Loading...
PZ - Geotech IT Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ON/ S L LTING, LL Trilogy Development March 10, 2021 Mr. Shawn Brownlee File#21844-13 9839 West Cable Car Street, #101 Page 1 of 26 Boise, Idaho 83709 Re: Geotechnical Recommendation Report Foxcroft Subdivision Property Meridian, Idaho 83642 Shawn: As per your authorization, this consultant has prepared the following Geotechnical Evaluation & Recommendation Report for your proposed Foxcroft Subdivision, a residential and commercial development, to be constructed on West Pine Avenue, west of North Ten Mile Road in Meridian, Idaho. Based on the results of our investigation and evaluation, we believe the property is acceptable, from a geotechnical perspective, for the proposed residential subdivision and commercial building development. Please see the following executive summary for our recommendations and items of concern. It is noted SITE previously issued a project feasibility report for this project. That report (#20005-A, dated 11/1612020) contained the historical groundwater monitoring for this project and is included by reference. The construction and civil engineering recommendations presented within this report are to be incorporated into the project plans and specifications and adhered to during design and construction. Recommendations are provided for the design and construction of earthwork, foundations, slab on grade concrete, flexible pavements, storm water disposal and inspection, and compaction testing requirements. We appreciate this opportunity to be of service and we look forward to working with you during the design and construction of this project. Should you have any questions or require additional information, please contact our office at your convenience. Respectfully submitted; Bob J. Arnold, PE ��®®NAL SITE Consulting, G1aTZ,0�� AX s� ®F ,®�®�Q J v a Geotechnica/services/soil Testing&Inspection services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 CONSULTING., LLC EXECUTIVE SUMMARY • GROUNDWATER - North of Pine Avenue, groundwater was encountered at depth of 6-10 feet in test pits excavated to depths of 7-10 feet deep in mid-May 2019. South of Pine Avenue, groundwater was encountered at a depth of 6-7 feet in onsite test pits excavated to depths of 6-8 feet deep in mid-August 2020. Three well logs for the subject and nearby properties from the IDWR website indicate the groundwater in • EXPANSIVE CLAY - No clay soil of concern was observed or sampled on the property. Clay of concern would be a fat clay with the potential for large volume changes based upon moisture content. • BEDROCK - Bedrock was not encountered in test pits that extended up to 10 feet deep. Well logs for the subject property obtained from IDWR indicate no bedrock is present. Available Geologic Mapping also indicate no bedrock is present. • FOUNDATIONS - Normal foundation construction is anticipated for both residential and commercial construction. Both slab on grade floors and conventional crawlspaces are acceptable. • PAVEMENT SECTIONS - An R-Value test resulted in reducing the pavement section for interior, residential streets within this development. Pavement sections are provided for Traffic Indexes of TI=6 and TI=8. It is to be confirmed with ACHD that TI=8 is acceptable for all new improvements to West Pine Avenue. • STORMWATER DISPOSAL - Two percolation tests performed in the northwest corner of the development resulted in a recommended design perc rate of P=2.0 inches/hour. This rate includes a safety factor of a 50% reduction in measured value. Given the difficulty in confirming the design perc at the adjacent Chesterfield and Creekstone developments, a drain time of 12 hours is recommended. As per ACHD requirements, percolation rate is to be confirmed at the point of injection at the time of construction. • COMMERCIAL DEVELOPMENT - Additional evaluation is recommended for the commercial portion of this development. When plans are complete, stormwater injection locations are known, and building foundation loads and vehicle traffic loads can be anticipated, these recommendations should be reviewed and, if necessary, modified. Additional field exploration may be required. N ew G Geoteelywca/Services/soil Testing&Inspection services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CON/SSULTING, LL INTRODUCTION PURPOSE AND SCOPE This report presents the results of a Geotechnical Evaluation performed for a proposed residential subdivision and commercial development to be constructed on seven parcels north and