZED SYSTEM AS A WHOLE CONSTRUCTION PROGRESS TO AVOID CONSTRUCTION DELAYS. MATERIALS 2.2. AIR INFILTRATION: WHEN TESTED IN ACCORDANCE WITH ASTM E WILL BE AFFECTED BY THE CHARACTERISTICS OF THE GLASS 4. WARRANTY 283 AT DIFFERENTIAL STATIC PRESSURE OF 6.24 PSF (299 PA), SPECIFIED. 4.1. PROJECT WARRANTY: REFER TO "CONDITIONS OF THE CONTRACT" 1. TYPE: SOLAR CONTROL LOW-E CLEAR INSULATING GLASS COMPLETED STOREFRONT SYSTEMS SHALL HAVE MAXIMUM SUBMITTALS FOR PROJECT WARRANTY PROVISIONS. "SOLARBAN 60 (2) CLEAR + CLEAR BY VITRO ARCHITECTURAL GLASS. ALLOWABLE INFILTRATION OF: 2.1. GENERAL: PREPARE, REVIEW, APPROVE, AND SUBMIT SPECIFIED 4.2. MANUFACTURER'S WARRANTY: SUBMIT, FOR OWNER'S ACCEPTANCE, 1.1. OUTDOOR LITE: CLEAR GLASS, SPUTTER COATED ON SECOND ARCHITECTURE PLANNING ENGINEERING 2.2.1. 0.06 CFM/FT2 (1.10 M 3/H • I) FOR YES 45 FI SYSTEMS. SUBMITTALS IN ACCORDANCE WITH "CONDITIONS OF THE CONTRACT" MANUFACTURER'S STANDARD WARRANTY DOCUMENT EXECUTED BY SURFACE (2) 2.3. WATER INFILTRATION: NO UNCONTROLLED WATER WHEN TESTED AND DIVISION 1 SUBMITTALS SECTIONS. PRODUCT DATA, SHOP AN AUTHORIZED COMPANY OFFICIAL. 1.2. INDOOR LITE: CLEAR (TRANSPARENT) FLOAT GLASS. 855 28th Street SE Phone: 616-241-0090 IN ACCORDANCE WITH ASTM E 331 AT TEST PRESSURE DRAWINGS, SAMPLES, AND SIMILAR SUBMITTALS ARE DEFINED IN 4.3. WARRANTY PERIOD: MANUFACTURER'S ONE (1)YEAR STANDARD 1.3. LOW-E COATING: "SOLARBAW 60 SOLAR CONTROL(SPUTTERED) BY Grand Rapids MI 49508 Fax: 616-241-0098 DIFFERENTIAL OF: "CONDITIONS OF THE CONTRACT." WARRANTY COMMENCING ON THE SUBSTANTIAL DATE OF VITRO ARCHITECTURAL GLASS 2.3.1. 10 PSF (479 PA) FOR YES 45 FI SYSTEMS. (OR WHEN REQUIRED, 2.2. PRODUCT DATA: SUBMIT PRODUCT DATA FOR EACH TYPE COMPLETION FOR THE PROJECT PROVIDED THAT THE WARRANTY, IN LOCATION: SECOND SURFACE (2) FIELD TESTED IN ACCORDANCE WITH AAMA 503). FASTENER STOREFRONT SERIES SPECIFIED AS REQUIRED BY THE ARCHITECT OF NO EVENT, SHALL START LATER THAN SIX (6) MONTHS FROM THE Building for: HEADS MUST BE SEATED AND SEALED AGAINST SILL RECORD. DATE OF SHIPMENT BY YKK AP AMERICA INC. EDITOR NOTE: LONGER 2• PERFORMANCE VALUES: FLASHING ON ANY FASTENERS THAT PENETRATE THROUGH 2.3. SUBSTITUTIONS: WHENEVER SUBSTITUTE PRODUCTS ARE TO BE WARRANTY PERIODS ARE AVAILABLE AT ADDITIONAL COST. 2.1. VISIBLE LIGHT TRANSMITTANCE: 70% POPEYES THE SILL FLASHING. CONSIDERED, SUPPORTING