Loading...
Landscape Plan CZCPB2 PS3 BB3 JH2 GT2 JH2 GT2 JH2 BB3JH2BB1 JH2 GT1 JH5 RM4 JH2 GT1 CO4 PA5 JS10 BB2 SJ18 JH7 PB2 BB2 PB2 BB2 BB6 RM7 BB3 AP3 HH4 JH1 CA3 PK1 HH4 JH1 CA3 PK1 CO5 RM13 BB3 CO3 LL10 BB3 RM3 PA5 TC2 TC3 PO13 HH3 RM5 JS1 RM5 BB2 RM5 RM5 JS1 RM5 RM5 BB2 RM5 JS1 RM5 PB3 CO3 PO6 PB2 PO3 PB2 CO3 AR3 PC2 CO6 BB6 RM18 PC1 PC2 BB6 RM8 CO2 PC2 AR1 PB3 PK6 AR2PC3 USER:JOHN ROTERS LOCATION:W:\PROJECTS\CK ENGINEERING\21-014 HICKORY STREET\CAD\SHEETS\21-014 950 N HICKORY_LANDSCAPE PLAN_1-26-2021.DWG PRINT DATE:2/3/2021 1:00 PMCALL 2 BUSINESS DAYSIN ADVANCE BEFOREYOU DIG, GRADE, OREXCAVATE FOR THEMARKING OFUNDERGROUNDMEMBER UTILITIES Call before you dig.Know what's below.RSouth Landscape Architecture P.C.Dba South Beck & Baird Landscape Architecture P.C.2002 S. Vista AveBoise, ID 83705208.342.2999 Officeinfo@sbbgo.comwww.sbbgo.comAll rights reserved. Reproduction or use in any form or by any means without written permission of South Landscape Architecture P.C. Dba South Beck & Baird Landscape Architecture P.C. is unlawful and subject to criminal prosecution. No.Date Description THE PROFESSIONAL SERVICES OF THE DESIGN PROFESSIONAL ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF "THE CLIENT" NO CONTRACTUAL OBLIGATION IS ASSUMED BY THE DESIGN PROFESSIONAL FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.1 02/03/21 Parking Lot L1.10 FO S C A P E ARCHITECTDNAL D ESNECIL ETATS IDA H OD.HOJ OTER RN S LA - 16827 LANDSCAPE NOTES PLANT SCHEDULE 1 GENERAL LANDSCAPE NOTES SITE FEATURES 2