Loading...
10 - Elevations REVISED APPROVED SA3,000 SF SUITE 101 C E FD G 46' - 2 1/2"24' - 0"21' - 6"20' - 0"20' - 0"39' - 7 1/2" BA 2 3 4 5' - 0"32' - 1"37' - 1"1,300 SF 1,200 SF 1,500 SF 1,800 SF 3,500 SF FS RISER 171' - 4" 1 37' - 1"37' - 1"74' - 2"4' - 0"37' - 0"3' - 0"28' - 6"1' - 3"7' - 1 3/4"10' - 8 3/4"7' - 10 1/4"18' - 9 1/2"5' - 0"10' - 8 3/4"4' - 0"33' - 0"4' - 0"18' - 4 1/2"5' - 0"23' - 10"5' - 0"19' - 0"5' - 0"----SD53-1 SD53-2SD53-3SD53-4 SUITE 102 SUITE 103 SUITE 104 SUITE 105 SUITE 106 1' - 8 1/8" SD52-1 SD52-2SD52-3SD52-4 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK FLOOR PLAN 11 FEBRUARY, 2021 SD21 BUILDING ONE 20233 1225 W CHINDEN BLVD MERIDIAN, ID JLH T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" C E FD GBA T.O. PARAPET 3 127' -0" T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" D-3E-1 D-3 A-4A-4D-3D-3 B-8 C-5C-5C-5C-5C-5C-5C-5 E-1 A-4E-1E-1 E-2A-4 E-1 B-8 C-5 B-8G-8 G-8 G-8 G-8 G-8B-8 B-8 B-8 B-8 G-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" 234 1 T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1 A-4 A-4C-5 D-3 E-1E-2 A-4G-8 G-8 G-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" 2 3 41 T.O. PARAPET 3 127' -0" T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1D-3 B-8 D-3 C-5 E-1 A-4 B-8 E-1 G-8 G-8 C-5C-5 B-8 B-8 G-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" CEFDG B A T.O. PARAPET 3 127' -0" T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1 A-4E-1 B-8 A-4 D-3E-1 F-2F-2 F-2 F-2 E-1 F-2 E-1 A-4B-8D-3 G-8 G-8 B-8G-8G-8 G-8 E-1E-1 F-2 MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR A X-X SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK ELEVATIONS 11 FEBRUARY, 2021 SD52 BUILDING ONE 20233 1225 W CHINDEN BLVD MERIDIAN, ID JLH METAL:METAL SIDING. B METAL:TRIM AND FACIA. C ALUMINUM STOREFRONT D INTERSTATE BRICK: E EIFS: 1 SHERWIN WILLIAMS -GREY 3 COLOR: MIDNIGHT BLACK 4 BERRIDGE SDECK -CHARCOAL GREY 5 BLACK ANODIZED ALUM. F HALLOW METAL DOOR: G METAL: COPING 2 SHERWIN WILLIAMS -DARK GREY 6 SHERWIN WILLIAMS -WHITE 1/8" = 1'-0"1ENTRY ELEVATION 1/8" = 1'-0"2NORTH ELEVATION 1/8" = 1'-0"3SOUTH ELEVATION 1/8" = 1'-0"4WEST ELEVATION T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" C E FD GBA T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" D-3E-1 D-3 A-4A-4D-3D-3 B-8 C-5C-5C-5C-5C-5C-5C-5 E-1 A-4E-1E-1 E-2A-4 E-1 B-8 C-5 B-8 A B C D E F G T.O. PARAPET 3 127' -0" G-8 G-8 G-8 G-8 G-8B-8 B-8 B-8 B-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" 234 1 T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1 A-4 A-4C-5 D-3 E-1E-2 A-4 4 3 2 1 G-8 G-8 G-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" 2 