TECHNICAL DATA, SAMPLES, AND TEST 5. PART 2 PRODUCTS 2.2. U-VALUE WINTER: 0.29 2.4. WIND LOADS: COMPLETED STOREFRONT SYSTEM SHALL REPORTS MUST BE SUBMITTED TEN (10)WORKING DAYS PRIOR TO BID 5.1. MANUFACTURERS (ACCEPTABLE MANUFACTURERS/PRODUCTS) 2.3. U-VALUE SUMMER : 0.27 WITHSTAND WIND PRESSURE LOADS NORMAL TO WALL PLANE DATE IN ORDER TO MAKE A VALID COMPARISON. 5.2. ACCEPTABLE MANUFACTURERS: YKK AP AMERICA INC. 2.4. SHGC: 0.39 INDICATED: 2.4. SHOP DRAWINGS: PROVIDE TO THE ARCHITECT OF RECORD IF 5.3. STOREFRONT SYSTEM: YKK AP YES 45 FI STOREFRONT SYSTEM. 2.5. SHADING COEFFICIENT: 0.45 2.4.1. EXTERIOR WALLS: REQUESTED. SHOP DRAWINGS SHOWING LAYOUT, PROFILES, AND 6. COLORS: AS SPECIFIED BY POPEYES LOUISIANA KITCHEN: 2.6. OUTDOOR VISIBLE LIGHT REFLECTANCE: 11% MERIDIAN, ID g 2.4.1.1. POSITIVE PRESSURE: PER LOCAL CODE. PRODUCT COMPONENTS, INCLUDING ANCHORAGE, ACCESSORIES, 2.4.1.2. NEGATIVE PRESSURE: PER LOCAL CODE. FINISH COLORS AND TEXTURES. INSTALLATION APPROVED MANUFACTURERS: 2.4.1.3. INTERIOR WALLS (PRESSURE ACTING IN EITHER 2.5. QUALITY ASSURANCE/CONTROL SUBMITTALS: 1. GENERAL: INSTALL MANUFACTURER'S SYSTEM IN ACCORDANCE WITH VITRO CERTIFIED FABRICATOR REQUIRED Exterior Elevations DIRECTION): PER LOCAL CODE. 2.5.1. TEST REPORTS: SUBMIT CERTIFIED TEST REPORTS SHOWING SHOP DRAWINGS, AND WITHIN SPECIFIED TOLERANCES. CERTIFICATION: BOTH LITES TO BE CRADLE TO CRADLE CERTIFIEDT"', MINIMUM 2.5. DEFLECTION: MAXIMUM ALLOWABLE DEFLECTION IN ANY MEMBER COMPLIANCE WITH SPECIFIED PERFORMANCE CHARACTERISTICS 1. PROTECTALUMINUM MEMBERS IN CONTACT WITH MASONRY, STEEL, BRONZE LEVEL, BY CRADLE TO CRADLE PRODUCT INNOVATION INSTITUTE ( Issued Drawing No. WHEN TESTED IN ACCORDANCE WITH ASTM E 330 WITH AND PHYSICAL PROPERTIES IF REQUIRED BY THE LOCAL PERMITTING CONCRETE, OR DISSIMILAR MATERIALS USING NYLON PADS WWW.C2CCERTIFIED.ORG). 03/11/21 ALLOWABLE STRESS IN ACCORDANCE WITH AA SPECIFICATIONS AUTHORITY. OR BITUMINOUS COATING. FOR ALUMINUM STRUCTURES. 2.6. CLOSEOUT SUBMITTALS: 2. SHIM AND BRACE ALUMINUM SYSTEM BEFORE ANCHORING TO OUTDOOR APPEARANCE: CLEAR 2.6.1. WARRANTY: SUBMIT WARRANTY DOCUMENTS SPECIFIED HEREIN. STRUCTURE. INSULATING UNIT CONSTRUCTION: 1/4" (6MM) GLASS + 1/2" (13MM)AIR SPACE + Project No. A3 , 1 1/4" (6MM) GLASS 4 - = 13 14 1 , L 4 5 6 7 8 9 10 1' 12 13 14 15 SPECIFICATIONS : 3 CORNICE TO A9 