south of West Pine Avenue, west of North Ten Mile Road in Meridian, Idaho. Parcel information is as follows: # Ada County# Address Acres 1 S 1210131700 3720 West Pine Avenue 7.10 2 S 1210141925 North Ten Mile 12.75 3 S 1210417910 3715 West Pine Avenue 4.76 4 S 1210417325 3515 West Pine Avenue 1.47 5 S 1210417600 West Pine Avenue 3.37 6 S 1210417310 West Pine Avenue 4.15 7 S 1210417501 3513 W Pine Avenue 0.82 TOTAL ACRES 34.4 According to the preliminary plat, access to the property will be gained from West Pine Avenue. Improvements to existing right-of-ways are anticipated. The purpose of this investigation was to evaluate the subsurface soil conditions and provide recommendations for building foundations and civil construction. The field investigation included subsurface exploration by means of a rubber-tire-mounted backhoe operated by an independent contractor. During excavation of the test pits, logs were generated, and soil samples were gathered. Soil samples were returned to our in-house soil laboratory for testing. After the field investigation and laboratory testing was completed, all available field and laboratory test data was reviewed, the provided design information was evaluated, and this report was prepared. This report summarizes our findings and recommendations regarding the geotechnical aspects of the project. AUTHORIZATION E-mail authorization to proceed with a geotechnical investigation for the northwest section of this development was received from the client on March 3, 2019. Staking and excavation was delayed until a civil design was developed. The residential section south of Pine was added by email on July 26, 2019. The Preliminary Plat for the entire development was supplied to SITE on February 19, 2020. Authorization to proceed and the use of the recommendations provided herein indicate the client's acceptance of the scope of work, warranty, limitations, and general conditions provided herein and within the submitted proposal. Cn a Geotechnica/services/soil Testing&Inspection services E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ON ULTING, LL RESEARCH & BACKGROUND GENERAL There are four homes and numerous outbuildings on the subject properties. Many of these will remain after development but some will be demolished. Historical aerial photos back to 1992 do not reveal other historical structures other than the known single-family residences and related outbuildings now present. Ada County Assessor records indicate no basements are present, however IDWR logs confirm wells are present on at least one of the properties. The undeveloped portion of the property is farmland or pastureland. FIELD INVESTIGATION Eleven test pits were advanced to depths of approximately 6-10 feet below the existing ground surface within the residential sections of this development. During excavation, samples were recovered from the spoil piles as excavation was performed. These samples were sealed in plastic bags, labeled, and returned to the laboratory for evaluation and analysis. In the laboratory, Sieve Analysis, Moisture Content, Liquid Limit, Plastic Limit, and Plasticity Index testing were performed on selected samples. Tests were performed in general accordance with the ASTM test methods. All test results are included in the Test Pit Logs located in the Appendix. OBSERVED CONDITIONS All test pits were generally similar with approximately 4-6 inches of organic topsoil consisting of silt with sand and / or silty sand. This soil is atop a silty sand, weakly cemented silt and sand, or a sandy lean clay layer. The overburden soils extend to sand and gravel contact which occurred as shallow as five feet and as deep as 12 feet. The exposed sand and gravel layer in our test pits include clay fines and therefore do not percolate water as is typically expected once the pitrun layer is reached. Groundwater was encountered between six and 10 feet deep in all our test pits. The Idaho Department of Water Resources website provided the three well logs included in the Appendix. These logs agree with our investigation and indicate the static groundwater is 6-10 feet deep on and near the subject property. It is noted that in deeper wells artesian pressure may result in higher static water levels that actually exist at shallower depth. a Geoteclinical Services/Soil Testing&Inspection services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 0NSULTI I , LL DESIGN & CONSTRUCTION RECOMMENDATIONS General Earthwork After proper grubbing, the native lean clay, silt, and silty sand or sandy silt, soils