Loading...
PZ - Landscape Plan ORIGINAL SKRVEY ON FILE A- CK ENGIN-C2ING 7 8 °,°O, S�OF o1D�OOOo 3 q 6 3 3 5 EA SB 5 3 3 3 0° GG 6 GA 3 GG 3 2 EA SB 15 3 M M 5 2 EA sB 15 END GB 3 1416 �� �„ START 3 6 3 START 3 VG 3 PRELIMINARY 5 $ G SB 5 M 5 SB 5 6 VG 55 6 5 VG SB GB GB GB VG SS M GB N OT FO Ft M M PM M GB M GB �- �� " CONSTRUCTION q + + + + + + + + ,. �SB PI \ + + + + + + + + + + + + + + + + . 00 � ypp0 z + .. 4 .y. .., .. ., - \ 4 4 PI 4 PM 4 PI .. 'a / i 3 OOO0000 00000000°°� > 6 3 EA • ,••., 4 PF 4f-PI +4 PF t 4FPI ��4 r a�Pl pP 4 PI -r " + +4 + + + + + + + + + + f'f' + + + + + Q ' + + + + Q + + + + + + + + + + + + + + + + ` Z 3 + + + + + + t ot?o . + + + + + + + + + + + PM + + + + + + + + + + + + + + + + + + + + + + + + + 3 0 + + + •+ + + + + + + + + + + + + + + + + + +� Q ° + + + + + + + + + + + + + + +� + + '+ Z + + + + + + + + + i.`. , ' GB w 3 2 M 3 5 + + + + - + + + + + + + + + + + + g + + + + 6 + + + + + + + + + + + + + Q G START 56 56 / END + U r + + + + END E o M + 1 1 oin W 6 + E. o � vo00 Ecn O + L E 7 C a 1 �i O w ++I ': AD - AG E. LIBERATOR CT. TT E. LIBERATOR LANE AG TT o o o � oO�DCD Lu 5 .s CL0 0 � Yc� 0 + + U O) 0 s (0 - K s � L O yh C U.-II � s N 513 Q + PM 1 - - - - - - - - w N.4 r C, z o _ 0 A END - O + Z ' 3 i - 3 Z 3 ... M L 2 w Qo + Lu t'I' MA w 6 ++� III M 3 / I I I I I I Q H a F+++ ,t.. 8 PM / Z Uj ++ O 6 3 I 0- ++ 2 513 / + 5 Q to K G3 6 I I!I 6 3 / I OI OI I I OI OI Y+ EA5 ss + GB 32 O D28 O O O I I 23 I 24 I 25 o M 3) ozzw END + END START END 4 3 START 'I 10 4START 4 4 w z w Copyright c�2021 z All rights reserved. Reproduction or use in any form o or by any means without written permission of 2 T LANDSCAPE PLAN Breckon Land Design Inc is unlawful and subject to Jcriminal prosecution. 1 N 40 0 40 80 120 a a SCALE: I"- 40'-0" PROJECT INFORMATION LANDSCAPE LEGEND10 LANDSCAPE NOTES: TURF AREA PREPARATION NOTES■ TOTAL 51TE AREA: 228 7G5 S.F. (5.25 ACRES) Lu 1. GONTRAGTOR SHALL REPORT TO LANDSGAPE ARGHITEGT ALL CONDITIONS WHIGH IMPAIR AND/OR PREVENT THE PROPER EXEGUTION OF 1. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. PLANTS TO BE INSTALLED a THIS WORK, PRIOR TO BEGINNING WORK. 2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY BUILDING SETBACKS: + 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSGAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE DIMENSION AND STIGKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. FRONT: 25' o MATERIALS OF SIMILAR SIZE AND GHARAGTER MAY BE CONSIDERED IF SPEGIFIED PLANT MATERIALS GAN NOT BE OBTAINED. 3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE. BACK: 12' w 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. 10 4. REDUGE ELEVATION OF PLANTING 501L TO ALLOW FOR SOIL THIGKNESS OF SOD. SIDE: 3' H 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSGAPE ARGHITEGT PRIOR TO GON5TRUGTION START-UP. 5. UNGHANGED SUBGRADES: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATING GRADING OR VISION TRIANGLE z 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. SURFACE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: AVERAGE BUILDING LOT 51ZE: TIg8 SQUARE FEET 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE A. REMOVE EXISTING GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFACE 501L. -------------------- GUT EDGE AS DETAILED REJEGTED IF NOT IN A SOUND AND HEALTHY CONDITION. B. LOOSEN SURFACE 501L TO A DEPTH OF AT LEAST 6 INGHES. APPLY 501L AMENDMENTS AND FERTILIZERS AGGORDING TO NUMBER OF PARKING AND BICYCLE STALLS REQUIRED/PROVIDED: O/O 1010 7. IN THE EVENT OF A PLANT COUNT DISGREPANGY, PLANT SYMBOLS SHALL OVERRIDE SGHEDULE QUANTITIES AND GALL OUT SYMBOL PLANTING 501L MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INGHES OF SOIL. TILL 501L TO A HOMOGENEOUS MIXTURE OF BERM Q Lu NUMBERS. FINE TEXTURE. LINEAL FEET OF STREET FRONTAGE (NOT INCLUDING LOGAL STREETS, 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF LARGE (2" MINUS) BARK MULCH. SUBMIT SAMPLE FOR 6. APPLY 501L AMENDMENTS DIREGTLY TO SURFACE SOIL BEFORE LOOSENING. IN WHIGH HAVE NO STREET TREE REQUIREMENTS, BUT INCLUDING 6'-0" VINYL FENGE w APPROVAL. A. REMOVE STONES LARGER THAN I INGH IN ANY DIMENSION AND STIGKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. PARKWAY ALONG E. LIBERATOR LANE): C160 L.F. z cf. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF AGGEPTANGE BY THE OWNER. B. