PZ - Applicant's response to Staff Report 4-1 Seasons at Meridian Meridian P&Z Hearing 4-1-21 SLIDE – COVER SLIDE/INTRO  Good evening Planning and Zoning Commission members, DEN, 601 W Bannock, on behalf of the applicant Morgan Holdings and Stone Hill  Representatives of the applicant and members of our local development team are also here and available to answer questions.  Thank you to Sonya for her work on this project.  I want to start with a little history to explain our 3 applications before you. SLIDE – VICINITY MAP  The Applicant is proposing to develop the Seasons at Meridian apartments on an approx. 16-acre parcel at 2700 East Overland Road, outlined in yellow.  The site was annexed and zoned C-G in 1994 as part of a larger 167 acre-area that included the I-84/Eagle interchange to the north and St. Luke’s Hospital to the northeast of the interchange.  In 2016, the City approved a Development Agreement governing the apartments site and the Winco Site to our west, outlined in blue. SLIDE – DA Condition 2  The DA allows development of the Winco site, at 2600 Overland, consistent with the concept plan. SLIDE – DA Concept Plan  The DA Concept Plan shows an 85,000 square foot retail building North of Cinema Drive and Vacant land on the south. SLIDE – DA Condition 3  To develop the eastern parcel, at 2700 Overland, the DA requires a DA Modification to include a new concept plan that is consistent with the MU-R FLUM. SLIDE – DA Concept Plan plus New Concept  This is the only purpose of the DA modification before you – to provide that concept plan, shown here. SLIDE – COMBINED Site Plan  Here is the pretty version with the landscaping. 1 SLIDE – FLUM  And, as Sonya describes in detail in her staff report, the proposed multi-family use and development plan is consistent with the MU-R designation in the FLUM because: o it contributes to the mix of uses desired in the MU-R area o by adding needed higher density residential in an area that is heavily developed with commercial and employment uses.  You can see that the MU-R area in this area is really large: 650 ACRES.  The MU-R designation calls for a mix of employment, retail and residential, with residential densities between 6-40 units per acre. SLIDE – CURRENT MIX IN MU-R AREA  This large MU-R area currently has extensive retail and office uses but has very little residential and is far below the 6-40 un/ac target density range, with a current density of only 1.27 un/ac.  This residential deficit is especially evident in the quadrant of the MU-R area surrounding our site—the 130 acres northwest of Overland and Eagle—where the current density is only 0.06 un/ac.  And, as the staff report notes, higher density residential will support the surrounding commercial and employment uses, providing nearby customers and employees that want to walk to work.  And, as the staff report also notes, the proposed apartments offer a nice transition between the low-density single-family residential to our East and the large retail uses to our West. SLIDE – PRELIMINARY PLAT  In addition to the DA Modification, we are also requesting preliminary plat approval to create legal lots.  The City and Winco Foods previously believed the apartments site was a separate lot. o there is a record of survey showing separate lots and separate homes and driveways were permitted on each parcel; o possibly the division was done at a time when the city allowed one time splits. o But these administrative records could not be found, so we are filing the preliminary plat to clean this up and ensure legal lots.  The Preliminary Plat has 2 phases: o Phase 1 includes the Seasons at Meridian apartments, the extension of Wells Avenue, and the signal at Wells and Overland, which was originally required as mitigation for the Winco development and now will be built by the Applicant for the apartments. o Phase 2 includes the remaining Winco Foods parcel, with 2 lots, and the extension of Cinema Drive. o ACHD has approved this phasing of improvements. 2 SLIDE – SITE PLAN FOR CUP  In addition to the DA Modification and Preliminary Plat, consistent with the existing C-G zoning, we are requesting approval of a conditional use permit for a multi-family use.  The Seasons at Meridian proposes 360 apartments. (density of 22.6 units per acre)  The Site includes ten “L” shaped buildings, arranged around internal open space areas to create smaller neighborhoods centered around pocket parks for active and passive recreation and gathering. SLIDES – AERIAL  Here is an aerial showing that arrangement. This view highlights how well the building arrangement creates an urban-like block pattern called for in your Comprehensive plan for MU-R areas, o nicely framing open spaces o and interlaced with landscaped pathways and the boulevard entrance o that all connect and integrate the site to the adjacent commercial uses. SLIDES – Elevations o Each building has been designed to create a sense of scale by incorporating a blend of 2- and 3-story roof lines softening the overall massing of the architecture. o Pedestrian access is provided by several formalized, enhanced entry gates for each building, concealing the stairways away from public view. SLIDES – Perspective  Seasons at Meridian apartments will include a mix of studios, 1-bedroom, 2-bedroom and 3-bedroom units o Ranging from 488 square feet to 1328 square feet.  