can be utilized as structural fill to fill residential lots. Removal of the majority of the organic materials will require grubbing of 4-8 inches of surface soils. This is required in all areas to receive structural fill. Deeper excavation may be required along irrigation ditches and where large trees, bushes, and soft, wet areas are present. The depth of grubbing is to be confirmed during construction to ensure organic materials are properly removed from beneath future pavements and structural fills. Inspection by the project geotechnical engineer should confirm all organic material and demolition debris is removed. Inspection must confirm complete removal of demolished structures including basement floors. It is to be confirmed at the time of subdivision construction that all foundation and slab on grade concrete was removed during any demolition of structures and the resulting excavations were properly backfilled with structural fill. If construction is to occur during wet weather or wet surface soil conditions, low- pressure, (tracked), construction equipment is recommended. Rutting caused by the contractor using rubber-tired equipment on a wet subgrade can be expected and should be repaired at contractor's expense. This information is to be supplied to earthwork contractors prior to construction. Structural fills less than three feet deep are to be compacted to 95% of the maximum dry density by ASTM D698, Standard Proctor. For deeper fills, such as ditch backfill, basement backfill, and fill intended to contain rerouted irrigation canals, ditches, or storm water runoff, fill materials are to be compacted to 100% of the Standard Proctor maximum dry density. If structural fill is to be placed on residential lots or commercial building pads, the fill is to extend laterally outside foundations a distance equal to the depth of structural fill. Compaction testing to confirm proper compaction is recommended. Visual inspection is also required to confirm stability and the lack of soft, deflecting, or rutting areas. Fill can pass compaction tests and still be rejected if it fails visual inspection. a Geotechnica/Services/soil Testing&Inspection services I Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ISU LTI , LLC Excavations Shallow excavations and trenches that do not exceed four feet in depth may be constructed with side slopes approaching vertical. Below this depth it is recommended slopes not exceed a vertical to horizontal ratio of one to one. The ability of soils to maintain a vertical or near vertical slope over any extended period can be quite variable. This information is provided for planning purposes. It is our opinion that maintaining safe working conditions is the responsibility of the contractor. Jobsite conditions such as soil moisture content, weather condition, earth movements and equipment type, and operation can all affect slope stability. All excavations should be sloped or braced as required by applicable local, state, and federal requirements. Pavement Section R-Value samples were gathered, and a single sample selected for testing. The specialty soils lab reported an R-Value of R=12. Pavement sections were calculated based upon an R-Value of R=12 and Traffic indexes of TI=6 and TI=8. The results are shown in the table below. Materials meeting the requirements of ISPWC &ACHD are required for all work within this project. Location TI=6 TI=8 HMA 2.5" 3.0" %" Base 4.0" 4.0" Subbase 12.0" 16.0" ACHD is to be contacted concerning the pavement section for Pine Avenue. They may require additional sampling, an increased or higher Traffic Index value, or matching of the existing pavement section. Storm Water Sand and gravel material were present at depths greater than five feet deep in two of the three test pits excavated in August 2020. Percolation testing was performed in TP1 and TP2 at five feet deep. Based upon these results and a 50% safety factor a percolation rate of P=2 inlhr with less than a 16 hour drain-time is to be recommended for design of facilities that extend less than six feet below the existing ground surface. Confirmation of perc rate at the time of construction by field testing is recommended. a Geotechnical services/Soil Testing&Inspection services SSITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Residential Foundation System The proposed single-family residential structures may be supported on conventional, continuous, and isolated pad foundations founded upon the native soils or upon structural fill extending to these soils. Based upon proper