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 6'-0" TUBE STEEL FENGE O ° REPLAGE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY GONDITION IMMEDIATELY WITH THE SAME 51ZE AND SPECIES AT NO 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM 5URFAGE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. GRADE TO TOTAL NUMBER OF TREES PROVIDED: 3q co LL GOST TO THE OWNER. WITHIN PLUS OR MINUS 1/2 INCH OF FIN15H ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FIN15H TOTAL NUMBER OF TREE SPECIES: 6 - - PROPERTY LINE (VERIFY)10. FIN15H GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINAGE IN AGGORDANGE GRADES. LIMIT FINISH GRADING TO AREAS THAT CAN BE PLANTED IN THE IMMEDIATE FUTURE. Ir M Q W (� WITH THE 51TE GRADING PLAN. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF 501L 15 DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. BOULDERS 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE GUB1G YARDS OF APPROVED GOMP05T PER 1000 SQUARE FEET. DO NOT CREATE MUDDY SOIL. CITY OF MERIDIAN p� ROTO-TILL ORGANIG MATTER A MINIMUM OF 6 INGHES INTO TOPSOIL. q. BEFORE PLANTING, OBTAIN LANDSCAPE ARGHITEGT'S AGGEPTANGE OF FIN15H GRADING; RESTORE PLANTING AREAS IF ERODED OR 10 QUANTITY Z O 12. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATION5. OTHERWISE DISTURBED AFTER FINISH GRADING. LANDSCAPE REQUIREMENTS JB PLANT IDENTIFICATION KEY O 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18 DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12 DEPTH OF TOPSOIL. Q = W SPREAD, GOMPAGT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJAGENT SURFAGES OF PLANTER BED S. 7 AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND I" BELOW ADJAGENT SURFAGES OF TURF SEED AREAS. $ S. MERIDIAN ROAD BUFFER ++++++++ TURF SOD OVER L Q n 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY + + + + APPROVED TOP SOIL AS LL SUITABILITY AND GONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL N Requirements: LENGTH TREES REO'D TREES PROVIDED + + + + SPECIFIED. Q /r AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, GLEAN AND FREE OF TOXIC, I TREE PER 35 L.F. 207 L.F. 6 q + + + + \� MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ON51TE ­I(V AND SHRUBS, TURF, WIDTH / TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, GONTRAGTOR 15 RESPONSIBLE TO EITHER: OR GROUNDGOVER 35' BUFFER < W v F A) PROVIDE APPROVED IMPORTED TOPSOIL, OR I CO E. LIBERATOR LANE/CT. PARKWAY 3" DEPTH OF 2" MINUS ^ Q B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSGAPE ARGHITEGT. BARK MULCH OVER CD 15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURGE5 15 REQUIRED, ENSURE IT 15 FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, Requirements: ENGTH TREES REQ'D TREES PROVIDED APPROVED TOPSOIL AS Q :�i REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 I TREE PER 35 L.F. 755 L.F. 22 22 SPEGIFIED. w o INGHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. AND SHRUBS, TURF, ' ^ Q 7 A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE OR GROUNDGOVER FE5GUE SEED MIX. SEE SHEET v, L PROJEGT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OGGURS AT A DEPTH OF NOT LESS OPEN SPACE REQUIREMENTS L/I.5 FOR NOTES. 0- < o THAN 4 INGHES.B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR AGIDITY, FERTILITY, TOXIGITY, AND GENERAL TEXTURE BY A REGOGNIZED I y2" SQ. TUBE STEEL G O `"' GOMMERGIAL OR GOVERNMENT AGENGY AND GOPIE5 OF THE TESTING AGENGY'S FINDINGS AND RECOMMENDATIONS SHALL BE RAIL Requirements: AREA TREES REOP TREES PROVIDED J FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE GONTRAGTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY I TREE PER 8,000 51,870 S.F. 6 6 L J W CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. 1/2" 50. TUBE STEEL SEED OR SOD.SQUARE FEET, AND CALLOUT LEGEND r E � I6. IMMEDIATELY GLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSGAPE OPERATIONS AND DISPOSE OF PICKET LO PROPERLY OFF SITE. AT 4" O.G., TYP. - PATHWAY REQUIREMENTS 0 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL A.G.H.D. STORM DRAIN PIPE, 5TRUGTURE5, OR FAGILITIES. TREES - o O 40' VISION TRIANGLE _0 SHALL NOT BE PLANTED WITHIN 5'-0" OF AN A.G.H.D. SIDEWALK. SOLID T� I Requirements: LENGTH TREES REOV TREES PROVIDED � I CO 1 TREE PER 100 3q0 4 O BERM IN GOMBINATION WITH 6' HIGH SIMTEK WALL, SEE - 18. SEEPAGE BEDS AND OTHER STORM DRAINAGE FAGILITIES MUST BE PROTEGTED FROM ANY AND ALL CONTAMINATION DURING THE L.F..LINEAR FEET OF DETAIL 7/LI.S. GON5TRUGTION AND INSTALLATION OF THE LANDSGAPE IRRIGATION SYSTEM. o H. IN THE EVENT OF A DISGREPANGY, NOTIFY THE