Loading...
Building Elevations_A3.01BUILDING ELEVATIONS rudeenarchitectsBoise + San Francisco 199 North Capitol Blvd. Suite 602 Boise, Idaho 83702 Phone 208-338-1413 Fax 208-336-0371 info@rudeenarchitects.com architecture planning project management PRELIMINARY A B C D E F G H J K L M 1 2 3 4 5 76 8 9 10 11 12 13 14 15 THESE DESIGNS AND DRAWINGS ARE THE EXCLUSIVE PROPERTY OF RUDEEN & ASSOCIATES ARCHITECTS, AND ARE NOT TO BE USED OR DUPLICATED WITHOUT PERMISSION. COPYRIGHT © 2020, ALL RIGHTS RESERVED. Project Number: Revisions: Date: File Name: Scale: Sheet Title: 2023 FEBRUARY 03, 2021 AS NOTED - A3.01 Building Remodel & Addition: 2810 E. Franklin Road Meridian, Idaho OFFICE & WAREHOUSE FLEX SPACE BUILDING SCALE:SOUTH ELEVATION1/4" = 1'-0"A1 SCALE:WEST ELEVATION1/4" = 1'-0"G1 4 MBCI / -TBD EXTERIOR FINISH SCHEDULE SYMB.MATERIAL / DESCRIPTION FINISH / COLOR NOTES 1 CORONADO STONE VENEER TBD - 3 MBCI 7.2 OR PBD PANEL TBD - 2 STUCCO TBD - 7 CONCRETE -- 8 FASCIA / STUCCO PAINT - 10 PRE-FINISHED METAL RAINWATER GUTTER & LEADER -- 13 WALL MOUNTED LIGHT. RE: ELECTRICAL DRAWINGS.MFR.- 6 METAL AWNING PAINT - 9 PRE-FINISHED METAL PARAPET CAP TBD 11 KNOX BOX, RECESSED MOUNT, VERIFY MOUNTING HEIGHT AND PLACEMENT LOCATION WITH FIRE DEPARTMENT - 12 SIGNAGE BY OTHERS - 5 ALUMINUM STOREFRONT SYSTEM W/ LOW-E GLAZING ANODIZED BRONZE - 14 DOWNSPOUT NOZZLE MFR.- 15 ADDRESS LETTERING. RE: DETAIL G9/A4.01. -- 100'-0" T.O. (E) F.F. 123 6 1 2 5 46 16 HEAVY DUTY OVERHEAD DOOR, 20 GA. STEEL INSULATED (R-10 MIN.) RE: DOOR SCHEDULE -- 12 15 11 9 9 107'-6" T.O. (E) BEARING 115'-6" T.O. PARAPET 100'-0" T.O. (E) F.F. 107'-6" T.O. (E) BEARING 115'-6" T.O. PARAPET 116'-9" T.O. PARAPET 91'-6" T.O. (E) CONCRETE 114'-6" T.O. PARAPET