placement and compaction of structural fill, bearing pressures of up to 1,500 psf are allowed for foundations founded on the native soils or upon properly placed and compacted structural fill. Either crawlspaces or slab on grade floors are acceptable but slab on grade floors will eliminate the possibility of water accumulating in crawlspaces. Basements are not feasible given the shallow groundwater. If clay soil, wet soil, or deflecting soil is present at the foundation support elevation a geotechnicai engineer should be retained for site specific recommendations. Foundation drains are required within this development. Roof runoff is not to route through foundation drains. Foundation embedment depth is to be at least 24 inches below outside adjacent grade. Foundations that are outside crawlspaces are to be sealed /waterproofed with brush or spray on foundation mastic. Commercial Foundation System Foundation loads are required to generate recommendations for commercial building foundations. It is anticipated that such structures may be supported on conventional, continuous, and isolated pad foundations founded upon the native soils or upon structural fill extending to these soils. Bearing pressures of up to 1,500 psf are allowed for foundations founded on the native soils or upon properly placed and compacted structural fill. Higher values may be possible after loads are known and evaluated for settlement. Underground Utilities It is not anticipated that large excavators or small backhoes will experience any difficulties excavating the onsite materials encountered on the property. No bedrock formation was encountered on the subject property. Well logs from IDWR indicate the high static water level may be as high as six feet below the existing ground surface. Contractors may use the onsite monitoring wells to assess the groundwater prior to proposing on or beginning constructions. Wells are to be protected during construction and can only be removed with permission from the client and SITE. n m Geotechnical Services/Soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 LTIN , tL Inspection & Testing A qualified engineer or his representative should monitor fill placement to ensure the work is performed in accordance with these recommendations. For mass filling, field nuclear moisture - density testing shall be performed on each lift of compacted fill, one test for each filled residential lot or building pad. Trench backfill and right-of-ways are to be tested to ACHD and 1 or ISPWC requirements. It is noted that structural fill can pass compaction tests and still be unacceptable if pumping, rutting, or deflecting under vehicle or foot traffic. Contractor Inspections This report has been prepared with the intent to provide specific design information to the developer and the civil engineering consultant. It is not intended to act as any contractor's "Due Diligence" or subsurface inspection prior to estimating construction costs or actual construction. Any remaining monitoring wells can be used by contactors to confirm the depth to groundwater. Wells are to be protected and retained. General Comments After the plans and specifications for construction are completed, it is recommended that this consultant be provided the opportunity to review the final design and specifications. This review will confirm the earthwork recommendations have been properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This review is a part of this service and will not result in additional invoicing unless additional research and recommendations are needed. Testing and inspection services are recommended herein. Proper quality control during construction is required to confirm materials and methods and thereby obtain a desirable finished product. Monitoring and testing should also be performed to verify suitability of materials used for structural fills and to confirm proper demolition, subgrade grubbing, subgrade stability, and proper placement and compaction of fills. Any deviations from the herein described subsurface conditions must be brought to the attention of this consultant. This report has been prepared for the exclusive use of the client and their retained design consultants. Findings and recommendations within this report are for specific application to the proposed construction described herein and apply only to the property identified. Client may duplicate this report as needed or additional copies will be provided upon proper client authorization. APPENDIX FOLLOWS co R a Geotechnica/services/soil Testing&Inspection services SITEI E Post Office Box 190537 - Boise, Idaho 83719 ULTJ site.consulting.idaho@gmail.com - 208-440-6276 CON/SULTING.. LLC APPENDIX Preliminary Plat Aerial Photo - Test Pit Locations Test Pit Logs (11) Soil Log Legend /Abbreviations &Acronyms Calculated Pavement Sections (2) Subcontracted R-Value Result Adjacent Groundwater Well Logs (3) Monitoring Well Map Groundwater Data rn a Geotechnica/Services/soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 ULTJ site.consulting.idaho@gmaii.com - 208440-6276 ZC/ONSULTING, LLC PRELIMINARY PLAT �...