LANDSGAPE ARGHITEGT IMMEDIATELY. PATH. � 2" SQ. TUBE STEEL O PROPOSED 6'-O" TALL VINYL FENCE, SEE DETAIL 3/L1.5. POST AT 6 O.G., TYP. FENCING REQUIREMENTS O PPROPP055ED 6'-0" TALL VINYL FENGE (TO BE INSTALLED BY TOPSOILNOTES PERIMETER FENCE 1,175 L.F. 6-O VINYL FENCE PERIMETER FENCE BY BUILDER 1,026 L.F. 6'-0" VINYL FENCE O PROPOSED 6'-0" TALL TUBE STEEL FENCE, SEE DETAIL 7 c� 1. TOPSOIL REQUIREMENTS: A5TM D 5268, PH RANGE OF 5.5 TO , FOUR PERCENT ORGANIG MATERIAL MINIMUM, FREE OF STONES 1/2 5 1&1.0. INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. GONGRETE PAVING MIGROPATHWAY FENCE 12-7 L.F. 6-0" TUBE STEEL D 2. TOPSOIL 5OURGE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE 51TE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, OR LANDSGAPE O NOTE: STREET LENGTH DOES NOT INCLUDE VISION TRIANGLES. 2'-4' DIAMETER BOULDERS (TOTAL QUANTITY-25), SEE NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, GLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF FINISH GRADE, REFER 6 DETAIL 6/1-1.5. a ROOTS, STUMPS, ORGANIG MATTER LARGER THAN 2 INGHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLAN 4 TO PLANT GROWTH. TOPSOIL SHALL BE 5GREENED TO ACHIEVE TH15 REQUIREMENT. SIN 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A REGOGNIZED GOMMERGIAL OR rn GOVERNMENT AGENGY AND COPIES OF THE TESTING AGENGY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE a a LU o= w 0 ARGHITEGT'5 REPRESENTATIVE BY THE GONTRAGTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPEGIFIED PH AND ORGANIC PLANT SCHEDULE y w 19 C Z r- REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL GOMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE \� w m LOUa o c v� PLACED WHILE IN A FROZEN OR MUDDY CONDITION. QTY. KEY BOTANICAL NAME COMMON NAME SIZE NOTES CLAS �� Z�;W Z 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THIGKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE D Z I a�w w ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED. DECIDUOUS SHADE TREES cc I­ ��� � calixN o c a 4°Z 0 5. COMPACTED TOPSOIL THIGKNESS AT THE FOLLOWING AREAS: 400 C A. LAWN AREAS: q INGHES MINIMUM OR AS NEGE55ARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. 12 AG Acer platanoides 'crimson King' Crimson King Maple 2" GAL. B B 45'H x 35'W I I a z w 0 B. PLANTER BEDS: 18 INGHES MINIMUM a a 3 AD All platanoides 'Deborah' Deborah Norway Maple 2" GAL. 134B 50'H x 50'W 11 Co 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, 12 TT Tilia tomentoso Silver Linden 2" GAL. B4B 50'H x 35'W 11 o AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2" BELOW FIN15H GRADE OF PAVEMENTS AREAS FOR o 3 OR Quercus rubs Northern Red Oak 2" GAL. BBB 50'H x 35'W III REVISIONS SOD AND I" FOR SEED. M No. Date Description a 7. TOPSOIL STOCKPILE LOGATIONS TO BE GOVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED a CONIFEROUS TREES IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE 5TOGKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSGAPE AREAS TO PREVENT LANDSGAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. GONTRAGTOR SHALL ,N q PP Picea pungens 'Hoopsll' Hoop's Blue Spruce (b-7' HT. B$B 30'H X 15'W T SUBMIT A DETAILED STOCKPILE PLAN TO LANDSGAPE ARGHITEGT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. PROJECT NO.: ORNAMENTAL TREESIr WEED ABATEMENT NOTES: 4 GG Gercis conadensis Eastern Redbud 2" GAL. Bff B 25'H x 20' W I 21028 B NOTE: DRAWN BY: 0 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO I) FINISH SHALL BE MANUFACTURE'S POWDER COATING. SUBMIT COLOR SAMPLE FROM FULL COLOR SHRUBS/PERENNIALS/ORNAMENTAL GRASSES TC Z PALETTE FOR OWNER APPROVAL PRIOR TO ORDERING. PLANTING OR� HYDROSEEDING. #1 5'H X 3'W CHECKED BY:2) CONCRETE POST FOOTING SHALL BE 12 MINIMUM DIAMETER X 36 DEEP (4500 PSI). 27 GA Galamagrostis x acutiflora Overdam Overdam Feather Reed Grass > 2. GONTRAGTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ©ROUND-UP,& (GONTAGT HERBIGIDE) OR APPROVED EQUAL. a) 3) ALL FIELD WELDS SHALL BE GROUND SMOOTH AND POWDER COATED TO MATCH ADJAGENT 41 GB Gornus albci Bailhalo Ivory Halo Dogwood #5 5H X 5W JB c 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. #5 6'H X 6'W SURFACES. 