CC - Staff Report 3-23 STAFF REPORT C:�*%-
W IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT
HEARING 3/23/2021
Legend
DATE: L
Iff ProjE-1 Lflcfl�ior
0
TO: Mayor&City Council
FROM: Joseph Dodson,Associate Planner RUT
R-_
208-884-5533 R-8
R�, R=
SUBJECT: FP-2021-0010 •
Oaks North No. 9 R-1 R-1
LOCATION: Generally located '/z mile north of the
half-mile mark of W. McMillan Road
UT
between McDermott Road and Black Cat
Road,in the SW '/4 of the NE '/4 of - R-
Section 28,TAN.,R.1W. R_4 RUT
I. PROJECT DESCRIPTION
Final plat consisting of 20 building lots and 3 common lots on 7.4 acres of land in the R-4 zoning
district.
II. APPLICANT INFORMATION
A. Applicant/Owner:
Toll Southwest,LLC—3101 W. Sheryl Drive, Suite 100,Meridian, ID 83642
B. Representative:
Sabrina Durtschi,Toll Brothers—3103 W. Sheryl Drive,Meridian, ID 83642
III. STAFF ANALYSIS
Staff has reviewed the proposed final plat for substantial compliance with the preliminary plat as
required by UDC 11-6B-3C.2. This is the ninth phase of development of the Oaks North Subdivision.
The same number of buildable lots, common lots, and amount of open space is proposed as were
approved in the preliminary plat. Staff finds the proposed final plat is in substantial compliance with
the approved preliminary plat as required.
IV. DECISION
A. Staff:
Staff recommends approval of the proposed final plat with the conditions of approval in Section
VI of this report.
Page 1
V. EXHIBITS
A. Preliminary Plat(date: 8/6/2013)
i $0
M
v ��I�a
r-- ------ ---------- —�
I I will
I azrm EE'C 1 I
N �
Area of Phase 9
-------- xor' • - _w _ --i -
HUT i HUT
I -, •- - _ _ RUT
� �•`•���_ _ i I II II SQL � g.[
IF I
I
I -
I
I PLAT
I I wa.ar i :i:l
e$
6 i x z®_
i
•H.5
I .w I �• I AfIT � d�+� ���
� i I FFFIII
-.7-1- TO-- ——TI t I T 7 T T r1 "R.Zr 3s� ,ti,,,•
L ------- 1 1 _J' 1LAY1 I 1111 /, —•-iLL1 c was—�i — 41- L�lI iI iI Tn I . -
I I II I , I r ,'x r LFp 9rr 7+T—T Hj
pP REP
Page 2
B. Final Plat(date: 1/22/2021)
THE OAKS NORTH SUBDIVISION NO.9 BOOK PAGE
LOCATED IN THE SW 114 OF THE NE 114 OF SECTION 28,T4N,R1 W,BM
MERIDIAN,ADA COUNTY,IDAHO
2021 LEGEND
k DHINDEN BLw. - i,e
m�aa _-- W _ mxrlsnnc
uuaun=_o � O - ,x PLsnua
�Sr,1rN�L�xn
w s> UNPLATTED K
PBi4F -------------
___ Nr c
f � rCA
a
Ors 3
4
LNNFATTEo is US',. s� cLs -' I.. �,..mF.Nor5 ,«....... ....
ROS5717 L 1 RI S ! sxof�
ANro
�-" K e a 3 UNPLATTED 'aI ".
��,X
LN I• r � :. �xE9l _ ��tts
O �q r. 1
_'r� f
POINT OF 9 U .,N69'1602'W I]b 50�
BEGINNING s.sv_.LI i. "" pN69MG02-W' ancwTs rcnrTxwn"..�uram erx
- NB97K02 W17050� 13150
_+0 N69'1GOYyLI I'
—��}ura
-
THE OAKS NORTH SUDD,NO 6
FAGES
BOG( uw nE�assi... .�.w-cEow.0 n.rYnwno xE.°aaas
.®-vzmas any-tasxl5 /i!P LUEf c
LME-A9-E 3 9i�qy
DGFVE inu C vas��� 6�"�pltu•�.g
ac tl.a r-}1 - SON W.H♦`�
SVRVEY NARRATIVE U w La17do bf pions
Land Surveying and Consulting
gut
,Mx,.x=oxH—.rox Txi.-.xaaNi.iox rn_xiolan.c
SHEET 1 OF 3
Page 3
THE OAKS NORTH SUBDIVISION NO.9 BOOK .PACE
CERTIFICATE OF OWNERS AGKNOWLEOGMENT
- n......