-- �ut' t+t�t3 f � `max � �� M�•R } � � r,�! -' N - t R.' dT ♦ (�}a s s'e r tw. "� "' st N a a � hY� 3t„�►pp st yy FF -.�.�.�.. v.n�a � _. .. �#i���LµttM "ig`Y i� •� s. Yxi fi � 4 1��� =t I, # iy „%fSi PpYf� c F a g o Image provided by client. a Geotechnical Services/soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 ONS L , LL AERIAL PHOTO Approximate Test Pit Locations a. fl' Image Provided by Google Earth m a GeotechnicalServices/Soil Testing&Inspection Services IT Post Office Box 190537 - Boise, Idaho 83719 UI site.consulting.idaho@gmail.com - 208-440-6276 CO LT LL TEST PIT LOG Test Pit: TP-1 File#: 21844 Client: Trilogy Development Date Excavated: 8/14/20 Project: Foxcroft Excavated By: Wood Brothers Location See Map—Red Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 1 3/4" 1/2" 1 3/8" 1 #4 1 #10 #40 1 #100 #200 1 %M I LL PI 0.0-1.0 Brown,Moist Firm,Sand&Silt with Root Zone/Organic Layer 6-8" 1.0-3.0 Brown,Moist,Firm,Sandy Silt ML 2.0 - I - I - 1 100 99.8 94.9 1 85.8 79.2 27.6 NP NP 3.0-5.0 Brown/Tan,Firm,Silty,Sand SM 4.0 - I - 1 100 1 99.3 1 98.1 93.7 43.2 1 20.1 14.9 18.5 NP NP 5.0-6.0 Brown/Tan,Saturated,Firm,Sand,Gravel,Cobble Bottom of Excavation @&0 6.0 Ground Water Encountered @ 6.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP-2 File#: 21844 Client: Trilogy Development Date Excavated: 8/14/20 Project: Foxcroft Excavated By: Wood Brothers Location See Map—Red Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 1 3/4" 1/2" 3/8" 1 #4 #10 940 #100 #200 %M LL PI Brown,Moist, Firm,Silty Sand(SM) 0.0-4.0 with Root Zone/Organic Layer 6-8" 3.0 - 1 100 1 97.7 1 96.1 1 91.5 81.7 52.6 40.9 36.1 19.9 NP NP 4.0-5.0 Brown/Red,Wet,Firm,Sand&Silt 5.0-8.0 Brown/Tan,Saturated,Firm,Sand,Gravel,Silt Bottom of Excavation @ 8.0 8.0 Ground Water Encountered @ 7.0 Monitoring Well Installed N o� c Geotechnica/Services/Soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 Z ONSULTI , LLC TEST PIT LOG Test Pit: TP-3 File#: 21844 Client: Trilogy Development Date Excavated: 8/14/20 Project: Foxcroft Excavated By: Wood Brothers Location See Map—Red Placemark Logged By: I J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 1 #40 1 #100 1 #200 1 %M I LL PI 0.0-1.0 Brown,Wet, Firm,Sand,Clay,Silt with Root Zone/Organic Layer 6-8" 1.0-7.0 Brown/Tan,Wet,Firm,Sticky,Sand ,Lean Clay CL) 3.0 - 1 100 1 97.7 1 96.1 1 91.5 81.7 1 52.6 1 40.9 1 36.1 1 19.9 I28 9 Bottom of Excavation @ 7.0 7.0 Ground Water Encountered @ 6.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP-1 File#: 21844 Client: Trilogy Development Date Excavated: 5/3/19 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: I J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 #10 #40 1 #100 1 #200 %M LL PI 0.0-1.0 Brown,Moist,Finn,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 1.0-3.0 Brown,Moist,Finn,Sandy,Silt(ML) 3.0 1 100 1 88 1 86 1 84 82 72 1 60 1 52.5 13.4 1 NP NP 3.0-8.0 Brown/Tan,Moist,Firm,Sand,Gravel,Cobble 6.0 1 100 1 80 1 76 1 64 1 50 19 9 1 7.1 4.1 1 NP NP Bottom of Excavation @ 8.0 8.0 Ground Water Encountered @ 8.0 Monitoring Well Installed M a Geotechnical Services/Soil Testing&inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LL TEST PIT LOG Test Pit: TP-2 File#: 21844 Client: Trilogy Development Date Excavated: 5/3/19 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: I J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 #40 1 #100 1 #200 %M LL PI 0.0-1.0 Brown,Moist,Firm,Sand,Clay,Silt With Root Zone I Organic Layer 6-8" 1.0-3.0 Brown,Moist,Firm,Sand,Clay,Silt 3.0-8.0 Brown/Tan,Saturated,Soft,Sand,Gravel,Cobble Bottom of Excavation @ 8.0 8.0 Ground Water Encountered @ 8.