26 EA Euonymus alatus Gompactus Dwarf Winged Burning Bush DATE: 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF Co 4) CONTRACTORS ARE RESPONSIBLE FOR SHOP DRAWINGS TO BE REVIEWED BY DESIGN PROFESSIONAL 83 MA Mahonia aquifolium 'Gompacta' Compact Oregon Grape #2 3'H x 4'w 3 17 2021 � TH15 WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. PRIOR TO INSTALLATION. TUBE STEEL GATES SHALL BE POWDER COATED - GOLOR AS DIRECTED BY 32 PM Pinus mugo 'Slowmound' Slowmound Dwarf Mugo Pine #5 3'H X 5'W LU 0 5. APPLY SEGOND APPLICATION OF GROUND-UP-4 TO ALL EXPOSED WEEDS. APPLY IN STRICT GONFORMANGE WITH MANUFACTURER'S OWNER 88 SS Salvia x sylvestrls 'Mainacht' May Night Salvia #1 15H X 1.5'W SPEGIFIGATIONS AND INSTRUGTION5. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 47 5B Spiraea x bumalda 'Anthony Waterer' Anthony Waterer Spirea #2 4'H X 4'W 6. IF ANY EVIDENGE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLIGATION5, CONTRACTOR SHALL BE DIRECTED TO PERFORM A 18 VG Viburnum carlesii Korean 5 ice Viburnum #5 6H X 6W SHEET NUMBER THIRD APPLIGATION. TUBE STEEL F E N C E A i 7. AT THE TIME OF PLANTING AND HYDRO5EEDING, ALL PLANTING AREAS SHALL BE WEED FREE. L1.0 0 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ORIGINAL SKRVEY ON FILE A- CK ENGIN-C2ING DRYLAND SEEDING REQUIREMENTS IRRIGATION NOTES: WHENPRNTHE BUD TRUNK OF o° POINT (A MINOR CROOK IN THE ROOT FLARE/COLLAR (SWELLING AT o°°op0����0poOoo ° E I o JUST ABOVE THE SOIL LINE WHERE STEM TISSUEITz D�°Ooo I. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC, UNDERGROUND SPRINKLER SYSTEM WHIGH TRANSITIONS INTO ROOT TISSUE) TO o0 5 �� o 0 GENERAL OVERVIEW SOIL LINE) TO BE INSURES COMPLETE GOVERAOE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH BE AT SOIL LINE. THIS REPORT OUTLINES RECOMMENDED REVE6ETATION AND SLOPE STABILIZATION HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. APPROXIMATELY I Y2" 4 PREVAILING WIND PRELIMINARY ABOVE THE SOIL ROOT PROBE �';J MEASURES FOR DISTURBED GUT AND FILL SLOPES WITHIN THE PROJECT LIMITS AS DEFINED ON 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES. LINE $h, bjry DIRECTION NOT FOR w 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS THE AGGOMPANYIN6 PLAN WHIGH WILL BE SEEDED WITH THE DRYLAND SEED MIX AND NOT ', CONSTRUCTION AND Ib" AT PLANTER BEDS. - �' IRRIGATED. THESE RECOMMENDATIONS ARE MADE TO PREVENT SHORT TERM AND LONG TERM �,;,, < 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, SOIL LIN ,, E a� - f �; SOIL EROSION AS WELL AS TO PROVIDE AN AESTHETIC, REVE6ETATION WHIGH WILL BLEND WITH PERENNIALS GROUND COVERS OR SHRUB MA55IN65 SHALL HAVE APOP-UP SPRAY SYSTEM. 2•i '�� REMOVE DEAD/DAMAGED BRANGHES 000O�SCA4°000° o THE EXISTING NATURAL SURROUNDING AREA. THE MEASURES INGLUDE REVE6ETATION AND 5. ELEGTRONIC WATER DISTRIBUTION/ TIMING GONTROLLERS ARE TO BE PROVIDED. MINIMUM _`��, - ��1 °p0pE111DO CONTROLLER REQUIREMENTS ARE AS FOLLOWS: �o Fcti e� AND PRUNE TO INTERNATIONAL o HYDROMULGHIN6 PROCEDURES FOLLOWING TOPSOIL DISTRIBUTION AND FINE GRADING. THE SOCIETY OF ARBORICULTURE Z ' AREA TO BE REVE6ETATED GONSISTS OF ALL DISTURBED AREAS RELATED TO GRADING FOR Q• PRECISE INDIVIDUAL STATION TIMING �� - � ,� STANDARDS; IMPROPERLY PRUNED o b. RUN TIME GAPABILITIES FOR EXTREMES IN PRECIPITATION RATES ° - x GONSTRUGTION AND ANY OTHER AREAS DISTURBED IN THE PROCESS OF GONSTRUGTION. THE _``vimz TREES (AS DETERMINED BY THE c. AT LEAST ONE PR06RAM FOR EACH HYDROZONE � �; _'� �'^ LANDSCAPE ARGHITEGT) SHALL BE SLOPES TO BE AFFEGTED VARY WIDELY IN DEGREE AND ASPECT. d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF wry y o M M HIGHEST ROOT SHALL d REMOVED AND REPLACED. DO NOT E a) o e. POWER FAILURE BAGKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONSFl�lli N BE 2 MAXIMUM `� REMOVE MAIN LEADER!! o o a WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. , ;r �'GENERAL EARTHWORK BELOW SOIL LINE. a"� , �i o o o 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE � hv� » ? CD v oo N `' ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION WITH MINIMAL, IF UTILIZE SOIL/ROOT `j° ':r RUBBER GINGH TIE ° 2 a N ° °J WATER TO RESPEGTI VE HYDRO-ZONES. h' WHEN PRESENT: BUD w ANY, DISTURBANCE TO THE SURROUNDING NATURAL SLOPE OR VEGETATION. ALL FINISHED PROBE AROUND n ?, POINT (A MINOR a ° E D a w 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 1003o HEAD TO HEAD COVERAGE TRUNK (APPROX I"-2" `�I `�' s" 2"x 2" WOOD STAKE (LENGTH AS ROOT FLARE/COLLAR (SWELLING AT a) N 0 o o E o N GRADES SHALL BE SMOOTH AND ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW WITH TRIANGULAR SPACING. ! ?' � -� CROOK IN THE TRUNK s Q us � Y �, p AND EXISTING GRADES. REFER TO GRADING AND DRAINAGE PLANS FOR ADDITIONAL 5. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFAGES AWAY FROM TRUNK) ''a 9"�� REQUIRED)-DO NOT PENETRATE JUST ABOVE THE SOIL LINE WHERE STEM TISSUE a c°i o L-° a ob N `o v o TO LOCATE HIGHEST �`v�J� �i^'�a� FOOTBALL. SEE NOTE I. SET STAKES TRANSITIONS INTO ROOT TISSUE) TO w U, M a a s; z REQUIREMENTS. (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). f „,�K,;�„, SOIL LINE) TO BE > = o .m = 3 N a ROOTS. �g p PARALLEL TO PREVAILING WIND. „ BE AT SOIL LINE. v 3 U, 3 u 0 cCc) o q. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EAGH (6) AUTOMATIC, VALVE ZONES. b� "% 1 Isa^ ! APPROXIMATELY I Y2 PREVAILING WIND � u- a [3 APPROVE Q.G.V. LOGATIONS WITH LANDSGAPE ARGHITEGT. " ` ABOVE THE SOIL ROOT PROBE w SITE PREPARATION � ��,;,:,t;1; REMOVE TREE WRAP TRUNK LINE EARTHWORK PROCESS SHOULD BE61N WITH GLEARIN6 LARGE SHRUBS FROM THE AREAS TO A' A' �- �, "`�� PROTECTION, AFTER INSTALLATION BE DISTURBED. WOODY STEMS AND BRANGHES SHALL BE CHIPPED ON SITE TO IMPROVE THE �` w L REMOVE BURLAP, � �;-, `,� ,;,;�, CONSTRUCT 2" EARTH BERM AT EDGE SOIL LINE AMOUNT OF OR&ANIG MATERIAL IN THE TOP SOIL. NATURAL TOPSOIL OGGURS AT VARYING � �', ( �Q' N _ _ TWINE, AND WIRE rrx l, ` OF ROOTBALL FILL TREE RING W/ N REMOVE DEAD/DAMAGED BRANGHES > DEPTHS ON THE PROJECT SITE. THE TOPSOIL SHOULD BE EXGAVATED AND STOGKPILED AT BASKET FROM TOPS ' �' AND PRUNE TO INTERNATIONAL A = LENGTH, AS SPEGIFIEDA'� ,c'�� MULCH, AS SPEGIFIED. o DESIGNATED STORAGE AREAS PRIOR TO THE PROPOSED GRADING OPERATIONS. � OF FOOTBALL w w OR PER PLANT SGHEDULE 0-1 'jy'`� �� ' ti SOCIETY OF ARBORICULTURE m REMOVE ALL NAILS, _ 0 w 0 0 1rb� 3" THICK MULGH LAYER, KEEP MULGH STANDARDS; IMPROPERLY PRUNED a 9' P TIES, AND PLASTIC �3" z �" TOPSOIL DISTRIBUTION B = b5% OF 'A' N w 0 Q 3 AWAY FROM TRUNK. TREES (AS DETERMINED BY THE Z FROM ROOTBALL. IF J N s o ONGE THE GENERAL EARTHWORK IS GOMPLETE AND ROUGH GRADING HAS BEEN SYNTHETIC BURLAP IS FINISH GRADE r LANDSGAPE ARGHITEGT) SHALL BE + HIGHEST ROOT SHALL REMOVED AND REPLACED. DO NOT AGGOMPLISHED, THE TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS UTILIZED TO WRAP w \ \ \ \ / /\/\/\ COMMERCIAL SLOW RELEASE BE 2" MAXIMUM REMOVE MAIN LEADER!! AS SPEGIFIED. WHERE NEEDED, SLOPES SHOULD BE GRADED WITH SERRATION TO HOLD THE FOOTBALL, IT N \ \ \// \/\ ,<% `" :t'- < ="., \\ / / \ L LINE. SHALL BE Q wm °�/jV�/jV�// /VA/jV�/j; //� � /////��/��// FERTILIZER TABLETS BL�E 5011E/ROOT RUBBER GINGH TIE TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND LIGHTLY GOMPAGTED UTILIZING A PLAN VIEW COMPLETELY SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR ANOTHER METHOD FINISH GRADE PER PLANS REMOVED. ONLY =III \/ \/ SIDES OF HOLE ROUGH UNEVEN PROBE AROUND - o K WITH EQUAL GAPABILITY. IT IS OUR REGOMMENDATION THAT ANY NEGE55ARY MEGHANIGAL BIODEGRADABLE TRUNK (APPROX I 2 2 x 2 WOOD STAKE (LENGTH AS ° BAGKFILL WITH APPROVED TOPSOIL AWAY FROM TRUNK) REQUIRED)-DO NOT PENETRATE MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE. EDGING, PER PLANS AND DETAILS BURLAP SHALL BE - L AND SOIL AMENDMENTS AS TO LOCATE HIGHEST ROOTBALL. SEE NOTE I. SET STAKES ' w ONGE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVE6ETATION SEEDING SHALL LEFT ON THE BOTTOM = - - - SPEGIFIED. BAGKFILL IN 6" LIFTS, ROOTS. �D PARALLEL TO PREVAILING WIND. w FOLLOW IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE CRUSTING AND TO FACILITATE 6ROUNDGOVER PLANTING PER OF THE FOOTBALL. WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP BETTER ROOT PENETRATION, THE SURFAGE SHOULD BE SGARIFIED PRIOR TO SEEDING. PLANTING PLAN LIGHTLY AS REQUIRED BAGKFILL REMOVE TREE WRAP TRUNK ° OF BALL OF BALL OF BALL OF BALL OF BALL 0 17 SOIL EVEN W/ TOP OF ROOTBALL, Q PROTECTION AFTER INSTALLATION w SEEDING MULCH, PER PLANS, 3" DEPTH OVER DO NOT OVER GOMPAGT!! J 0 w ENTIRE BED. DO NOT GOVER GROWNS 5' MIN. DIA. TREE RING 0 ` O GONSTRUGT 2 EARTH BERM AT EDGE APPLY SEED TO THE PROJECT SITE BY HYDROSEEDIN6. M OF PLANTS 0 Copyright C 2021 SET FOOTBALL ON NATIVE, z OF FOOTBALL, FILL TREE RING W/ Z THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXEGUTION FOR SEEDING. _ _ VA V/V/V/ V/ V/V/\ g All or resered. ReproductionoruseInanyif m o IIIIIIIIIIIII VA°/VA /VAS/VAS/VAS/VA VA ° ° SPLIT ALL ROOT BOUND ROOTS WITH 3 NOTES: UNDISTURBED SOIL Q MULCH, AS SPEGIFIED. or by any means without x /A/ A/A/A/A / A/A/A if) m Breckon Land Design,Inc.is unlawful and subject to 0 SEED MIXTURE: PURE LIVE SEED 95 MIX - -III- VA°/VA /VA°/VA°/VA°/VA V OVA°/VA°/ EG2UAL SPACED VERTICAL GUTS. I. THE STAKING OF TREES IS TO BE THE GONTRAGTOR'S OPTION; HOWEVER, THE GONTRAGTOR IS RESPONSIBLE TO p 3" THICK MULCH LAYER KEEP MULGH criminal prosecution. 