Loading...
SITE DETAILS LS NOTES 10. Immediately clean up any topsoil, or other debris on site created from landscape operation and dispose of off site.7. Fertilize all trees and shrubs with "Agriform 20-10-5" 21 gram planting tablets. Quantity per manufacture's recommendation. in planting bed areas. or other foreign material larger than 1" in any dimension, with a Pn of 5.5 to 7.0. Material from the site may be used if it shall be a loose, friable, sandy loam, clean and free of toxic materials., noxious weeds, weed seeds, rock, grass or 6. All sodded areas shall have a minimum of 6" top soil and all planting beds shall have a minimum of 18" top soil. Top soil 5. Planting backfill for trees and planting beds shall be 5 parts topsoil and 1 part compost. Stake trees per detail.4. All plant material shall be guaranteed for one year beginning at the date of acceptance by Owner. Replace irregularities with weighted roller. 3. All lawn areas shall be sodded with Turf Type Tall Fescue grass . Sod to be placed within 48 hours of cutting. Immediately 3" of small (1") BARK MULCH.PLANTING NOTES2. All planting beds and tree wells in lawn areas (wells to be 3' diameter) shall be covered with a minimum of 9. All planting beds adjacent to lawn areas shall have a concrete mow strip. species and variety for review. Alternate plants shall be the same form, texture and color as that specified.8. Plant material shall not be substituted without the written permission of Architect. Submit names of alternate plant meets these standards. Place 1/2" compost over all planter areas and rototill into top 4". Spread, compact and fine grade topsoil to a smooth and uniform grade, 1" below surface of walks and curbs in areas to be sodded and 3" plant material found dead or not in a healthy condition immediately with the same size and species at no cost to Owner. after placement water to saturate sod and top 4" of top soil. When adequately dry roll to remove minor1. All plant material shall conform to the American Nurseryman Standards for type and size shown. D. Coordinate installation of PVC sleeves under drives and walks with General Contractor. 1. Disk Filter, or equivalent. Size as required per manufacturer's recommendation. 2. Larger lawn areas: Rainbird T-Bird series heads. 3. Manual drain valve; brass, 1/2" gate or ball. Place in 2" PVC class 200 sleeve (length as required to be flush with (length as required to be flush with finish grade) with locking valve marker. 2. Manual shut-off valves; brass gate, size same as mainline, non-rising stem. Place in 2" PVC class 200 sleeve 1. Circuit valves; Weathermatic 11000, sized as not to lose more than 4 PSI through valve. heads OR a minimum of 12" (maximum of 18") of Swing Riser Pipe and Swing Riser Fittings may be substituted minimum of 6" long. All other nipples on swing assembly shall be of length required for proper installation of 4. All heads shall include a triple swing assembly. Horizontal nipple (parallel to side of lateral lines) shall be a 3. Shrub Areas; Netafim RAM tubing 1 GPH/18" Dripperline. 1. Small lawn areas: Rainbird, Richdel or approved equal commercial heads with plastic MPR nozzles. 4. Provide 4" PVC sleeves under paving and walks. 1. Pipe for pressure lines (mainlines) and lateral lines shall be class 200 PVC. 1. One valve key each for shut-off and drain valve. A. Provide Owner with the following extra stock items. C. At the beginning of the first winter, drain, blow out, and make any required adjustments to the system, to insure B. Provide operation and maintenance instructions to the Owner for proper operation, maintenance. valves, backflow prevention device and controller. A. Submit manufacturer's operation and maintenance manuals, to include manufacturer's parts catalog, for each head type, B. Final payment for sprinkler system will not be authorized until accurate and complete record drawings are submitted. A. Prepare an accurate record drawing, as installation proceeds to be submitted prior to final inspection. C. Coordinate all irrigation work with existing utilities and respective trades. B. Coordinate head location with plant material. UNDERGROUND SPRINKLER SYSTEM PERFORMANCE SPECIFICATIONS A. Install new landscape sprinkler system to provide full coverage for all landscaped areas. A. Pipe and pipe fittings: 3. Sleeving shall be class 200 PVC. 2. Fittings shall be schedule 40 PVC. for the triple swing assembly. B. Sprinkler heads and nozzles: finish grade) with locking valve marker. C. Valves: D. Filter: 3. One head of each type. 2. One valve marker keys. complete winterization.1. MaterialsPRODUCTS4. Extra Stock:3. Maintenance:2. Submittals: 1. Description: GENERAL 1. Commercial grade digital controller station number as required. G. Mount all valves in Brooks or equal underground box flush with finish grade. wire placed next to main line. provide a 10"-12" expansion coil at 100' intervals. Splices at valves shall be with UL listed waterproof wire connectors. No splices shall be permitted between valve boxes and controller. 1. Febco. 805Y Double Check Backflow Prevention Assembly (or approved equal), size to not exceed 7.5 FPS through valve, provide with galvanized steel nipples and fittings from manual shut-off valve to beginning of 2. Control wire shall be UF-UL listed annealed copper conductor direct burial. Minimum size, 14 gauge. Control PVC mainline. Provide blowout fitting and plug. F. Backflow Preventer: E. Controller:AUTOCONTROL VALVECOMPRESSEDMANUALMANUAL2 CUBIC FEETDRAINAGE FILLSUPPLYBALLVALVEAIR FITTINGVALVEDRAINDOUBLECHECK VALUEDIRECTIONOF FLOW13. (2) #5 rebar X 12" each side.4'-0"16. Existing concrete walk. Protect in place.14. NOT USED15. NOT USED12"12"+24" - VERIFYGRATE WIDTHTREE & SHRUB NOTE7. Soil fill shall not be above natural soilsecured with rubber hose in a figure 8 pattern.4. Tree support will be (2) 2"x2"x8' stakes3. Root ball, trim any broken or frayed roots.1. Measure caliper @ 6" high from tree base.6. Top dressing if required.12. New Concrete surround.8. Finish grade.line of root ball11. Curb or sidewalk10. 2" bark mulch w/ pre-emergent.9. Backfill with 6" min. good top soil.5. Secure hose with nail2. 1"-1 1/2" deep basin for water2'-6"DATE:DRAWN:PROJECT:220014 10-19-2020 Mc DESIGN REVIEW SUBMITTAL 1 1-25-2121 DR COMMENTS RESPONSE 1