Loading...
Narrative Larson Architects, P. A. Architecture and Real Estate Planning 210 Murray Street, Boise, Idaho 83714 Phone: (208) 376-7502 Fax: (208) 658-0224 March 5, 2021 City of Meridian Planning Department 33 E. Broadway Ave., Suite 102 Meridian, Idaho 83642 RE: LOST RAPIDS LOT 13 Dear Planner, On behalf of Lost Rapids Development, LLC we are pleased to submit the attached application and supporting materials for a new multi-tenant commercial building for Certificate of Zoning Compliance and Design Review. This follows the recent CUP approval for the drive-thru lane, case number H-2021- 0001. This project will consist of a new single story building located at 6097 N. Ten Mile Road in Meridian. The applicant is proposing to construct a new 9,493 SF single story building. The site is located just south of the intersection of Chinden Road and Ten Mile Road. Site access is proposed from a shared access drive that is available to all the building pads surrounding the new Costco facility. Vehicular traffic will enter the site from the Southeast corner of the site from the shared access drive. Two rows of parking are available directly off this entry, or users can continue east to enter the Drive- Thru lane. This lane travels behind the proposed building and exits back into the parking layout on the North side. Anticipated restaurant users will have access to patio areas on the North and South sides of the building. The front of the building (West) has an enlarged sidewalk to allow for access to multiple tenant spaces. The sidewalk continues partially on the East side to allow for service access to the back of the future tenants. This sidewalk also connects across the drive-thru lane to the existing sidewalk on Ten Mile Road. Garbage facilities are located in the Southeast corner of site, the location of which has been coordinated with Republic Services. Building elevations take advantage of variations in height and wall plane to provide visual interest. Larger tenant spaces are anticipated at the ends of the building and have been given more exterior articulation in the form of roof shapes and horizontal modulation. Between these end caps, the parapet wall is a consistent height and features material changes to break up the massing of the wall. In an effort to maximize structural efficiency and leasable interior areas, this wall is 75’ long. We are requesting a Design Standards Exception to ASM 3.1B to have this straight section at the interior of the building for these reasons. Materials include a manufactured stone veneer wainscot, a light-textured stucco wall finish, fiber-cement ship lap siding with a wood grain texture, and standing seam metal roofing. The stucco finish will feature reveal lines to break up the mass of the material and tie into other building elements. Glass storefront patterns vary in height across the front of the building to provide visual interest. Covered steel awnings are located above each entry for weather protection, and protrude from the building 36” These awnings also vary in height to follow the storefront glass pattern. The two architectural features required by ASM 2.3A are met by the fenestration pattern variation and the canopies. Variations in height of the storefront also serve to accentuate future tenant entry points. HVAC units are proposed to be located on the roof, screened by a tall parapet wall. Parapet walls are interrupted by shed roof elements of varying heights to break up the elevations. Parapets are capped with a continuous metal coping cap over the light textured stucco wall system. This application has been prepared in coordination with the Meridian Design Manual. We expect that you will find it complete and generally as discussed. Should you have any questions don't hesitate to contact us. Sincerely, R. Damon Beard Larson Architects, P.A. 210 Murray Street Boise, ID 83714 tel. 208.376.7502 fax 208.658.0224