BE PAINTED DIVISION 7: THERMALAND MOISTURE �P_1� SIGNAGE TO BE S-1 S-2 PROTECTION PROVIDE NEW EIFS 0 CORNICE TO BE PAINTED THIN BRICK ORANGE LIGHT 1" EIFS BAND TO BE 0 SECTION 7C: SHEET METALWORK TO BE EP-1 PAINTED�P-1 GENERAL PART 3 EXECUTION PAINTED EB-1 FIXTURE LX-1 _� PROVISION A. UNDER NO CIRCUMSTANCES SHALL ANY OF THE PRODUCTS BE EP_2 Ell 1. SCOPE: FURNISH AND INSTALL GRAVEL STOPS, FLASHING, PARAPET CAP, ALTERED BY ADDING ANY ADDITIVES, EXCEPT FOR SMALL AMOUNTS T.O. PARAPET REFER TO MASTER FINISH SCHEDULE DOWNSPOUTS,AND GUTTERS. OF CLEAN WATER AS DIRECTED ON LABEL.ANTIFREEZE, 21'-10"AFF ACCELERATORS, RAPID BINDERS, ETC.,ARE FORBIDDEN. T.O. PARAPET FOR SIGN MANUFACTURERS AND A. ROOFING MEMBRANE FLASHING IS INCLUDED IN SECTION 20'-6"AFF. EP_1 M EP-2 (BROWN) 7B: MEMBRANE ROOFING. B. THE SURFACE TO RECEIVE THE EIFS SHALL BE STRUCTURALLY MATERIALS SOUND, CLEAN, DRY AND FREE OF WARPAGE, RESIDUAL MOISTURE OR W T.O. PARAPET SPECIFICATIONS DAMAGE FROM MOISTURE. SURFACES SHALL BE UNIFORM,WITH NO 19'-2"AFF N 1. MATERIALS SHEET METAL: .032 ALUMINUM. IRREGULARITIES GREATER THAN 1/8"in 4'-0". SURFACES SHALL BE ch N 2. NAIL FASTENERS: 1 3/4"X 11 GAUGE GALVANIZED,STAINLESS STEEL, OR INSPECTED FOR COMPLIANCE WITH THE FOLLOWING REQUIREMENTS LD) O D ALUMINUM ROOFING NAILS MAY BE USED FOR FASTENERS INTO WOOD WHEN PRIOR TO INSTALLATION OF THE EIFS: ORANGE LIGHT CONCEALED ONLY. 1. PLYWOOD SHEATHING SHALL MEET A.P.A. (AMERICAN FIXTURE LX-1 3. WASHERS: NEOPRENE PLYWOOD ASSOCIATION)REQUIREMENTS FOR EXTERIOR OR THIN BRICK n 4. SCREW FASTENERS: CORROSION-RESISTANT, SELF-TAPPING, HEX HEAD EXPOSURE 1 CLASSIFICATION.APA DESIGN AND L��U &H& [=(P- W H EB-1 FRAMING SCREW, 1/4"MINIMUM DIAMETER WITH SUFFICIENT LENGTH TO PENETRATE 1" CONSTRUCTION GUIDELINES SHALL BE FOLLOWED FOR CANOPY TO BE EP-1 SUBSTRATE STORAGE, HANDLING AND INSTALLATION. MANUFACTURER'S MINIMUM INTO WOOD OR MINIMUM INTO STEEL. PROVIDE NEOPRENE PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR PAINTED EP-5 LU CODE APPROVED WATER SEALING WASHER FOR EXPOSED SED FASTENING. SHALL BE FOLLOWED FOR STORAGE, HANDLING, STORAGE, FLAT CANOPY RESISTIVE BARRIER, M PERFORMANCE HANDLING, INSTALLATION AND PROTECTION. ANY SHEATHING 00 Ell BY OTHERS M 1. INSTALLATION: EXPOSED FLASHINGS SHALL BE PAINTED TO MATCH NOT IN COMPLIANCE SHALL BE REPLACED TO CONFORM WITH EO EC ° SPECIFICATION