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP-3 File#: 21844 Client: Trilogy Development Date Excavated: 5/3/19 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 1 3/4" 1 1/2" 3/8" 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-1.0 Brown,Moist,Firm,Sand&Silt With Root Zone/Organic Layer 6-8" 1.0-4.0 Brown,Moist,Finn,Sand,Clay,Silt 3.0 100 99 98 91 74.5 24.4 NP NP 4.0-7.0 Brown/Tan,Moist,Firm,Sand,Silt 5.0 100 1 96 1 91 1 88 84 73 26 16 13.1 9.8 NP NP Bottom of Excavation @ 7.0 7.0 Ground Water Encountered @ 7.0 Monitoring Well Installed d" a Geotechnica/Services/Soil Testing&Inspection Services Z ITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 SULT NG, LL TEST PIT LOG Test Pit: TP-4 File#: 21844 Client: Trilogy Development Date Excavated: 5/3119 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 #10 #40 1 #100 #200 %M LL I PI 0.0-1.0 Brown,Moist,Firm,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 1.0-6.0 Brown,Wet,Firm,Sticky,Sand,Clay,Silt 3.0 100 98 1 84 59.7 22.2 1 NP NP 6.0-8.0 Brown/Tan,Wet,Soft,Sand,Gravel,Clay Bottom of Excavation @ 8.0 8.0 Ground Water Encountered @ 7.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP-5 File#: 21844 Client: Trilogy Development Date Excavated: 5/3119 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 3/4" 1 1/2" 1 3/8" #4 #10 #40 1 #100 #200 %M LL PI 0.0-1.0 Brown,Moist,Firm,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 1.0-6.0 Brown,Wet,Firm,Sticky,Sand,Clay,Silt 4.0 1 1 1 100 1 98 96 92 89 85.7 24 NP NP 6.0-8.0 Brown/Tan,Wet,Soft,Sand,Gravel,Clay Bottom of Excavation @ 8.0 8.0 Ground Water Encountered @ 7.0 Monitoring Well Installed Ln �n a. Geotechnica/Services/Soil Testing&Inspection Services /0� I Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ONS LT N a, LL TEST PIT LOG Test Pit: TP-6 File M 21844 Client: Trilogy Development Date Excavated: 5/3/19 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: I J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 13/4" 1 1/2" 1 318" 1 #4 t #10 1 #40 1 #100 1 #200 %M I LL PI 0.0-3.0 Brown,Wet,Firm,Sticky,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 3.0-7.0 Brown/Tan,Wet,Soft,Sand,Gravel,Cobble Bottom of Excavation @ 7.0 7.0 Ground Water Encountered @ 6.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP-7 File#: 21844 Client: Trilogy Development Date Excavated: 5/3/19 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 1 3/4" 1 1/2" 1 3/81, 1 #4 1 #10 #40 #100 #200 1 %M LL PI 0.0-3.0 Brown,Wet,Sticky,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 3.0-7.0 Brown/Tan,Wet,Saturated,Sand,Gravel,Clay Bottom of Excavation @ 7.0 7.0 Ground Water Encountered @ 7.0 Monitoring Well Installed " a Geoteclwical Services/Soil Testing&Inspection Services TPost Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 CONSULTING, LL TEST PIT LOG Test Pit: TP-8 File#: 21844 Client: Trilogy Development Date Excavated: 513119 Project: Foxcroft Excavated By: JM Location See Map—Yellow Placemark Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION feet 1.0" 3/4" 1/2" 1 3/8" 1 #4 #10 #40 #100 #200 %M LL PI 0.0-6.0 Brown,Moist,Firm,Sand,Clay,Silt With Root Zone/Organic Layer 6-8" 3.0 1 1 100 1 99 96 78 63 53.3 24.2 25 5 6.0-8.0 Brown/Tan,Moist,Firm,Sand,Silt,Clay 7.0 1 1 1 1 100 97 88 54 42.1 18.1 20 2 8.0-10.0 Brown/Red,Moist,Firm,Sand,Gravel,Clay 9.0 100 1 99 1 92 82 57 44 36.5 22.7 25 5 Bottom of Excavation @ 10.0 10.0 Ground Water Encountered @ 10.0 Monitoring Well Installed t\ r-f ro a Geotechnica/Services/Soil Testing&Inspection Services ZULTItE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 , LIL SOIL LOG LEGEND UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM STANDARD TEST METHOD D 2487 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES) MAJOR DIVISIONS TYPICAL DESCRIPTIONS GW Well-graded gravel,gravel-sand mixture,little or no fines. F GRAVEL& Gp Poorly graded gravel,gravel sand mixture,little or no fines GRAVELLY SOILSOILS 5-12% #200 GM Silty gravel,gravel-sand-silt mixtures #4 COARSE >72°!°-#200 GC Clayey gravel,gravel-sand-clay mixtures GRAINED SOILS <50%-#200 SW-1Well-graded sand,gravelly sand,little or no fines. SAND& <5%-#200 SANDY SP Poorly graded sand,gravelly sand,little or no fines SOILS >50%-#4 SM Silty sand,sand-silt mixtures SC Clayey sand,sand-clay mixtures Fm L] Inorganic silt and very fine sand,rock flour,silty or clayey fine SILTS& INORGANIC sand or clayey silt with slight plasticity CLAYS CL Lean clay-low low to medium plasticity, ravel) sand or silty clay FINE LL<50% y' P tY�gravelly, Y� tY Y GRAINED ORGANIC OL Organic silt and organic silty clay of low plasticity SOILS >50%-#200 PH Elastic silt,micaceous or diatomaceous fine sand or silty soil. SILTS& INORGANIC CLAYS CH Fat clay-high plasticity LL>50% ORGANIC OH Organic clay-med.or high plasticity:organic silt HIGHLY ORGANIC SOILS PT Peat,humus,swamp soil with high organic content ABBREVIATIONS & ACRONYMS AASHTO