Loading...
RE_ Orchard Park Multi-Tenant Building DR CommentsFrom:Mandie Brozo To:Sonya Allen Subject:RE: Orchard Park Multi-Tenant Building DR Comments Date:Wednesday, March 10, 2021 11:54:13 AM Attachments:image001.png image003.png image004.png External Sender - Please use caution with links or attachments. Sonya,   Due to the size of the PDF’s I’ve had to send them via WeTransfer. Below is a link to download the revised building elevations, trash enclosure, detail of the bicycle rack,  revised site plan with the correct scale, not user error , and area of the lot/site.   This link will expire 3/17/21   Download link https://we.tl/t-AA9IQIhV1o     2 items 08 - Site Plan BLDG 1 - DR & CZC.pdf 10 - Elevations.pdf   In addition to the revised plans, I have also provided some dialog showing how this buildings design complies with the City of Meridian Design Standards. Please let me know if I have misinterpreted any of these items.   1.3A – Revised west elevation to incorporate more both horizontal reveals and material change for the overall building façade. We did keep some of the taller corner architectural piers to breakup the overall building plane and create large architectural massing anchoring the north and south elevations.   2.3A – Canopies and metal eyebrows over storefront doors provide two architectural features at the pedestrian scale. In addition there are two patios proposed for the southern tenant and center tenants. These patios will include tables and chairs to further surplus the pedestrian scale.   3.1A - Each building facade provide multiple façade plane variations, and either a canopy or metal eye brow projection above the storefront doors.  The overall building massing has been further articulated with the use of additional corner storefront system and clerestory windows.   3.1B – The building modulations referenced in 3.1A meet all requirements of this section.   5.1F – Where the building materials return back to the building at grid line C and E the finish on the perpendicular walls will match the finish on the adjacent surface to convey the appearance of mass.   Please let me know if these revisions and responses do not meet the requirements for DR and CZC.   Thank you for all your help.   Mandie Brozo | CSHQA Architecture – Project Manager D 208.429.4064   From: Sonya Allen <sallen@meridiancity.org>  Sent: Friday, March 5, 2021 2:22 PM To: James Marsh <james.marsh@cshqa.com> Cc: Mandie Brozo <mandie.brozo@cshqa.com> Subject: Orchard Park Multi-Tenant Building DR Comments   Hi James,   I’ve finished my review of the Design Review application. Please revise the elevations per the following design standards or let me know how they comply: west elevation Does the brick meet this standard?   Thanks, Sonya All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law.