Each unit has been designed with expansive private patios and balconies, o with a minimum area of 80 square feet, to create an indoor/outdoor experience catering to the outdoor lifestyle.  The interior of the units are designed to accommodate today’s ever-changing market with open, spacious floor plans and an abundance of glass. o Informal living/dining areas have large island kitchens ideal for entertaining for a casual lifestyle. o Other amenities include large bedrooms with walk-in closets, dual vanities in master suites, large showers and ample storage space. SLIDES – Architecture/Materials  The architectural theme is “Contemporary Farmhouse“.  A combination of vertical board and batten siding, stucco and decorative balcony rails along with varied color schemes create a soft, well-balanced exterior façade. 3 SLIDE – OPEN SPACE  Seasons at Meridian will include 4.15 acres (26%) of qualified open space, which exceeds City Code requirements. Only ___ is required. Commented \[TT1\]: Function of unit square footage, architect will need to do the math.  Internal pathways and sidewalks are linked throughout the Site, including a perimeter 1/2 mile walking loop.  The site includes a dog park, a large clubhouse area with pool, BBQ and seating, and courtyards within each building enclave.  Significant landscape buffers will provide attractive screening, o with 35’ along the north (I-84), o 25’ along the east side (single-family residential), o 25’ along the south (Overland Road) and o 10’ along the west (Wells Avenue). SLIDE – AMENITIES  Seasons at Meridian will provide 26 qualified amenities, representing each of the three categories listed in the UDC (11-4-3-27). Only __ are required. Commented \[TT2\]: Discretionary, not defined over 75 units. A. Quality of Life: 1. Club house – The project’s clubhouse includes parcel lockers, a bike maintenance room, remote work/classroom stations, a coffee bar and an outdoor fireplace with seating and BBQ area. 2. Fitness facilities 3. Public art B. Open Space: 1. Grassy area at least 50’x100’ – The project includes a total of 18 grassy areas at least 50x100’, including a dog park, multiple courtyards, park areas with seating and pocket libraries. 2. Plaza 3. Community garden C. Recreation: 1. Pool 2. Walking trails 3. Children’s play structure SLIDES – CLUBHOUSE – two slides  These slides provide some imagery for the architecture and quality of design for the clubhouse and amenities available to residents SLIDES – CLUBHOUSE – interior  Interior images show fitness rooms, workspaces, gathering spaces. 4 SLIDES – CLUBHOUSE – exterior/pool  And more imagery of the exterior/pool area SLIDES – CLUBHOUSE – amenities  The community also includes a property management office, a maintenance storage area, a central mailbox location, and parcel lockers  With electronic parcel lockers, recipients don’t need to worry about package theft or misplaced parcels. o The lockers can accept deliveries from any courier and keep packages safe and secure until they are picked up. o After a notification is sent, a recipient uses a unique delivery code to retrieve their package whenever best suits their schedule. SLIDE – PARKING – ADD SLIDE  The site plan includes 655 parking spaces, for a parking ratio of 1.82, including 360 covered parking spaces throughout the Site.  The provided parking has 25 MORE PARKING SPACES than the 630 parking spaces required by City Code.  And, the development includes carports and does not include enclosed garage spaces, avoiding the potential concern that parking is used for storage instead of parking. SLIDE – BOULEVARD ENTRANCE  Seasons at Meridian is designed to integrate with surrounding uses.  Our tree-lined east-west driveway aligns with Cinema Drive, which will ultimately extend east-west through the Winco site when it is developed, creating visual and physical integration to the commercial uses to the west.  Crosswalks across Wells Avenue provide pedestrian connectivity to nearby retail and employment.  On our east side, there is a single-family residential county subdivision that does not allow vehicular connectivity.  We still provide pedestrian connectivity and a public plaza with seating and outdoor library space.  The plaza lies at the east end of the tree-lined drive that extends east-west through our Site and aligns with Cinema Drive.  Employees of area businesses and our residential neighbors to the east can enjoy the perimeter walking path and plaza within our Site.  