3 41 T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1D-3 B-8 D-3 C-5 E-1 A-4 B-8 E-1 T.O. PARAPET 3 127' -0" G-8 G-8 C-5C-5 B-8 B-8 T.O.PARAPET 1 122' -0" T.O. PARAPET 2 125' -0" CEFDG B A T.O. STOREFRONT 110'-0" T.O. FINISH FLOOR 100'-0" E-1 A-4 E-1 B-8 A-4 D-3E-1 F-2F-2 F-2 F-2 E-1 F-2 E-1 A-4 ABCDEFG T.O. PARAPET 3 127' -0" B-8D-3 G-8 G-8 B-8G-8G-8 G-8 E-1E-1 F-2 SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK RENDERED ELEVATIONS 11 FEBRUARY, 2021 SD53 BUILDING ONE 20233 1225 W CHINDEN BLVD MERIDIAN, ID JLH MATERIALS & FINISH SCHEDULE: MATERIAL FINISH/COLOR A X-X METAL:METAL SIDING. B METAL:TRIM AND FACIA. C ALUMINUM STOREFRONT D INTERSTATE BRICK: E EIFS: 1 SHERWIN WILLIAMS -GREY 3 COLOR: MIDNIGHT BLACK 4 BERRIDGE SDECK -CHARCOAL GREY 5 BLACK ANODIZED ALUM. F HALLOW METAL DOOR: G METAL: COPING 2 SHERWIN WILLIAMS -DARK GREY 6 SHERWIN WILLIAMS -WHITE 1/8" = 1'-0"1ENTRY ELEVATION 1/8" = 1'-0"2NORTH ELEVATION 1/8" = 1'-0"3SOUTH ELEVATION 1/8" = 1'-0"4WEST ELEVATION NORTHEAST PERSPECTIVE SOUTHEAST PERSPECTIVE NORTHWEST PERSPECTIVE SOUTHWEST PERSPECTIVE SCHEMATIC DESIGN DRAWN: 200 W BROAD STREET, BOISE,ID ORCHARD PARK PERSPECTIVES 11 FEBRUARY, 2021 SD55 BUILDING ONE 20233 1225 W CHINDEN BLVD MERIDIAN, ID JLH DMG REAL ESTATE PARTNERS, LLC 30 JULY, 2020 pg. LINDER VILLAGE LIBRARY 20139 Scale: 1" = 20'-0" DESIGN REVIEW6"6"2"12" CLR. 2" 30"12"CLR.3"2" CONCRETE SOAP BLOCK, SLOPE TO DRAIN (2) #5 CONT. BOND BEAM AT TOP GROUT TOP COURSE SOLID (2) #5 CONT. BOND BEAM AT 2'-0" O.C. #6 VERT. BAR @ 16" O.C. 1/2" FIBER EXPANSION JOINT 6" CONCRETE SLAB WITH 13 X 13 D5 X D5 W.W.F. #5 DOWEL AT 24" O.C. EXTEND 36 BAR DIAMETERS OVER TOP OF FOOTING, ALTERNATE HOOKS GROUT SOLID CONC. FOOTING 12" X 30" W/ (2) #5 HORIZ. (2) #5 CONT. 6'-0" T.O. CMU 0'-0" T.O. PAVEMENT 24"STONE VENEER OVER METAL LATH AND GROUT BED, RE: SD51 E-3 T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 E-3 POST, PAINT BLACK, TYP.-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" D-8 E-3 CONCRETE SOAP BLOCK SLOP TO DRAIN-1SD52T.O. FINISHED FLOOR 100' -0" T.O. CMU 106' -0" B-4 C-6 B-4 POST, PAINT BLACK CONCRETE SOAP BLOCK SLOP TO DRAIN D-8 1. LONGBOARD SIDING, 6" CHANNEL PROFILE, COLOR: LIGHT FIR 2. WESTERN RED CEDAR TIMBER, COLOR: STORM SEALANT: 20041 3. 4. ANODIZED ALUMINUM, COLOR: BLACK 5. NATURAL COLOR 6. BERRIDGE 'M' DECK 7. SW BUNGALOW BEIGE 8. DARK GRAY A. WOOD B. METAL C. CORRUGATED METAL D. CONCRETE E. F. STUCCO X -#MATERIAL LEGEND 1/2" = 1'-0"1TRASH ENCLOSURE - WALL SECTION 1/2" = 1'-0"3ENCLOSURE SIDE - ELEVATION 1/2" = 1'-0"4ENCLOSURE REAR - ELEVATION 1/2" = 1'-0"2ENCLOSURE FRONT - ELEVATION TRASH ENCLOSURE SD54 5 BIKE RACK DETAIL NTS