Wall SectionsFIRST FLOOR
100' - 0"
TOP OF WALL
115' - 4"
TOP OF STEM WALL
102' - 0"
STEM WALL AND FOOTING,
REFER TO STRUCTURAL.
CMU WALL, REFER TO PLAN.
3
A8.2
PROVIDE MIN R-10
CONTINUOUS INSULATION AT
FOUNDATION STEM WALL
FACE. MECHANICALLY FASTEN
PER MANUFACTURER'S
REQUIREMENTS.
VAPOR RETARDER, REFER TO
SPECIFICATIONS.3' - 0"5' - 8"
4' - 0"
TOP OF CANOPY
110' -0"
1/4" / 12" SLOPE
STEEL ANGLE, REFER
TO STRUCTURAL.
ROOF DECK, REFER TO
STRUCTURAL. PRIMED
AND PAINTED TO
MATCH FRAMING
STEEL CHANNEL, REFER
TO STRUCTURAL.
STEEL ANGLE, REFER
TO STRUCTURAL.
FIRST FLOOR
100' - 0"
TOP OF WALL
115' - 4"
TOP OF STEM WALL
102' - 0"
STEM WALL AND FOOTING,
REFER TO STRUCTURAL.
CMU WALL, REFER TO PLAN.
DOWNSPOUT.
GUTTER.
11
A8.1
10
A8.1
8
A8.1
PROVIDE MIN R-10
CONTINUOUS INSULATION AT
FOUNDATION STEM WALL
FACE. MECHANICALLY FASTEN
PER MANUFACTURER'S
REQUIREMENTS.
VAPOR RETARDER, REFER TO
SPECIFICATIONS.
N1
THIS DRAWING WAS PREPARED BY POWER
ARCHITECTURAL CONSULTANTS, INC. FOR A
SPECIFIC PROJECT. TAKING INTO CONSIDERATION
THE SPECIFIC AND UNIQUE REQUIRMENTS OF THE
PROJECT. REUSE OF THIS DRAWING OR ANY
INFORMATION CONTAINED IN THIS DRAWING FOR
ANY PURPOSE IS PROHIBITED UNLESS WRITTEN
PERMISSION FROM BOTH POWER AND POWER'S
CLIENT IS GRANTED.
DRAWING NO.
BAR IS ONE INCH ON
FULL SIZE DRAWING
0 1"
IDAHO OFFICES
BOISE · LEWISTON · MCCALL
ENGINEERING AND ENVIRONMENTAL SOLUTIONS
1161 W RIVER ST, STE 130
BOISE, IDAHO 83702
208.780.3990 DATE
PROJECT
VERIFY SCALENO.REVISION BY DATE DESIGN
DRAWN
CHECKED
APPROVED
10/22/20
TOW1/27/2021 11:20:37 AMA3.1
CITY OF MERIDIAN
WALL SECTIONS
167064
YM
BJT
SJB
WELL 17 TREATMENT FACILITY
SCALE: 3/4" = 1'-0"
SECTION 11
SCALE: 1 1/2" = 1'-0"
CANOPY DETAIL3
SCALE: 3/4" = 1'-0"
SECTION 22
PRELIMINARY
NOT FOR
CONSTRUCTION
A ISSUED FOR 90% REVIEW BJT 01/27/21