REQUIREMENTS PRIOR TO INSTALLATION OF - N °°° DRYVIT APPROVED WASHER ADJACENT MATERIALS. VERIFY WITH POPEYES'CONSTRUCTION MANAGER. THE EIFS. WITH CORROSION RESISTANT rn i FASTENER DIVISION 9: FINISHES 2. CONCRETE, MASONRY OR PLASTER SURFACES SHALL BE 04 B.O.AWNING PROPERLY CURED AND FREE OF DIRT, DUST, OIL, GREASE, DRYVIT DRAINAGE MAT 9'-4"Al SECTION 9G: EIFS MILDEW, FUNGUS, LATENCY, PAINT, EFFLORESCENCE AND ANY EPS INSULATION BOARD PART 1 GENERAL OTHER CONTAMINANT.ANY SURFACES NOT IN COMPLIANCE EP-1 SHALL BE CORRECTED PER MANUFACT. RECOMMENDATIONS CANOPY 1.01 DESCRIPTION PRIOR TO INSTALLATION OF THE EIFS. THIN BRICK EP-6 STOREFRONT DRYVIT GENESIS®BASE COAT A. DESIGN REQUIREMENTS:THE STRUCTURAL WALL SYSTEM EB-1 ASSEMBLY L TO WHICH THE EIFS IS ATTACHED SHALL MEET L/240 MAXIMUM C. AFTER SATISFACTORY INSPECTION OF SURFACES AND EP-1 DRYVIT REINFORCING MESH L ALLOWABLE DEFLECTION CRITERIAAND APPLICABLE BUILDING CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION CODE REQUIREMENTS. REQUIREMENTS,THE EIFS INSTALLATION MAY BEGIN PER DRYVIT GENESIS BASE COAT 1.02 SUBMITTALS MANUFACTURER'S INSTRUCTIONS. D. THE STARTER STRIP OF MESH SHALL BE WIDE ENOUGH TO DRYVIT FINISH A. SUBMIT SAMPLES FOR APPROVAL AS DIRECTED BY OWNER. ADHERE 4"OF MESH ONTO THE WALL, BE ABLE TO WRAP AROUND THE BOARD EDGE AND COVER APPROXIMATELY 4"ON THE OUTSIDE EP 4 THIN BRICK VENEER DRAINAGE MAT 1.03 DELIVERY,STORAGE AND SURFACE OF THE BOARD.THIS"BACKWRAP"PROCEDURE SHALL BE EB-1 (SYSTEM 1) Outsulation LCMD option1 as manuf by Dryvit HANDLING FOLLOWED ATALL EXPOSED BOARD EDGES IN ACCORDANCE WITH - TYP. EIFS D ETAI L A. ALL EIFS MATERIALS SHALL BE DELIVERED IN THEIR DETAILS(EXAMPLE-WINDOW AND DOOR HEADS AND JAMBS). r ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S FINISHED FLOORAl K NAME AND IDENTIFICATION OF PRODUCT WITH WRITTEN ALL AREAS WHERE THE EIFS MEETS DISSIMILAR MATERIAL OR 0'-0"Al NTS K APPLICATION INSTRUCTIONS AND APPROPRIATE HEALTH, TERMINATES(FOR EXAMPLE,WINDOW AND DOOR FRAMES)SHALL HAZARD,AND SAFETY DATA. HAVE THE INSULATION BOARD CUT BACK FROM THE ADJOINING EP-3 B. ALL EIFS READY-MIXED MATERIALS SHALL BE PROTECTED MATERIAL MINIMUM OF 1/4"TO FORM AN ISOLATION JOINT. DOORS ARE TO BE EIFS ACCENT BAND FROM EXTREME HEAT, SUN AND FROST. FACTORY E. APPLY THE ADHESIVE TO THE BACK OF THE INSULATION BOARD. VERTICAL WOOD PANEL