Our residents and other surrounding neighbors can safely walk to retail and employment uses. 5 SLIDE – BUFFER TO EAST RESIDENCES  We have created a significant buffer between the proposed project and the existing homes to our east, to ensure compatibility.  Our buildings are setback over 100’ from the side property line. And the average setback of our neighboring residences from the property line is ___’. Commented \[TT3\]: Measuring from Google Earth, the average is approximately 270’ SLIDE – SERVICES  The project will maximize and use existing City services by connecting to adjacent utilities and by locating housing close to existing fire and police infrastructure.  ACHD has reviewed and approved the traffic study for the development and the proposed access points. o To mitigate impacts of the apartments and the future Winco development, the Applicant will extend Wells Avenue and install a new signal at Wells and Overland. o No other mitigation is required, and all ACHD conditions of approval are acceptable.  Schools. o The project will have minimal impact on school enrollment. o Based on WASD’s calculations, the project will only generate 36 students. SLIDE – REQUESTED CHANGES TO CONDITIONS OF APPROVAL  We request Condition A.1.a. be deleted.  This condition seeks to add a requirement to the DA on the Winco site:  The only modification to the DA that is required is to add a new site plan for the eastern parcel.  And that is all that is requested in this application.  The Applicant does not propose any development on Lot 1, does not control Lot 1, and cannot accept a condition on its future development by Winco Foods.  We also request Condition A.3.c. be deleted.  This condition requires Cinema Drive to be built with phase 1 rather than with phase 2 as shown in the phased preliminary plat and as approved by ACHD.  The extension of Cinema Drive is not needed to serve Phase 1 with the apartments. o The apartments have primary access from the extension of Wells Avenue and secondary emergency access from Overland Road. o The Traffic Impact Study prepared for the Seasons at Meridian project did not assign any project traffic to the Cinema Drive extension and instead assumed all site traffic would use the Wells Avenue extension.  And with those assumptions, the Wells/Overland intersection and the Overland Road segment between Wells Avenue and Eagle Road meet all adopted levels of service.  Cinema Drive has always been planned to be built when the Winco site is developed. 6 o The exact placement of Cinema Drive may vary slightly as the development plans are finalized for Phase 2; o for this reason, Winco Foods does not agree to the construction of Cinema Drive until Phase 2 proceeds. o Winco Foods submitted a letter into the record supporting the apartment use and objecting to this condition. We respectfully request these 2 conditions be deleted. CONCLUSION  Thank you for your consideration. We would be happy to answer any questions you may have. 7 MISC FACTS  How many square feet is the proposed clubhouse? Approximately 7,900 SF  Is fencing proposed along the east boundary? I know there’s existing 6’ tall wood fencing along the southern portion of the east boundary but unsure about what exists to the north of that. We are proposing a privacy fence along the eastern edge of the site. Materials and sizing are TBD pending private meeting with neighbors and project approval from city council.  Is a wall and berm proposed along the north boundary? Not at this time  Please go into the Citizen Access Portal and add the Alternative Compliance application to #H-2021-0007 and pay the application fee. Tamara please complete Commented \[TT4\]: Complete  What’s going on with the irrigation ditch along the east & north boundary of the east parcel? Does it provide irrigation for downstream users? Tamara please clarify with civil engineer Commented \[TT5\]: Confirmed with NMID, the ditch does serve downstream users and must be maintained.  Are the double-paned windows just proposed on the north side of the two buildings that face I-84 or for all windows? And “double-pane” and “storm windows” the same? All windows to meet a recommended STC sound rating designated by sound engineer throughout site.  Has ITD reviewed & approved the proposed noise abatement (double-paned windows)? No, Tamara please confirm if ITD will even review? Commented \[TT6\]: Still trying to get an answer from ITD.  Are there 36 units in each structure or do they vary? All buildings contain 36 units  Do you have a plan that shows where the property management office, maintenance storage area, mailboxes and directory & map of the development are located? Yes, please refer to site plan provided with application. All of the above will be located in the clubhouse.  Submit a legal description for the DA for the property at 2600 E. Overland Rd. Tamara to provide Commented \[TT7\]: I provided Sonya with the legal description from the deed that includes both parcels.  