1 /iv// //v//v//v//v//v v //v//v/ 0 w HARD FESGUE 25 -III- //A°/ jA j / DEWITT PRO 5 WEED BARRIER FABRIC I!NjRR�RANTY PERIOD OR I YT ALL TREES EAR AFTER UBPLANTED STANTIALNDGOMPLET ON THAT THEY WHIGHIEVER IS 6REA ERN 5TRAI FOR �ALL S°TAKIN6 REMOVE BURLAP, 3 AWAY FROM TRUNK. VA°VA°VA°V/VA/VA/VA/VA/VA/VA/VA/VA/VA/VA/VA/ /VA° OR APPROVED EQUAL TWINE, AND WIRE SHEEP I �R�D FESGUE �� V % %�� ��/ �\ SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. BASKET FROM TOP �w FINISH GRADE 0 2. IN THE EVENT OF A QUESTION OR LACK OF GLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE //A//A// / // ;:y ';.J .... COMMERCIAL SLOW RELEASE z WIN&LEY GHENINC75 FESGUE 25 TILL SOIL TO A DEPTH OF 12 , -III-I -III-III-III-III-III-III-III-III-III-III-III-III LANDSGAPE ARGHITEGT BEFORE PROGEEDIN6. of ROOTBALL, - v/v/v/ /v/ v /v /v/ / w BAGKFILL WITH APPROVED TOPSOIL REMOVE ALL NAILS Q w \ AA °AAA FERTILIZER TABLETS 3. LANDSGAPE GONTRAGTOR IS TO NOTIFY THE LANDSGAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION OF TOTAL SEED 40 LBS PURE LIVE SEED =III-III-III-III-III-III-III-III-III-III-III- -III- I' AND SOIL AMENDMENTS, AS SPEGIFIED. PLANT MATERIAL. TIES, AND PLASTIC INSTALL 25 LBS / ACRE „III - _III- SUB6RADE 4. WRAP RUBBER GINGH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE FROM ROOTBALL. IF 115 / - = = SIDES OF HOLE ROUGH ff UNEVEN E16HT TYING METHOD. SEGURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. UTILIZED TO WRAP BAGKFILL WITH APPROVED TOPSOIL o SECTION 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. -III =III=III =III AND SOIL AMENDMENTS AS Z THE ROOTBALL IT N FIBER MULGH MATERIAL 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSGAPE ARGHITEGT - SPEGIFIED. BAGKFILL IN 6" LIFTS, SHALL BE „III GROW NUTRIBASE FROM OQUATTRO ENVIRONMENTAL-, A GOMPOSTED POULTRY BASED MULGH NOTES: IMMEDIATELY. WATER EACH LAYER, TAMP CONIFEROUS TREE PLANTING 10 COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH H MATERIAL FREE OF GROWTH OR GERMINATION INHIBITING INGREDIENTS. APPLY AT THE RATE I. ALL 6ROUNDGOVER PLANTS TO BE PLANTED ON GENTER AND IN A REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL LIGHTLY AS REQUIRED, BAGKFILL OF 2000 LBS. PER ACRE. TRIANGULAR PATTERN. 5 BIODEGRADABLE SOIL EVEN W/ TOP OF ROOTBALL, o 2. APPLY SPEGIFIED PRE-EMERGENT PER MANUFAGTURER'S KOr -° -A BURLAP SHALL BE 5' MIN. DIA. DO NOT OVER GOMPAGT!! w OR6ANIG SOIL AMENDMENT TREE RING 10 RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. LEFT ON THE BOTTOM ^ I o GROW NUTRIBOOST FROM ©OUATTRO ENVIRONMENTALA (OR APPROVED EQUAL) APPLIED AT 5 SHRUBS PER PLAN OF THE ROOTBALL. SET FOOTBALL ON NATIVE, Q ` V w GALLONS PER ACRE• PERENNIAL & G R O U N D C O V E R UNDISTURBED SOIL �} w TAGKIFIER 2 24" - 48" DIAMETER NOTES: Q V Q PLANTING Scale: I NTS BOULDER, AS SPEGIFIED, THE STAKING OF TREES IS TO BE THE GONTRAGTOR'S OPTION; HOWEVER, THE GONTRAGTOR IS o MULGH TAGKIFIER SOIL STABILIZER - EGOL06Y GONTROLS M-BINDER. TAGKIFIER APPLIED AT a LOCATE PER PLANS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT 0M w THE RATE OF 80 LBS. PER ACRE. `' J10 FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. GRANITE SEED 96" ON CENTER GOMPAGTED SUB6RADE ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. (� w 16G7 WEST 2100 NORTH EXTRUDED POST GAP AS REQUIRED 2. IN THE EVENT OF A QUESTION OR LACK OF GLARITY ON THE DRAWINGS, THE GONTRAGTOR IS TO NOTIFY (� P.O. BOX 177 (STANDARD OPTION) 91" MAXIMUM SPAN a THE LANDSGAPE ARGHITEGT BEFORE PROGEEDIN6. LEHI, UTAH b4043 N e BARK MULGH, AS 3. LANDSGAPE GONTRAGTOR IS TO NOTIFY THE LANDSGAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION O w I-800-768-4433 1-1/2" x 5-1/2" BOTTOM RAIL (OR APPROVED EQUAL) WITH IS"X 1.25" _ SPEGIFIED OF PLANT MATERIAL. GALVANIZED METAL INSERT `� `k�� ,a ��' 4. WRAP RUBBER GINGH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR O Q HOLD TOP AND BOTTOM •t ,< SHRUBS PER PLANS FIGURE EIGHT TYING METHOD. SEGURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT HYDROSEED I N6 Z MIX SPEGIFIED SEED AND OR6ANIG SOIL AMENDMENT IN WATER PER MANUFAGTURER'S 7/8" U-CHANNEL RAILS IN PLACE WITH SLIPPAGE. LOCK RING. `4 ri 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. RECOMMENDATIONS. APPLY SEEDED SLURRY EVENLY IN TWO INTERSEGTION DIREGTIONS. DO III III +. J �xr ` 1 i x t°: ,.. d �' ` sA 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSGAPE ui REMOVE TOUN6E ON ONE 12' d Q NOT HYDROSEED AREA IN EXGESS OF THAT WHIGH GAN BE MULCHED ON SAME DAY. KEEP OFF '"` ys<, :` x, r sz• ,. e� ARGHITEGT IMMEDIATELY. SIDE OF PANEL TO SIT 4" 5" CONCRETE MOWSTRIP -III III ,� }Y x x , . 