EIFS TO BE PAINTED Front H l e v a t i o n PURCHASED FROM TO BE PAINTED EF-1 EP-3 <SIDING EP-3 PROPORTIONED BAGGED MATERIALS SHALL BE STORED OFF STAGGER VERTICAL JOINTS AND INTERLOCK BOARDS ATALL INSIDE MANUFACTURER IN THE GROUND AND PROTECTED FROM MOISTURE. AND OUTSIDE CORNERS.APPLY FIRM PRESSURE OVER ENTIRE Scale: /4" = 1' 0" 1.04 JOB CONDITIONS SURFACE OF THE BOARDS TO INSURE UNIFORM CONTACT. BOARDS ORANGE FINISH REFER TO MASTER FINISH SCHEDULE SHALL BRIDGE SHEATHING JOINTS BY MINIMUM OF 8".ALL BOARD A. ALL EIFS MATERIALS SHALL NEVER BE APPLIED IF AMBIENT JOINTS SHALL BE BUTTED TIGHTLY TOGETHER TO ELIMINATE ANY FOR SHUTTER MANUFACTURERS AND SURFACE TEMPERATURES CANNOT BE KEPT ABOVE 40° F THERMAL BREAKS IN THE EIFS. CARE MUST BE TAKEN TO PREVENT DURING APPLICATION AND DRYING PERIOD. FOR INSTALLATION ANY ADHESIVE FROM GETTING BETWEEN THE JOINTS OF THE BOARDS. CORNICE TO BE EIFS TO BE IN TEMPERATURES LESS THAN 40' F SUPPLEMENTARY HEAT ALL OPEN JOINTS IN THE INSULATION BOARD LAYER SHALL BE FILLED PAINTED PAINTED EP-1 CORNICE TO SHALL BE PROVIDED.THE INSTALLED EIFS MATERIALS SHALL WITH SLIVERS OF INSULATION OR AN APPROVED SPRAY FOAM. EP-1 BE PROTECTED FROM EXPOSURE TO RAIN AND FREEZING EP-1 BE PAINTED UNTIL DRY. GUTTER AND EP-2 F. NAILS,SCREWS, OR ANY OTHER TYPE OF NONTHERMAL LEADER T.O. PARAPET 1.11 WARRANTY 21'-10"AFF MECHANICAL FASTENER SHALL NOT BE USED. A. PROVIDE MANUFACTURERE'S STANDARD LABOR AND G. EXPANSION JOINTS ARE REQUIRED IN THE EIFS WHERE THEY EP-1 2 T.O. PARAPET MATERIAL WARRANTY. '0`8 20'-6"AFF EXIST IN THE SUBSTRATE,WHERE THE EIFS ADJOINS DISSIMILAR PART 2 PRODUCTS CONSTRUCTION,AND AT FLOOR LINES IN MULTILEVEL WOOD FRAME T.O. PARAPET - 2.01 MANUFACTURERS CONSTRUCTION.THE EIFS SHALL TERMINATE AT THE EXPANSION 19'-2"AFF M - REFER TO MASTER FINISH SCHEDULE JOINT TO PROVIDE APPROPRIATE JOINT SIZE(SEE DETAILS)AND ALL M ORANGE LIGHT BOARD EDGES SHALL BE COATED WITH APPROPRIATE GROUND COAT ORANGE LIGHT FIXTURE LX- A. DRYVIT SYSTEMS, INC. AND MESH IN ACCORDANCE WITH STANDARD"BACKWRAPPING" FOR EXTERIOR FINISHES PROCEDURE.APPROPRIATE SEALANT/PRIMER AND BACKER SHALL BE FIXTURE LX-1 2.o2ADHEsivEs I A. DISPERSION ADHESIVE-NONCEMENTITIOUS,ACRYLIC INSTALLED AFTER GROUND COAT IS FULLY DRY TO PREVENT ANY THIN BRICK BASED ADHESIVE. WATER FORM GETTING INTO OR BEHIND THE SYSTEM. EB-1 2.03 INSULATION BOARD H. USE