Loading...
CC - Storm Drainage Calcs ' ESE Consultants, Inc. ESE CONSULTANTS -'3103 w. Sheryl Drive ENGINEERING - PLANNING • SURVEYING ENVIRONMENTAL Meridian, Idaho 83642 TEL: 208-424-0020 STORMWATER MANAGEMENT REPORT FOR OAKS NORTH SUBDIVISION, PHASE 9 12449 or- E. 80 I lagllzi Justin E. Bozovich Professional Engineer Idaho License No. 12449 January 2021 LOCATED IN: CITY OF MERIDIAN ADA COUNTY, IDAHO TABLE OF CONTENTS SUBJECT SECTION Project Overview 1 Stormwater Management Design 2 Stormwater Equations 3 Primary Conveyance & Stormwater Facility Calculations 4 Intensity-Duration-Frequency Curve 5 Pipe Flow Calculations 6 Drainage Basin Map 7 SECTION 1 - Project Overview The Oaks North Subdivision No. 9 is a part of a multi-phase residential development located in the City of Meridian, Ada County, Idaho. The development is situated along the north side of West McMillan Road, between North Black Cat Road and North McDermott Road. The applicant proposes to develop twenty (20) single family residential lots with this phase of the project on approximately 7.4 acres. The development includes the construction of homes and infrastructure to include roads, sidewalks, stormwater management facilities, utilities, and other improvements typical of residential construction. Additional improvements will be constructed as part of the subdivision in subsequent phases. Existing Conditions The project site is currently bounded by single family residential developments to the south (Oaks South Subdivision) and east (Jump Creek Subdivision). Existing farmland primarily bounds the project to the north and west.The project site itself is comprised of existing irrigated farmland with dirt access roads, field drains, and irrigation delivery ditches. There previously existed several out buildings near McMillan Road that have been razed and removed from the site by the developer. The existing terrain is relatively flat with slopes generally less than one percent. The site slopes down gradient from east to west. Geotechnical Characteristics A Geotechnical Engineering Report was prepared by Materials Testing and Inspection (MTI) for the Oaks North Subdivision, dated July 20, 2018. The soils were generally described as having a hard pan layer at approximately 3-7 feet below the ground surface overlain by clay material. Gravel and sands were generally observed below the hard pan layer. Groundwater Groundwater monitoring of the project site was commenced by MTI in June 2018. A summary of the groundwater elevations observed on site to date have been recorded by MTI in the Groundwater Letter dated, November 20, 2019. The groundwater has been observed at depths between 3-ft and 10-ft below the ground surface. Soil Infiltration MTI performed soil infiltration tests at four locations within the project site and presented their results in Addendum#2 to the Geotechnical Engineering Report,dated February 8,2019. Results of the soil infiltration rates ranged from a low of 0.24 in/hr to a high of more than 8 in/hr. An infiltration rate of 1 in/hr was utilized for design purposes. SECTION 2 - Stormwater Management Design Design Criteria The Stormwater Management Plan described herein has been designed according to the Ada County Highway District Policy Manual. The proposed Stormwater Management Design has been prepared to meet the following requirements and guidelines: ♦ The Rational Method (Q=CiA) has been utilized to calculate peak flows. Runoff coefficients were used per the ACHD Policy Manual. Rainfall intensities were determined using the ACHD adopted Intensity-Duration-Frequency Curve located in Section 5 of this report. Calculations for the requisite time of concentration (Tc) value are enclosed. The overland flow and gutter flow segments of the Tc were calculated based on the equations provided in the ACHD Policy Manual and enclosed within this report for reference. ♦ Pipe flow calculations