LTOlrvcLUDETr¢Fou-IIIIVEscRIaEE PRaPERT`nTIFI a of 1OFIVTv
THE NORTH UUDDIVICON NO 9.
rF,cr snn FTic 11 u"s. 11
TH
PTEnoE ry SO'— A C18TANCE o F s1.50FEET TO A acwT. CERTIFICATE OF SURVEYOR
cF wEalnun Fws,,.,REEo lry walnrvs To sEa.E�.0 THE wT�Irv-ws sUaolnslorv. TiF`I�oF r.ralri,�v TUF c�Tv EAR
e°
- - F a 111,S m
ErerannEHr STRUCTURE*QTFE1 THAN Fo-D us 01
Es TO EE EreEITED nnTH THE PES I1 r OF MID �ez(ag
IN 70IrnE 01_-REOrw IWME I IEREunTa KT aVR HAND TI lls DAY OF eJ ry C�oH W.NF�
U dSolutions
k____—_Land Surveying and Consulting
SHEET 2 OF 3
Page 4
C. Landscape Plans(date: 2/23/2021)
OAKS NORTH - _ }-IU U 'Q Kri NORTH PHA S
PHASE® I � --
L_Li_T
FTOI , loop,
HT, =
ENSEriaEars
I
� r - r
"PA KS,:
i
� T
Z o a
-�—
AKS - en
-� OAKS NO TH O o J
3 Z f
r I U? a
AKS NOR H Q a
O
Z
H —
tL_
T OpK3 NORT P 1
NOTES
L--------- ---- i J_L 7_L ' I 7 1
W.MCMILLAN�ROAD
LAN�SGAPE
PEAN
® «L1.0
Page 5
�, -- -- = PLAN'SGi-i�DJLE
r l � ' i s _ :•' � 4 h �_", x :.rrr«A S JENSENBFL7!
zz 0
-
T Ire liiiif"���II O o �
� r! II w f
d
ll
I�i o
PLANT SGHSDU_r=
_ FTTTTFFM
..,a,.
At
0 IR£E.y4'LAV NGF_AKING vs< CJ, vIM1IYL Vklvhc."FtW t P:a
d vac 10 ErJ Q
n y..�.m..,_ rmr,em
s�f'`r". LANDSCAPE GALGULA'IONS
z O a
_ x Q
H — o
...:..... ,,.......,�.,:v :ate ¢ z Z
"'LL O o
�'il R2L9 F'LAV—IVG - W, ��; ,f rsr, •• z ¢ ~
fn
Y a
e PLAN
L1.2
Page 6
VI. CITY/AGENCY COMMENTS & CONDITIONS
A. Planning Division
Site Specific Conditions:
1. Applicant shall comply with all previous conditions of approval associated with this
development(AZ-13-008,RZ-13-015,DA Inst.No. 114030972; PP-13-014).
2. The applicant shall obtain the City Engineer's signature on the final plat within two(2)years
of the City Engineer's signature on the previous phase final plat, in accord with UDC 11-6B-
7 in order for the preliminary plat to remain valid or a time extension may be requested.
3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the
accompanying acknowledgement signed and notarized.
4. The final plat shown in Section V.B prepared by Land Solutions, stamped on 01/22/21 by
Clinton W. Hansen, is approved with the following revisions:
a. Note#10: Include the recorded Development Agreement instrument number;
b. Note#12: Include recorded instrument number.
5. The landscape plan shown in Section V.0 prepared by Jensen Belts Associates,dated 02/23/21,
is approved as submitted.
6. Future homes constructed in this phase shall comply with the elevations included in the
development agreement (Oaks North and South Subdivision — Inst. No. 114030972) with
materials and architectural features to be the same or higher quality as shown in the elevations.
7. Prior to the issuance of any new building permit,the property shall be subdivided in accordance
with the UDC.
8. Prior to signature of the final plat by the City Engineer,the applicant shall provide a letter from
the United States Postal Service stating that the applicant has received approval for the location
of mailboxes. Contact the Meridian Postmaster, Sue Prescott, at 887-1620 for more
information.
9. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat
and/or development agreement does not relieve the Applicant of responsibility for compliance.
B. Public Works
Site Specific Conditions:
1. Reserve correct streetlight numbers. The spacing appears to meet requirements.
2. Applicant needs to add the engineering design of the gravity irrigation piping into their
development plans. Please refer to the Public Works Department design Standards when
designing these works.
General Conditions:
3. Sanitary sewer service to this development is available via extension of existing mains adjacent
to the development.The applicant shall install mains to and through this subdivision; applicant
shall coordinate main size and routing with the Public Works Department,and execute standard
forms of easements for any mains that are required to provide service. Minimum cover over
sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than
alternate materials shall be used in conformance of City of Meridian Public Works Departments
Standard Specifications.
Page 7
4. Water service to this site is available via extension of existing mains adjacent to the
development. The applicant shall be responsible to install water mains to and through this
development, coordinate main size and routing with Public Works.
5. All improvements related to public life,safety and health shall be completed prior to occupancy
of the structures. Where approved by the City Engineer, an owner may post a performance
surety for such improvements in order to obtain City Engineer signature on the final plat as set
forth in UDC 11-5C-3B.