OF PLASTIC OR METAL CORNER BEADS,STOPBEADS, ETC., IS A. NOMINAL 1.0 Ib/cubic feet(16 kg/cubic meter)EXPANDED FORBIDDEN. POLYSTYRENE(EPS)INSULATION BOARD IN COMPLIANCE WITH I. APPLY APPROPRIATE GROUND COAT OVER THE INSULATION BOARD o CANOPY TO BE H ASTM C 578 TYPE I REQUIREMENTS,AND EIMA GUIDELINE WITH PROPER SPRAY EQUIPMENT OR A STAINLESS STEEL TROWEL TO H SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS) A UNIFORM THICKNESS OF APPROXIMATELY 1/16".WORK PAINTED EP-5 INSULATION BOARD. HORIZONTALLY OR VERTICALLY IN STRIPS OF 40",AND IMMEDIATELY 2.04 BASECOAT EMBED STANDARD REINFORCING MESH INTO THE WET GROUND COAT. THE MESH SHALL BE DOUBLE WRAPPED ATALL CORNERS AND REFER TO MASTER LIGHT FIXTURE A. ONE-COMPONENT POLYMER MODIFIED CEMENTITIOUS OVERLAPPED NOT LESS THAN 2-1/2"AT MESH JOINTS .AVOID WRINKLES BASE COAT WITH FIBER REINFORCEMENT AND LESS THAN 33% B.O. CANOPY IN THE MESH.THE FINISH THICKNESS OF THE GROUND COAT SHALL BE 9'-4"AFF SCHEDULE FOR EXTERIOR LIGHT PORTLAND CEMENT CONTENT BY WEIGHT. SUCH THAT THE MESH IS FULLY EMBEDDED.ALLOW GROUND COAT TO THOROUGHLY DRY BEFORE APPLYING PRIMER OR FINISH. T.O. WALL 2.05 REINFORCING MESHES 8'-0"AFF. FIXTURE SPECIFICATIONS A. STANDARD MESH J. DUPLICATE INSTALLATION PROCESS NOTED IN 3.01 M USING T.O. WINDOW G 1. MESH-NOMINAL 4.5 oz/sq.yd. (163 g/sq.meter), STANDARD MESH CREATING SECOND MESH LAYER AND ADDITIONAL 6'-2"AFF SYMMETRICAL, INTERLACED OPEN-WEAVE GLASS FIBER IMPACT RESISTANCE.ALLOW TO DRY BEFORE APPLICATION OF EITHER FABRIC MADE WITH MINIMUM 25 PERCENT BY WEIGHT ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH STO PRIMER(OPTIONAL)OR STO FINISH. THIN BRICK DRYVIT MATERIALS. K. IF A PRIMER IS USED,APPLY WITH BRUSH, ROLLER OR PROPER DOOR TO BE VENEER B. HIGH IMPACT MESH SPRAY EQUIPMENT OVER CLEAN, DRY GROUND COATAND ALLOW TO PAINTED EB-1 1. INTERMEDIATE MESH (MESH C)-NOMINAL 11.0 oz/sq.yd. DRY THOROUGHLY BEFORE APPLYING FINISH. P.APPLY FINISH HIGH IMPACT, INTERWOVEN, OPEN WEAVE GLASS FIBER DIRECTLY OVER THE GROUND COAT(OR PRIMED GROUND COAT)ONLY FABRIC WITH ALKALINE RESISTANT COATING FOR AFTER THE GROUND COAT/PRIMER HAS THOROUGHLY DRIED.THE COMPATIBILITY WITH DRYVIT MATERIALS. FINISH SHALL BE APPLIED BY SPRAYING, ROLLING OR TROWELING WITH A STAINLESS STEEL TROWEL, DEPENDING ON FINISH SPECIFIED. F 2.06 PRIMER GENERAL RULES FOR APPLICATION OF FINISHES