American Association of State Highway & Transportation Officials ACHD Ada County Highway District ASTM American Society for Testing and Materials IBC International Buildins Code ISPWC Idaho Standard for Public Works Construction ITD Idaho Transportation Department NP Non-Plastic PCC Portland Cement Concrete PCF Pounds per Cubic Foot TP Test Pit USCS Unified Soil Classification System 00 %M Percent Moisture R Geotechnica/Services/Soil Testing&Inspection Services IULTJ Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 DESIGN SECTION CALCULATIONS (ACHD R-Value Method) Project: Foxcroft Subdivision File No.: 21844 West Pine Avenue -Meridian Calc By: T Shaffer Client: Trilogy Development Date: 02/20/21 Design Thickness Equation: T=0.0032 (TI)(100-R)(12)=GE (inches) T= Design Thickness TI = Traffic Index= 6 By Agency GE = Gravel Equivalent R = R-Value = 12 Soil Test GE= 20.8Inches ACHD HMA, 3/4" Base and Aggregate Subbase Actual Thickness Equivalent Thickness HMA Thickness= 2.5 Inches HMA=V 5.0 Inches 3/4" Base Thickness = 4.0 Inches RBE=s 4.4 Inches Calculated Aggregate Subbase Thickness Equation: Subbase Thickness=SB=GE-HMA-RBE SB= 11 .4Inches CALCULATED DESIGN SECTION HMA= 2.5 inches 3/4" Base= 4.0 inches Subbase= 12.0 inches RECOMMENDED DESIGN SECTION HMA = 2.5 inches 3/4" BASE = 4.0 inches SUBBASE = 12.0 inches ON a Geotechnical Services/Soil Testing&Inspection Services Z T Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ULTING, LL DESIGN SECTION CALCULATIONS (ACHD R-Value Method) Project: Foxcroft Subdivision File No.: 21844 West Pine Avenue -Meridian Caic By: T Shaffer Client: Trilogy Development Date: 02/20/21 Design Thickness Equation: T =0.0032 (TI)(100-R)(12)=GE (inches) T= Design Thickness TI = Traffic Index= 8 By Agency GE = Gravel Equivalent R = R-Value = 12 Soil Test GE= 27.5Inches ACHD HMA, 3/4" Base and Aggre-gate Subbase Actual Thickness Equivalent Thickness HMA Thickness = 3.0 Inches HMA=r 7.5 Inches 3/4" Base Thickness= 4.0 Inches RBE=r 4.4 Inches Calculated Appreciate Subbase Thickness Equation: Subbase Thickness=SB=GE-HMA-RBE SB= 15.6Inches CALCULATED DESIGN SECTION HMA= 3.0 inches 3/4" Base= 4.0 inches Subbase= 16.0 inches RECOMMENDED DESIGN SECTION HMA = 3.0 inches 3/4" BASE = 4.0 inches SUBBASE = 16.0 inches 0 N ao Geotechnica/Services/soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 P% ULTJ site.consulting.idaho@gmaii.com 208-440-6276 CONSULTING, LLC SUBCONTRACTED RNALUE eavirmtoong Inc IGQoddrV;Sam Lv�s Ob�Wo 0*WVr5 .'AAAqL,CC-QA RESISTANCE JIRLVALUE TEST ASTM 0 2844 Laboratory No,: L191739 Project No+ : IkO327 Sample Date, NA Report Date- �St 12,2019 cfient: Site Con LLC Project Name: 20191_abgr�to Te-stniq Sample Description- ftwn Silly clay Sample Location: 1ia:!5�E M TF-8 100 90 80 W 70 60 150 40 2 30 20 cc 10 800 700 600 500 400 300 200 100 0 Exudation Pressure (P.S.I.) L —Resistance Value Test —300 P S'I_ en W --4--- Moisture Content 1%1 I&P ITS ft0enft(PCF� 100.0 10_70 Rear Value JR) 17 11 E,.-wJabw Presswe 4FSJ�; 519 288 13D E234sion Pass e l5f, 104 IM Peoeiy*d Moisture RESISTANCE VALUE AT 300 P.SJ. 12 Rewewed Dr. Wan don Rodebauo Matenats Engineer ac Geotechnical Services Soil Testing&Inspection Services ZI LTI Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 LTING.. LLC ADJACENT GROUNDWATER WELLS (3401 Pine Avenue) mvrz �. DEf",�RTMeNT OF R BESOURCeS T03N RQ1W See.14 UESE WELL RIL LER'$ RIB awe low Ow Aww t By; bo 12-0247 ,t. WVLL OW 7 WOTVO t-ewL t�fint>7t .„.,_._ �...-., .. _ 4 c at 'saw# rhuw r a.ea .now _._. n —m- ,a „a €r , a. wow R W041 Twr DMA t. Wm*eliamorttfct s tar# r� { ats r tcuanx ottt cu r * ...w le 9 a. PROP034M GAS r+........ 1k. id'f`Ei �Lt'►Skt �r C3 k C` VAS11ftwXw Other to" a. IMTHOD CMI"EQ ry c^ RtP €_t mksegjW tWWy 44 as r+Y .a ..w*rtwa t ISM71 u or seats_ cs Ratertreetsk d'2 L. yea w'N. a ' k*w. oaratad?. s--# t' ary �:zl 4tiaft '$$am o aun '_ tix +rs tt fd -v MRAutatct3r..r r ' Poomr eta at'raid CRta..:-tolr— It-^ forte�.�f4wk ma fat Paek�af? in mf--� rz a.-f Wa" from - facet to _ fBtartau» s to eaw n cw-wA gtm q atit�t Attu#: u: terry sa*t + - 4.-. A7tdt}tM pFstt CMtEttFk�; � - eSy - s. --_- 49,. - : fit OP WaLL MAP tt sttn Must agmta WVlh tt W#t ea*itfy Mat all fnw-d t t wo.ctn+tfrtAc,,wn fir" wwR ,"' x .'^_n 5400N~N t - +41%#A Ow ifow*ta tip we&r Film h#te �.,w --� t 4 Na. eek NO _ _ , ._ f$ tf s # ter Swe.�.#.t.:f* A I.— e a� w me - #�, . �.,X11 Z — N AM710MA t SLEETS W URCE BARV— ri-m itrp°fa!"cormf Im-T - N m nn a. Geotechnica/Services/Soil Testing&Inspection Services Z E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho acgmail.com - 208-440-6276 LTING, LL ADJACENT GROUNDWATER WELLS (3515 Pine Avenue) ` —77 IT)A14ODVPARrMFN17 OF WATIA `1':.SOU1 CES fraap�ac�f ft�. .