Loading...
Lost Rapids Drive-Through CZC, DES A-2021-0051 Page 1 DATE: 4/21/2021 TO: Damon Beard Larson Architects FROM: Stacy Hersh, Assistant Planner 208-884-5533 SUBJECT: A-2021-0051 Lost Rapids Drive-Through CZC, DES LOCATION: 6097 N. Ten Mile Road I. PROJECT DESCRIPTION The Applicant requests approval of Certificate of Zoning Compliance (CZC) and Administrative Design Review (DES) applications to construct a 9,493 square foot multi-tenant building shell with a drive-through restaurant for one of the tenant spaces on 1.606-acre of land in the C-G zoning district. II. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review are approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Site Specific Conditions of Approval 1. Business hours of operation within the C-G zoning districts shall be limited from 6 am to 11 pm when the property abuts a residential use or district as set forth in UDC 11-2B-3A4. 2. All ground-level mechanical equipment must be screened to the height of the unit as viewed from the property line; all rooftop mechanical equipment must be screened as viewed from the farthest edge of the adjoining right-of-way. 3. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. CERTIFICATE OF ZONING COMPLIANCE REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 4. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 5. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 6. The site plan prepared by Larson Architects, P.A. on March 5, 2021, labeled SP1.0, is approved by the City of Meridian Planning Division as shown in Exhibit A with the following conditions: ➢ Per CUP H-2021-0001, depict a minimum 5-foot wide walkway from the sidewalk on the west boundary of the site to the sidewalk in front of the building; the walkway shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks as set forth in UDC 11-3A-19B.4 unless otherwise approved by the Planning and Zoning Commission through subsequent Conditional Use Modification application. ➢ The pedestrian walkway crossing the vehicular driving surface on the east side shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks (currently depicts striping) as set forth in UDC 11-3A-19B.4 The changes noted above shall be incorporated on the plans submitted with the building permit application. 7. The landscape plan prepared by KM Engineering on April 15, 2021, labeled L1.0, is approved by the City of Meridian Planning Division as shown in Exhibit B with the following conditions: ➢ The required street buffer landscaping improvements approved with the Lost Rapids Subdivision along N. Ten Mile Road shall be completed in accord with UDC 11-3B-7 prior to issuance of Certificate of Occupancy of the building. 8. The elevations prepared by Larson Architects, P.A. on April 14, 2021, labeled A3.0, are approved by the City of Meridian Planning Division as shown in Exhibit C with the following notations: The applicant requests a design standard exception to the following Goal contained in the Architectural Standards Manual: - Goal 3.1B “Qualifying modulation must be at least 6-inches in depth, be at least 8-inches in width or height (whichever is narrowest), and occur in total for 20% of overall façade elevation. For buildings with façades less than 150-feet, horizontal modulation must occur no less than every 30-feet. For buildings with façades greater than or equal to 150-feet, horizontal modulation must occur no less than every 50-feet.” The larger tenant spaces are anticipated at the ends of the building, which is why these spaces have been given more exterior articulation in the form of roof shapes and horizontal modulation. Between these end caps, the parapet wall is a consistent height and features material changes along with 36” covered steel awnings located above each store front entry to break-up the massing of the wall in order to maximize structural efficiency in these leasable interior areas. Staff finds that the applicant has met the intent of this goal by providing fenestration, stone, a stucco finish with reveal lines, and metal awnings that help to break-up the mass of the building while blending nicely with the other building elements. 9. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 10. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 11. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 12. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Page 3 13. The applicant shall recognize the recorded Declaration of Easements, Covenants, Conditions and Restrictions for this development that establish cross-parking easements for lots in certain groups within the development (Inst. 2020-071547, Amended Inst. #2020- 171404). This lot (Lot 13) is grouped with lots 14 and 15 to the south and shares a perpetual, non-exclusive cross-parking easement with those lots. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (H-2018-0004, DA Instrument #2018-079970; FP-2020-0045; CUP H-2021-0001). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. 7. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for a drive-through establishment and a restaurant as set forth in UDC 11-4-3-11 and UDC 11-4-3-49. III. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before May 7, 2021, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. IV. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until April 21, 2022. Page 4 V. EXHIBITS A. Site Plan (date: 3/5/2021) Page 5 B. Landscape Plan (date: 4/15/2021) Page 6 C. Building Elevations (date: 4/14/2021)