6. Upon installation of the landscaping and prior to inspection by Planning Department staff,the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
7. A letter of credit or cash surety in the amount of 110% will be required for all incomplete
fencing, landscaping, amenities,pressurized irrigation,prior to signature on the final plat.
8. The City of Meridian requires that the owner post with the City a performance surety in the
amount of 125% of the total construction cost for all incomplete sewer, water infrastructure
prior to final plat signature. This surety will be verified by a line item cost estimate provided
by the owner to the City. The applicant shall be required to enter into a Development Surety
Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable
letter of credit, cash deposit or bond. Applicant must file an application for surety, which can
be found on the Community Development Department website. Please contact Land
Development Service for more information at 887-2211.
9. The City of Meridian requires that the owner post to the City a warranty surety in the amount
of 20% of the total construction cost for all completed sewer, and water infrastructure for a
duration of two years. This surety amount will be verified by a line item final cost invoicing
provided by the owner to the City. The surety can be posted in the form of an irrevocable letter
of credit, cash deposit or bond. Applicant must file an application for surety, which can be
found on the Community Development Department website. Please contact Land
Development Service for more information at 887-2211.
10. In the event that an applicant and/or owner cannot complete non-life,non-safety and non-health
improvements, prior to City Engineer signature on the final plat and/or prior to occupancy, a
surety agreement may be approved as set forth in UDC 11-5C-3C.
11. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process, prior to the issuance of a plan
approval letter.
12. It shall be the responsibility of the applicant to ensure that all development features comply
with the Americans with Disabilities Act and the Fair Housing Act.
13. Applicant shall be responsible for application and compliance with any Section 404 Permitting
that may be required by the Army Corps of Engineers.
14. Developer shall coordinate mailbox locations with the Meridian Post Office.
15. All grading of the site shall be performed in conformance with MCC 11-1-4B.
16. Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill,where footing would sit atop fill material.
17. The engineer shall be required to certify that the street centerline elevations are set a minimum
of 3-feet above the highest established peak groundwater elevation. This is to ensure that the
bottom elevation of the crawl spaces of homes is at least 1-foot above.
Page 8
18. The applicants design engineer shall be responsible for inspection of all irrigation and/or
drainage facility within this project that do not fall under the jurisdiction of an irrigation district
or ACHD. The design engineer shall provide certification that the facilities have been installed
in accordance with the approved design plans. This certification will be required before a
certificate of occupancy is issued for any structures within the project.
19. At the completion of the project, the applicant shall be responsible to submit record drawings
per the City of Meridian AutoCAD standards. These record drawings must be received and
approved prior to the issuance of a certification of occupancy for any structures within the
project.
20. Street light plan requirements are listed in section 6-7 of the Improvement Standards for Street
Lighting (http://www.meridiancity.org/public_works.aspx?id=272). All street lights shall be
installed at developer's expense. Final design shall be submitted as part of the development
plan set for approval, which must include the location of any existing street lights. The
contractor's work and materials shall conform to the ISPWC and the City of Meridian
Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and
Utility Coordinator at 898-5500 for information on the locations of existing street lighting.
21. The applicant shall provide easement(s)for all public water/sewer mains outside of public right
of way (include all water services and hydrants). The easement widths shall be 20-feet wide
for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat,
but rather dedicated outside the plat process using the City of Meridian's standard forms. The
easement shall be graphically depicted on the plat for reference purposes. Submit an executed
easement(on the form available from Public Works), a legal description prepared by an Idaho
Licensed Professional Land Surveyor, which must include the area of the easement (marked
EXHIBIT A) and an 81/2" x I I" map with bearings and distances (marked EXHIBIT B) for
review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO
NOT RECORD. Add a note to the plat referencing this document. All easements must be
submitted,reviewed, and approved prior to signature of the final plat by the City Engineer.
22. Applicant shall be responsible for application and compliance with and NPDES permitting that
may be required by the Environmental Protection Agency.
23. Any existing domestic well system within this project shall be removed from domestic service
per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Water Department at
(208)888-5242 for inspections of disconnection of services. Wells may be used for non-
domestic purposes such as landscape irrigation if approved by Idaho Department of Water
Resources.
24. Any existing septic systems within this project shall be removed from service per City
Ordinance Section 9-1-4 and 9 4 8. Contact the Central District Health Department for
abandonment procedures and inspections.
25. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water(MCC 9-1-28.C.1).The applicant should be required to use any existing surface
or well water for the primary source. If a surface or well source is not available,a single-point
connection to the culinary water system shall be required. If a single-point connection is
utilized,the developer will be responsible for the payment of assessments for the common areas
prior to development plan approval.
26. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting,
crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per
UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207
and any other applicable law or regulation.
Page 9