-- LL DRILLER'DRILLER'S REPORT `WP�...�p .R -VR 14 L DRILL P T 7 - -D € � It.WELL US"; t¢ re °`€`" ()t}t r M R Nm .,.., ..... �•� pu lUitcr air Fkmi rek at« _ - _ ., �.C1�3��?Ec i� N#AWC tit ighwt Kg-r - A Mfg .Pin taut :fig. 1ley ice cP _3642Water Temp.It} tfodom tote . 1.1 ATIO WELL Iep*d p �: wat 1 tty test or t mew" T �L- Nont, 0, CW Sty 4 ttr -,E =ask Ve�cS ftm, htrn -To 121 c 1 l ,t'.w1mir see, 10 1.4 NW f 4 �SF 114 zbg Tu— azm. tltia 't 1R7F.. :sttt7lrY 4 10" $` fir weulg£UV 10" }21 'if Brew*smd&Gray Mt7 M of Wfm Site 3515 W.Pint fit, Hrv*ri t12y'4tWrCr A C rt 1k1ttltaat 6" bE' 6#" 131€tw t5, f3fk- S*'Name 6. .t ri sxt Ciao � 6" t1€Y i3(1" Nrawwn Clay 4.USE: 6" 130 M 1k ati 0municifW 0 Monitrw ® trritmt�m 159 187 vFA M r�ikir Tfxrr cw ras Chf tr" 197' t43` tease tiansf �,s e S.�'E CIS`WORK ask au Gott y s� � t��%an 19 tv+dell1��n&4 ij Ahrtrwwf+xaw�xwt R k+er . _ 6.DRILL METHOO Aar -,I3 Cable,0:dud gaffvI��Jt1�er. `. AL � R SLAUVIT-171, PACK 'AM 31 eM Lim WAko a 1 s Q 0 0 11 PERFORATIONWWRYEM Cimplo €Ttptft' 149 --imemeablel 0 PA-IckwaiigAIA f¥tC#"j Outc a!2� t r.I t�o-9 .s=era - V C w0ity aw au nawmam WCK wmtrshAim au KJwr&'RTm trern Ta Ska 4rz It DW01.6.Itit t Cieu arw ed with at thr time the rig was me Ron Numc Ifs 1 � rim NO.t 12 Vito offigial 10-STATIC WATER LFV'EL OR ARTF-SIAN pEfF; g ue en m Geoteclmica/Services/Soil Testing&/nspection Services ITE Post Office Box 190537 - Boise, Idaho 83719 i ! ( i site.consulting.idaho@gmail.com - 208-440-6276 ONSULTI G.. LL ADJACENT GROUNDWATER WELLS (775 Ten Mile Road) r STATE OF IDAHO i_o"fkan Cotratied by JDWR To: x PAR1`tt9ENT OF WATER RESOuRCES T03N t'tbIW Sim'IQ WE WELL DRILLER'S DRILLER' REPOT Woo fiw ttsoa e f aw-w,ow wtttxt r r u*0-w . Est at t. WELL.-- - x-- AdtHwan,,'-,*u qd�aura ps-h co""w W a Vow if c4p r, af,,a x. r WSLL TZST VAIW t#*w wag f un* xat <1 n e>xtsxarte�l: tb� to+iak;ar ma�f_. s,tts� - a..axr" a r�- - -� 3k PAOPQSFM AM* frtarAar we no wr r. . _. tE'dfYbAK sF $ "T 1y # 819r+k - tis'tr:F+trt S#R . _ e V cub* MOO, olrw S.We"CONSTRUMIC" f m" o cow fit 4-teas + .Z I"_&ef_._ !ram teat 4 s.r att�ccriv ctaaa a C+*ft + _- f uno Famey i.)x0ft is Twrra 0 ow,ino"by r «P A 4 41 .° z , hw-tow ismt"rom k0m , fiet to, tabs PSC'i194'� u Ys6 £fK t t tr saza c t ff:P e Pukcad from.. -,,.-„_.�.s....�..,..w fast to,,g.w.�,- ..�..:.:.....,. - ft - x3angf r_ 'T>�Patfic acfAda� lV 9ifl#tlBpYth, - �_ 9 7c7fCb4iXt at f�i t�� Qascrf "C"*cvk skVic h Mom W-W Vu t wNtA waswca w t Cwwy out af#""'OlRti m tt essqatrucwro q%w w .% S'&4 Admn Now* wffh aet 04-rg veua r�ms+.mrct. _..._,.,...,. Lao up Na, _ AlW. _D.alp.e.;t"tFci7..7,zS —...a,c„_ Addm"of he4s#.S tr _. trsve eaaema or€rase€} #00 .. T- V.mac,...stF:t 4 or S{V?" fff -If Ah4n Thy DrAng sbpwwmwc ,.. qzs warrrrotaRa IF "fff FOMWO TM WKnE CQPY To THE WFARTMEW d" N ^J b0 R a Geotechnica/Services/Soi1 Testing&Inspection Services SSITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 NSULT , LL Monitoring Well Locations I . 08/14/2020 Ln N 05/02/2019 a Geotechnical Services/Soil Testing&Inspection services T Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 LTJ , LL GROUNDWATER DATA MW# 1 2 1 3 4 1 5 1 6 7 8 1 1 2 3 Comment Date Installed 513/2019 8/14/2020 Ground Elevation 2655.5 255&0 2555.5 2557.0 2559.0 1 2558.0 2557.5 2556.5 2957.0 2961.0 2559.0 Casing Height 1.5 2.0 1.5 2.0 1.3 2.4 1.5 2.5 1.8 1.3 2.5 Casing Elevation 2557.0 2557.0 2557.0 2559.0 2560.3 2560.4 2559.0 2559.0 2958.8 2962.3 2561.5 5/17/2019 8.0 8.0 7.0 7.0 7.0 6.0 7.0 10.0 GW Elevation 2549.0 2549.0 2550.0 2552.0 2553.3 2554.4 2552.0 2549.0 5/31/2019 8.0 5.5 7.0 7.0 7.0 6.0 7.0 10.0 GW Elevation EM 2553.3 2554.4 2552.0 2549.0 6/14/2019 8.0 6.0 7.5 7.4 5.5 5.0 6.0 8.0 GW Elevation 2551.0 2549.5 2551.6 2555.4 2553.0 2551.0 6/28/2019 8.0 7.0 8.0 7.8 3.0 4.0 6.0 6.0 Recently Flooded GW Elevation 2549.0 2550.0 2549.0 2551.2 2557.3 7/8/2019 Gone 7.2 Gone Gone 2.5 3.6 4.5 5.3 Recently Flooded GW Elevation 2549.8 2557.8 2556.8 2554.5 2553.7 8/16/2019 Gone 7.5 Gone Gone 1.5 3.0 4.8 6.6 Field Flooded GW Elevation 2549.5 2559-1 2557-1 2564-1 2552-1 Ignor Data 9/22/2019 Gone 7.8 Gone Gone 6.0 5.5 6.3 7.0 GW Elevation 2549.2 2554.3 2554.9 2552.8 2552.0 8/20/2020 5.6 5.6 6.0 GW Elevation 9/15/2020 low 6.1 7.0 7.0 GW Elevation 2952.7 2955.3 2554.5 10/18/2020 6.5 8.0 7.8 GW Sevationi 2952.3 2964.3 2553.7 1101 NOTHING FOLLOWS N v on m o. Geotechnica/Services/Soil Testing&Inspection Services