Will the apartments be phased? If so, submit a phasing plan. No, all 360-units will be constructed in a single phase. Individual buildings will turned over as completed and approved by city inspection process.  Revise the open space exhibit to exclude the arterial street buffer (this is not allowed to count in UDC 11-4-3-27C) – because there’s a 10’ pathway within the street buffer along Wells, I think we can count that w/the CUP but change it from blue to red lines for linear open space. We can revise. 8  Is a berm proposed within the buffer along I-84? It says so in the narrative but it’s not depicted on the LP. It doesn’t appear that there’s room for one with the pathway. We do not intend to construct a berm at the north end of the site based on the recommendation from the sound engineer.  There is a discrepancy between the plat & the CUP LP – the buffer on the plat is 50’ and the buffer on the CUP LP is 35’ along the I-84 off-ramp, which is it? Tamara please clarify. Commented \[TT8\]: 35’  There is a discrepancy between the plat & the CUP LP – the buffer along Wells is 10’ with an attached sidewalk on the PP LP and 25’ with a detached 10’ pathway on the CUP LP. Tamara please clarify. Commented \[TT9\]: 10’ with attached sidewalk.  What are “parcel” lockers? An electronic parcel locker is a safe, secure and convenient package delivery and retrieval solution for multifamily communities, retail stores, commercial buildings and university campuses. Parcel lockers can accept deliveries from any courier with packages sent from friends, family, and online retailers. Additionally, recipients don’t need to worry about package theft or misplaced parcels, as electronic parcel lockers protect at the last mile of package delivery. Packages are safe and secure until they are picked up. Parcel pick-up is quick and easy. After a notification is sent, a recipient uses a unique delivery code to retrieve their package whenever best suits their schedule. Additionally, Parcel Pending’s mobile app can be used to manage and retrieve packages. The app sends delivery notifications, opens lockers via bluetooth or a bar scan, and stores package history. https://www.luxerone.com/ History  The Seasons at Meridian Site is a 15.85-acre parcel at 2700 East Overland Road (Parcel S1117438451).  The 34.62-acre property including this Site and the Winco site, formerly known as the Thomas and Wurst properties, was annexed in 1994 and zoned C-G (Ordinance Nos. 661, 661A & 665).  It was part of a larger 167 acre area that included the I-84/Eagle interchange to the north and St. Luke’s Hospital to the northeast of the interchange. The St Luke’s property entered into a development agreement (Instrument No. 1002183, Amended as Instrument No. 101048098).  On June 28, 2016, the City Council approved a Development Agreement governing this Site and the Winco site (Volante Investments H2016-0056, Instrument No. 2016- 030157, dated July 5, 2016 and recorded July 7, 2016) (“DA”).  The DA allows an 85,000 square foot retail building on the Winco site and calls for a DA Modification to include conceptual development plans for our Site once known. We present this conceptual plan with the accompanying applications. 9 Noise Abatement Buildings along the north side of the Site are set back at least 250’ from the freeway. UDC 11- 3H-4 requires noise abatement measures for residential properties that adjoin state highways. The prescribed measures include a wall and berm unless the Director approves alternative Commented \[TT10\]: Technically, we’re adjacent to the off-ramp where cars are slowing, not the highway. compliance based on a substitute noise abatement proposal by a qualified sound engineer. We also want to ensure all of our apartments appeal to residents. We hired a sound engineer, Bionomics Environmental, Inc., to recommend appropriate noise abatement measures for the project. Bionomics recommended we install double-paned windows for windows that face the freeway. In the Bionomics report, attached to this Narrative as Exhibit B, the sound engineer explains that a wall would not be effective here for several reasons, including: the site is too distant from I-84; community noise becomes a greater factor at this distance; walls only mitigate for the receptors directly behind them and so do not offer any protection for second and third stories; double-paned windows would benefit all three stories; a wall only provides an approximate seven dB reduction while double-paned windows provide 20dB reduction. The report also notes that the elevation difference and the terrain shields the tires of vehicles on both I-84 and the off ramp, minimizing noise impacts in this location. Based on these findings, we request the Director to approve Alternative Compliance to allow the double-paned windows as noise abatement measures in lieu of a berm and wall. 10