AREAS FOLLOWS: FINISHED FLOOR EP-2 F A. PRIMER 0'-0"AFF. Mark Description Date ACRYLIC BASED PRIMER(FORACRYLIC BASED FINISHES) 1. USE A CLEAN, RUST-FREE, HIGH-SPEED MIXER TO THOROUGHLY STIR THE FINISH TO A UNIFORM CONSISTENCY FOR SITE PLAN APPROVAL 04/15/21 (SMALLAMOUNTS OF CLEAN WATER MAY BE ADDED TO AID EIFS TO BE PAINTED GAS METER TO COOLER TO HAVE FRAMED 2.07 FINISH COAT WORKABILITY). EP-3 BE PAINTED WALL WITH EIFS FINISH EF-3 A. ACRYLIC BASED TEXTURED WALL COATING. SEE E.I.F.S. 2. AVOID APPLICATION INDIRECT SUNLIGHT. � 2021 POPEYE'S FINISH SCHEDULE FORMULAS FOR FINISH COLOR. 3. APPLY FINISH IN A CONTINUOUS APPLICATION,ALWAYS EP-2 EXTERIOR MATERIALS&FINISH SCHEDULE-TO BE USED WITH FS-LEGACY(1846) WORKING TO A WET EDGE. 03.07.21 CODE MATERIAL LOCATION SOURCE PRODUCT COLOR DIMENSION ADDITIONAL INFORMATION 2.08 JOB MIXED INGREDIENTS 4. WEATHER CONDITIONS AFFECT APPLICATION AND DRYING WALL FINISHES AND PAINT A. PORTLAND CEMENT: ASTM C 150,TYPE I. TIME. HOT OR DRY CONDITIONS LIMIT WORKING TIME AND Rear D l e v a t i o n NICHIHA FI ALEXANDRIA BUFF 3/4' 770.789.8228 popeyes@nichiha.comBER VINTAGE BRICK 73/8"x21/2"x CONTACT:MATT STEPHENSON M: B. WATER: CLEAN AND POTABLE. ACCELERATE DRYING AND MAY REQUIRE ADJUSTMENTS IN THE Scale: 1/4" 011 CEMENT Building Design & Documentation ©2021-2022 Jeffrey Parker Architects Inc. SCHEDULING OF WORK TO ACHIEVE DESIRED RESULTS; COOL EB-1 FACE BRICK ACCENT TOWER BRICK ALTERNATE OR DAMP CONDITIONS EXTEND WORKING TIME AND RETARD OPTION: 8-1/8"x 2-1/16"x CONTACT: DRYING AND MAY REQUIRE ADDED MEASURES OF PROTECTION CREATIVE ALTERNATE OPTION:THIN BRICK FLAGSTAFF 5/8" popeyestile@creativematerialscorp.com AGAINST WIND, DUST, DIRT, RAIN AND FREEZING. CORPORATION 800.207.2967EM7797 Jeffrey5. AESTHETIC"U"-GROOVES MAYBE DESIGNED INTO THE SYSTEM. (A MINIMUM OF 3/4"INSULATION BOARD MUST BE EF-1 EXTERIOR WOOD SIDING FRONT FACADE NICHIHA FIBER VINTAGE WOODAWP3030 CEDAR 17-7/6"Hx119- CONTACT:MATTSTEPHENSONM: Parker LEFT AFTER ANY GROOVES ARE CUT). EXTERIOR WALLS CEMENT 5/16"L 770.789.8228 popeyes@nichiha.com 6. "W(RILLED TEXTURE)FINISHES MUST BE FLOATED WITH A D D PLASTIC TROWEL TO ACHIEVE THEIR RILLED TEXTURE. MAIN WALL SURFACE CONTACT:RODGER LIPPMAN C: 11 G 11 EP-1 EXTERIOR PAINT ABOVE WAINSCOT BENJAMIN ULTRA SPEC 500 EGGSHELL WHITE OC-125 MOONLIGHT WHITE 648.702.0239 / / 7. AVOID