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN b'-O" IN WIDTH, PROVIDE TREE ROOT ROADS, WALKS, STRUGTURES AND AREAS NOT TO BE SEEDED. GLEAN UP THESE AREAS. AFTER FLUSH AGAINST POSTIt BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF GURB AND HYDROSEED, TRACK IN SEED USING A GLEATED GRAWLER WITH TRACK MARKS PERPENDIGULAR GONGRETE FOOTING III III 4 x, � EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL UJ F TO THE SLOPE. AFTER TRAGKED, MULGH SLOPE WITH 2O00 LBS. PER AGRE OF FERTILE-FIBER N III x y ` ''`� f" REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. Q MULGH MATERIAL AND bO LBS. PER AGRE OF TAGKIFIER. SCORE JOINT AT EACH .x.. > U POST III s `., °. III UJ /� C6 MAINTENANCE FENCE POST, SET POST -II- HE AH-hI III III III III �� DECIDUOUS TREE PLANTING o IMMEDIATELY RESEED AREAS WHIGH SHOW BARE SPOTS. MINIMUM AGGEPTABLE PLANT PRIOR TO INSTALLATION -III 8 NOT TO SCALE COVERAGE IS 80 PERCENT AFTER ONE GROWING SEASON. PROTECT SEEDED AREAS WITH 7/8 x 6 TOUN6E AND OF MOWSTRIP III III III III III III III III III III III GROOVE PICKET -III 0- O WANING SIGNS DURING MAINTENANCE PERIOD. THE SEED WILL REQUIRE APPROXIMATELY NINETY PLAN VIEW III -III III III o �,. (CIO) DAYS OF FAVORABLE GROWING GONDITIONS TO GERMINATE AND BECOME ESTABLISHED I-I/2" x 5-I/2" BOTTOM RAIL FOR SUCCESSFUL SURVIVAL WITH NORMAL MINIMAL SUMMER PRECIPITATION. III III III III- 4 WITH I.5"X 1.25" N SIN 5" SQUARE VINYL FENGE GALVANIZED METAL INSERT r' POST WITH GALVANIZED �'� r T METAL INSERT (TYPICAL) y% SEEDING TIME NOTES: y � � ' ^ E THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID 1 I.<I I. NOTIFY LANDSGAPE ARGHITEGT WHEN PLACING BOULDERS FOR APPROVAL. a� � 3a � s �1 J 2 II11 SET FINISH GRADE AS 2. PLRGE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION. - OCTOBER. IF SEEDING IS APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS II II � 12 WIDE CONCRETE I I I � IIIII I I-a' I11= SPEGIFIED 3. GLEAN BOULDERS OF DIRT AND LOOSE DEBRIS. NOT REALIZED PRIOR TO FALL DORMANGY, THEN RESEEDING SHALL BE APPLIED IN EARLY MOWSTRIP III11I w�a ti I I I N 1=III= = 4. WHEN PLAGIN6 BOULDERS, BURY 4 TO � OF BOULDER BELOW FINISH GRADE. , v SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN MARCH AND MID MAY. THIS -III III 1 GONGRETE FOOTING AS 5. DO NOT SCAR OR DAMAGE BOULDERS. h , r, 6 TALL SOLID WALL O PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND I I I -III- III: SPEGIFIED ,` „_, _ _IIIII1 � �,v2 BY SIMTEK COLOR TO SEEDLING SURVIVAL RATE. SEEDING AFTER NOVEMBER 20 'DORMANT SEEDING' INSURES THAT NOTES: I =11I- 1- L BE PRIOR TO 6" AGGREGATE BASE BOULDER INSTALLATION �, �� INSTALLATION 'BROWN THE SEED DOES NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND SEED I. REFER TO LAYOUT PLAN FOR MOW STRIP � =11I-I = \ 1-w�a r SHOULD BE IN PLACE FOR THE EARLY SPRING RAINS. LOGATIONS. !II -1 COMPACTED SUB-GRADE 6 � ;_ " �xr"" GRANITE' VERIFY =III NOT TO SOALE 2. SEORE JOINTS o 10' O.G. OR AT EAGH POST. 1I 11I_ 1= O N SLOPE „ {T COLOR WITH OWNER c -' e 3. INSTALLATION TO BE COMPLETED IN " 1 D WATER AGGORDANGE WITH MANUFAGTURER'S 32 32 THE GONTFAGTOR WILL PROVIDE SUPPLEMENTAL WATER TO ENSURE PROPER SEED 5 .!� p ��ri,° o SPECIFIGATIONS. a., ua� GERMINATION. 4. MATGH VINYL FENGE TO EXISTING VINYL FENGE ON BERM OF ADJAGENT PROPERTIESb; FERTILIZATION �, " _ VINYL FENCE PANEL �� FERTILIZATION IS NOT RECOMMENDED FOR REGLAMATION SEEDING DUE TO PROMOTION OF � r ems""� o J J a a lu o= w `o WEED COMPETITION. IF WEEDS ARE APPARENT, CONTACT LANDSGAPE ARGHITEGT FOR WEED 3 '��"' '�! Wit " I Q Q PROPOSED °° °- 5 - o W W°ImOZF SCALE: �2��= -O�� �� „� n �l'' '�� �C=Q�� �p y m J REMOVAL REQUIREMENTS. c �Q ��h��� - RESIDENTIAL \ m a o LL. KEEP GROUND LINE SAME AS NURSERY LINES- �y9 z I z PROPERTY a v o w z t7 Q LANDSGAPE BERM ` „v 9 �q,?w ^, �� o Q _ z 4 CC M EROSION GONTROL �yy,� r,. / t�a�w w REMOVE ANY PLASTIG, BURLAP, NAILS, OR '� +L A, - SLOPE VARIES y 1rb� " M ��/ °0>o�a°m UNDER NORMAL GIRGUMSTANGES AND ADHERENCE TO THE GONSTRUGTION PRAGTIGES f" a N° a Z z 5 OTHER MATERIALS FROM THE ROOTBALL PLANTER BED GUT EDG '' r 0 DESCRIBED IN THE SPEGIFIGATIONS, THE ABOVE RECOMMENDED EROSION CONTROL MEASURE - _= l rl llil =1 - m 2:I MAXIMUM <Z o x 2 C WHIGH MAY LIMIT ROOT GROWTH PLANTER BED I a_ w ° SHOULD PROVIDE A STABLE SLOPE CONDITION. TO AVOID INGIDENTAL EROSION, IT IS -Ill-1T1=IT11-'II1 T=IIl-I1 .1T1-11 ;lIF1 IT1-111im11-111=Ill- SLOPE 11=IIIIIIIIIIIIIIIIIIIIIIIIiiIlL=lei=i��- ��_��i=.IILiIIL=1 _III II- GUT EDGE -1T1=1�1 I111=111� 11111111�111 m-ll1- it 1i1=1i1=Ii1=1i1 LANDSGAPE BERM Go IMPERATIVE THAT THE SLOPES, ONCE PREPARED, REMAIN UNDISTURBED UNTIL SEEDING CONSTRUCT 2 EARTH BERM TO FORMA 1 T 1=1 T 1=1 T 1=1 T 1=1 T 1-� ��=1 i 1=1 i 1=1 i 1-11=1 i- c`u -111=III=111=III=III="- - �iilll III-19 _ REVISIONS o GERMINATES AND IS ESTABLISHED. WATER RETENTION BASIN, FILL BERM WITH 10' GONGRETE SIDEWALK TO =1 =1T1=lil-1i1-1T1=- : - =11=1i1-1i1=111=1 - \` MULCH, AS SPEGIFIED =1T1=1i1=1T1=1il=1Tl o "1=1i1-1T1=1i1 No. Date Description MATGH MERIDIAN ROAD -i i-i i 1=1 T 1=1 T 1-1i1-1�-" � ,1=1i1=1i1=1i1=11= - p J AN 8O% VEGETATION GOVER IS RECOMMENDED TO GONTROL EROSION. SURFAGE =1i1=1T1=1i1=1T1=I I w --i lglil-lil-lil=lil- a MERIDIAN ROAD GENTERLINE ELEVATION -111=11=1i1=1i1=1i1-1 m -it=lil-III;lil=1l1 CONDITIONS SHOULD BE MONITORED DAILY. IF EROSION DETRIMENTAL TO THE SLOPE IS -III=lit=1i1-lil-lil- ` T-1=1T1-1 -111- MULCH, PER PLANS, 3" DEPTH OVER ENTIRE - - - - - - - - - - - - - - - - - - - - BORROW DITGH a ==lil-lil-lil=lil-lil-i T-1i1=1i1=1i1=11=i- v ! _ _ - -1 -1 -1 1-1 1=111=-- - - - - c ------- -- -- -- -- -- - ------_---_-_-_-_- -III-III-III-III-III-III-III-III-III` OBSERVED OR ANTIGIPATEDDUETOEXGESSIVERAINFALL REMEDIAL MEASURES SHALL BE _- -- -- -- -- -- -- -- -- - -- -- -- - - - - _- _- _- - _- _ _ _ _ _ _ _ _ _ - , BED. DO NOT COVER CROWNS OF PLANTS -III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III III=III=III=III=III=III=III=III=1 = _ - - _ =III=III=III=III=III=III=III=III = - - - - - - - - - - - - - - - - - - II=III=III=11i- III-III-III-III-III-III-III-III-I _, MERIDIAN ROAD -,,,=,I1_ � ....':":,.. ...... I I-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III-111 III-III-III-III-III-III-III-III-III-III-III-III-111- _ - - - - _ = I-111-1 I I-1 I I-III-III-III-III-III-III-III-III-III-11 III-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-1 T 1-111 111 111 111 I I I 111 I I I 111 =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =III =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- = = _ = =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- IL- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =11L- =1L-I- - IMPLEMENTED AS REQUIRED. REFER TO THE STORM WATER POLLUTION PREVENTION PLAN FOR lil - lil - lil - lil - lil - lil - lil - lil - lil - 111 - lil - lil - lil - lil - lil - lil - lil - lil - - - - - - ---- lil - lil - lil - lil - lil - lil - lil - lil - lil lil - lil - lil - lil - lil - lil - lil - lil - lil - lil 1 - - - - CENTERLINE ELEVATION .�` i1=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=lit=1i1=1i1=1111i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i11i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=1i1=11 ..1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=1i1-1i1=111 ;,. .• _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � -III=III= =III- PROVIDE DEWITT PRO 5 WEED BARRIER „IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III III III III III III III III III III III III III III III III III III IIIIIIIII,,,III,,,III,,,II,,,. _.III_III ADDITIONAL REQUIREMENTS. -III III � Ir Q III FABRIC, OR APPROVED EQUAL 10' LANDSGAPE STRIP PROJECT NO.: 3" DEPTH OF MULGH AT = =III- PROVIDE GOMMERGIAL FERTILIZER TABLETS 2��2$ B PLANTER BEDS AND BIOSTIMULANT, AS SPEGIFIED, FOR EAGH DRAWN BY: o $" _ =III=III=III= = - SHRUB TC Z III.„III 1I111„III " "I WIDTH OF BAGKFILL WITH APPROVED TOPSOIL AND 10'-0" 15'-0" CHECKED BY: SOIL AMENDMENTS, AS SPEGIFIED. BAGKFILL 12'-6" 10'-0" 6" FOOTBALL 6" JB IN 6 LIFTS, WATER EACH LAYER, DO NOT 1 1 IIIII -liIII = TAMP OR OVER GOMPAGT.CID 3 17 T2021 Lii APPROVED TOPSOIL AND 501 - - / / o I L L CONSTRUCT 6 MOUND OF TOPSOIL 22' 6" 25' 0" -1 I 1-III-III 111 I I I���1111��11 I I l�l l 11� NOTE: _l l l AMENDMENTS AS SPEGIFIED FINISH GRADE, I. WATER SHRUB TWIGE WITHIN FIRST 24 HOURS. o PER PLANS GUT EDGE 2. APPLY SPEGIFIED PRE-EMERGENT PER MANUFAGTURER'S RECOMMENDATIONS TO ALL SHEET NUMBER A 6ROUNDGOVER BEDS. PLANTER BED CUT EDGE SHRUB PLANTING BERM ADJACENT TO MERIDIAN ROAD L1.5 (TYPICAL AT TREES IN TURF AREAS NOT TO °GA- NOT TO SOALE 7 SGa1e: Ii411 = -o" I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16