Loading...
Narrative 839266 - 1776 North Avest Lane, Meridian, ID 83642 1505 Westlake Ave N, Seattle, WA 98109 Phone: (206) 336-3204 www.crowncastle.com March 8, 2021 City of Meridian Community Development Planning Division 33 E. Broadway Ave., Ste 102 Meridian, ID 83642 Via Electronic Submittal **********NOTICE OF ELIGIBLE FACILITIES REQUEST********** RE: Request for Minor Modification to Existing Wireless Facility – Section 6409 Site Address: 1776 North Avest Lane, Meridian, ID 83642 Crown Site Number: 839266 / Crown Site Name: Fairview & Locus Grove Customer Site Number: SL04376A / Application Number: 537340 Dear Reviewing Parties: On behalf of T-Mobile (“Applicant”), Crown Castle USA Inc. (“Crown Castle”) is pleased to submit this request to modify the existing wireless noted above through the collocation, replacement and/or removal of the Applicant’s equipment as an eligible facilities request for a minor modification under Section 6409 1 and the rules of the Federal Communications Commission (“FCC”).2 Section 6409 mandates that state and local governments must approve any eligible facilities request for the modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station. If a state or local government, fails to issue any approvals required for this request within 60 days, these approvals are deemed granted. The FCC has clarified that the 60 day deadline begins when an applicant: (1) takes the first step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that this modification qualifies under the federal law. Please note that with the submission of this letter and enclosed items, the sixty day review period has started. Based on this filing, the deadline for issuance of approval is May 7, 2021. The proposed scope of work for this project includes: T-Mobile proposes to remove (1) Sprint platform mount, (3) Sprint antennas, (3) Sprint RRUs, (3) Sprint diplexers, and (3) Sprint hybrid cables; and install (3) sector frame mounts, (1) ring mount, (9) 1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, § 6409 (2012) (codified at 47 U.S.C. § 1455). 2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865 (2014) (codified at 47 CFR § 1.6100); and Implementation of State & Local Governments’ Obligation to Approve Certain Wireless Facility Modification Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250 (June 10, 2020). 839266 - 1776 North Avest Lane, Meridian, ID 83642 1505 Westlake Ave N, Seattle, WA 98109 Phone: (206) 336-3204 www.crowncastle.com antennas, (9) RRUs, and (4) hybrid cables on existing tower. T-Mobile also proposes to remove (2) Sprint cabinets, (1) Sprint PPC, and (1) Sprint telco box; and upgrade from 100A to 200A; and install (2) cabinets, (5) baseband units, (1) remote base station, (1) power supply unit, (1) GPS antennas, (1) SPD box, (1) disconnect, (1) PPC w/Camlok, (1) telco box, and (1) LED light w/timer within existing compound. No tower height extension or compound expansion proposed. At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409. Additionally, please find enclosed the following information in support of this request: •(1) Cover Letter •(1) Section 6409 Substantial Change Checklist •(1) Development Review Application •(1) Certificate of Zoning Compliance Checklist •(1) Memorandum of Lease (In lieu of Affidavit) •(1) Specialty Warranty Deed •(1) Address Verification •(1) Site Plan stamped by Idaho State engineer •(1) Construction Drawings stamped by Idaho State engineer Project Valuation: $35,000 As these documents indicate, (i) the modification involves the collocation, removal or replacement of transmission equipment; and (ii) such modification will not substantially change the physical dimensions of such tower or base station. As such, it is an “eligible facilities request” as defined in the FCC’s rules to which the 60 day deadline for approval applies. Accordingly, Applicant requests all authorization necessary for this proposed minor modification under Section 6409. Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any request for related information you may have in connection with this request. Please let us know how we can work with you to expedite the approval process. We look forward to working with you on this important project, which will improve wireless telecommunication services in your community using collocation on existing infrastructure. If you have any questions, please do not hesitate to contact me. Regards, Sarah Baird Site Acquisition Specialist Crown Castle Agent for Applicant (206) 336-3204 839266 - 1776 North Avest Lane, Meridian, ID 83642 1505 Westlake Ave N, Seattle, WA 98109 Phone: (206) 336-3204 www.crowncastle.com Sarah.Baird@crowncastle.com 839266 - 1776 North Avest Lane, Meridian, ID 83642 1505 Westlake Ave N, Seattle, WA 98109 Phone: (206) 336-3204 www.crowncastle.com Section 6409 Substantial Change Checklist Towers Outside of the Public Right of Way The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a wireless tower or base station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100. Criteria for Towers Outside the Public Rights of Way YES/NO NO Does the modification increase the height of the tower by more than the greater of: (a) 10%; or (b) the height of an additional antenna array plus separation of up to 20 feet from the top of the nearest existing antenna? YES/NO NO Does the modification add an appurtenance to the body of the tower that would protrude from the edge of the tower more than 20 feet or more than the width of the tower structure at the level of the appurtenance, whichever is greater? YES/NO NO Does the modification involve the installation of more than the standard number of new equipment cabinets for the technology involved or add more than four new equipment cabinets? YES/NO NO Does the modification entail any excavation or deployment outside the current site by more than 30 feet in any direction, not including any access or utility easements?? YES/NO NO Does the modification defeat the concealment elements of the eligible support structure? YES/NO NO Does the modification violate conditions associated with the siting approval with the prior approval the tower or base station other than as specified in 47 C.F.R. § 1.6100(c)(7)(i) – (iv)? If all questions in the above are area answered “NO,” then the modification does not constitute a substantial change to the existing tower under 47 C.F.R. § 1.6100.