INSTALLING SEPARATE BATCHES OF FINISH SIDE-BY- ACCENT TRIM MOORE rodger.lippman@benjaminmoore.com architects SIDE. 8 . APPLY FINISH COLOR TO EIFS MIX AND APPLY TO WALL. BRICK TOWER METAL BENJAMIN CONTACT:RODGER LIPPMAN C: EP-2 EXTERIOR PAINT COPING MOORE ROOT BEER CANDY 2105-20 648.702.0239 COLOR TO MATCH EXTERIOR FINISH SCHEDULE COLORS. rodger.lippman@benjaminmoore.com ARCHITECTURE PLANNING ENGINEERING L. EXTERIOR INSULATION AND FINISH TEXTURE SYSTEM:APPLY HIGH IMPACT SYSTEM ADJACENT TO DOORS FOR ADDITIONAL IMPACT EXTERIOR WAINSCOT, BENJAMIN ULTRA SPEC 500 EGGSHELL GRAY"HC-170 STONINGTON GREY CONTACT848702 RLIPPMANC: EP-3 EXTERIOR PAINT S PAINT,A MOORS 855 28th Street SE Phone: 616-241-0090 RESISTANCE, USING INTERMEDIATE MESH. USE THE STANDARD DUMSPTER WALLS rodger.lippman@benjaminmoore.com Grand Rapids MI 49508 Fax: 616-241-0098 SYSTEM SPECIFICATIONS AT ALL OTHER LOCATIONS. C C BOLLARDS,PYLON POLE BENJAMIN CONTACT:RODGER LIPPMAN C: EP-4 EXTERIOR PAINT AND DIRECTIONAL SIGN MOORS SAFETY YELLOW 648,702,0239 Building for: POLES rodger.lippman@benjaminmoom.com METAL/PAINT DRIVE THRU WINDOW PROVIDED BY PROVIDED BY MANUFACTURER ORANGE. BY MANUFACTURER C. PROVIDED BY MANUFACTURER POPEYES CANOPY MANUFACTURER PROVIDED BY MANUFACTURER EP-6 METAL/PAINT BUILDING CANOPIES PROVIDED BY PROVIDED BY MANUFACTURER TEAL.PANTONE#326 C.PROVIDED PROVIDED BY MANUFACTURER MANUFACTURER BY MANUFACTURER BENJAMIN CONTACT:RODGER LIPPMAN C: MERIDIAN, ID B EP-7 EXTERIOR PAINT DUMSPTER GATES MOORS FACTORY FINISH BLACK 848.702.0239 0 rodger.lippman@benjaminmoore.com P P B EP-8 EXTERIOR PAINT ALL EXTERIOR WALLS BENJAMIN ALIPHATIC ACRYLICC URETHANE-GLOSS ANTI-GRAFFITTI COAT CONTACT$.RODGER 2 LIPPMAN C: Exterior rI O r Elevations V Va t I O n S MOORS V500-00 rodger.lippman@benjaminmoore.com EXTERIOR DOORS MAIN TO BE Issued Drawing No. DP-1 DOOR ENTRANCE IORDOOR SIDE PROVIDED BY PURCHASED FROM ORANGE.PANTONE#3564 C. ENTRANCE MANUFACTURER MANUFACTURER IN PROVIDED BY MANUFACTURER 03/11/21 ORANGE FINISH TO BE ES-1 SHUTTERS EXTERIOR WALLS PROVIDED BY PURCHASED FROM TEAL.PANTONE#326 C.PROVIDED PROVIDED BY MANUFACTURER Project NO. MANUFACTURER MANUFACTURER IN BY MANUFACTURER TEAL FINISH A3 , 0 A 4 1 2 3 4 5 6 7 5 9 10 11 12 13 14 15 401 64 } ,+ , �. y*� __; �ter:.-.- _ � �r•,�r � . ' r '�`�. - ,'�• - L9 it - _ I ! i 9 CLE RAKCE `U z. Ilk } IL -I. . MI