A-3.0_Elev (1)\ ' J \"J n5
n4 \'J \GJ \1J
200'-0"
30'-0"
30'-0"
40'-0"
40'-0"
30'-0"
30'-0"
9
t
C 9 o
10
E:I=
10
�
10
===1
10
10
10
7
10
10 10
F
El
F
rl
==L—L
ElEl
V=le':l1E:l4
9E]E,71=30
5 1 4 12 4
1 5 4
1 12 4
4
12 1 4 5 1 4
12 4 1 5
SOUTH ELEVATION
EAST ELEVATION
KEY NOTES
Ol ALUMINUM STOREFRONT DOOR.
OINSULATED HOLLOW METAL EXIT DOOR.
OINSULATED HOLLOW METAL FIRE RISER DOOR.
04 INSULATED OVERHEAD DOOR.
OALUMINUM STOREFRONT WINDOW SYSTEM.
OHIGH GRADE METAL SIDING OVER OSB,
COLOR SLATE GRAY
�7 HTT (HIGH TECH TILT) PANELS, PAINTED
O45 MIL. SINGLE -PLY ROOFING OVER (2) LAYERS
OF 3" RIGID INSULATION OVER PLYWOOD
DECKING PER STRUCTURAL
SCALE: %" = 1'-0"
SCALE: %" = 1'-0"
EXTERIOR NOTES
1. VERIFY ALL MATERIALS AND ROOF
09
PRE -FINISHED METAL FACIA
PITCHES SHOWN IN THESE DRAWINGS
WITH SUBDIVISION CC&R'S PRIOR TO
CONSTRUCTION.
10
METAL AWNING
2. DO NOT SCALE ELEVATIONS. VERIFY
ALL UNKNOWN DIMENSIONS WITH
11
EXTERIOR GRADE
ARCHITECT PRIOR TO CONSTRUCTION.
3. INSTALL ALL EXTERIOR FINISHES PER
12
STONE VENEER BASE
MANUFACTURES SPECIFICATIONS.
Z+)
ARCHITECTURE
DESIGNS PLUS, RA,
PROFESSIONAL SEAL
co
Z'_ U
� O
U
� O
c'J �
� 6)
Ww�
W q 'o
W�
n
� O
H
O � �
�OOQ�
U
I�
2 � O
� � W
W
JOB NO: 20199
DATE: 0120/21
DRAWN BY: GW
SHEET NUMBER
A-3.0
PLOT DATE.
Jw 26, z021- 9:46
W
�
q
N
N
o
Ca
zU
O
o
U
�
O
�
w
W
�
W