are provided to demonstrate that the primary stormwater conveyance system is sized to adequately handle stormwater flows based on the 25-year storm event. ♦ High groundwater observed through the site necessitated the use of Vertical Sand Filters for the storage and infiltration of the 100-year storm event. An infiltration rate of 1 inch per hour has been used for the design of the vertical sand filters. There are six vertical sand filters, located within five drainage areas, proposed in Phase 6; each are located on common lots. ♦ The residential lot grading was designed to drain approximately the front half of the lot towards the street and is included in the stormwater basin calculations. Stormwater that falls within the back of the lots will be retained on site. Yard drains will be installed in the rear yards during home construction and final landscaping to facilitate infiltration of lot drainage. ♦ High groundwater observed through the site necessitated the use of a Vertical Sand Filter for the storage and infiltration of the 100-year storm event. An infiltration rate of 1 inch per hour has been used for the design of the vertical sand filter. The proposed vertical sand filter known as Basin A is located within Block 28 Common Lot 12. A sand and grease trap is provided for pretreatment. SECTION 3 - Stormwater Equations Stormwater Conveyance ACHD Policy Manual 8011.2) Q - CIA where: Q - Discharge rate (cfs) - Coefficient of Runoff(dimensionless) i - Rainfall intensity (in1hr) for a duration equal to the time of concentration (Tc) over the contribuking area and for the design frequency. A - Site area (acres) Tc - Time of ooncentration Coefficient of Runoff(ACHD Policy Manual 8011.2.1) Estimated Ftunoff Coefficients for Various Surfaces Type ofSUrfaie Runoff Coefficients "C" Business Downtown areas 0.70.0.95 Urbannelghborhoods 0.50.0.70 Residential Single Family 0.35.0.50 Multifamily 0.60.0.75 Residential;rural) 0.25.0.40 Apartment Dwelling Areas. 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks,Cemeteries 0.10.0.25 Playgrounds 0.20-0.35 Railroad yaFd areas 0.20.0.40 UnlmpFaved areas 0.10.0.30 StFBBtS Asphalt 0.95 Gan{Fete 0.95 Brick 0.95 Rook 0.95 gravel 0.75 Fields:Sandy sail Soll Type Slope A B C Flat 0.2% 0.04 0.07 0.11 0.1S Average,2.6% 0.09 0.12 0.15 0.20 Steep' % 0.13 0.18 0.23 0.26 Ada pted from ASCE Design Storm Runoff Volume (ACHD Policy Manual 8011.3.2) V=CiA(3600) V: Design storm runoff volume required for storage C: Coefficient of Runoff is Rainfall Intensity per IDF Curve 1-hour 100-year storm event, i=0.96 1-hour 2-year storm event, i=0.26 A: Total catchment area(acres) Time of Concentration TC=TC-G+TC-s Tc : Total time of concentration LG Tc-c — 60 • VG Tc-G : Gutter time of concentration LG : Length of gutter flow VG : Gutter flow velocity VG=K„kSP0.5 K„ : Empirical coefficient(3.281) k : Intercept coefficient(0.619) SP : Slope (percent) 0.007(nL)0.8 Tc—S = (p2)0.5So.4 Tc-s : Overland time of concentration L : Length of overland(sheet) flow n : Manning's Roughness Coefficient(0.24) P2 : 2-year 24-hour rainfall(1.2 in.) S : Slope(ft/ft) Manning's Roughness Coefficient(ACHD Policy Manual 8011.5.3) Typical Range of Manning's Coefficient (n} for Channels and Pipes COnd4iil rrl t6ri01 f4l nrlirrg'S ' Closed Conduits concrete pipe 0-010-0.015 CRAP 0-011 -0.037 Plastic (smooth) 0-009-0.015 Plastic carru etedl 0.018-0.025 PavalvanUgunor seceions 0.012-0-016 Small Open Channels Concrete 0-011 -0.015 Rubble or riprap 0-020 - 0.035 Vegetation 0.020 - 0.150 Bate Soil 0.016- O.Q25 Rock Cut 0.025- 0.045 Natural onannals{minor streams. lop wpdth at flood stage <30 m(100 ft)I Fairiy regular section O.Q25- 0.050 Irr"ular were d'1 with pools 1 0.040- 0.150 -Lower values are usually For well-constructed and maintained(smoother)pEpes and charnels Table 3-2. Manning's Roughness Coefficient(n)for OVerland Sheet Flow.: Surface Description n Smooth asphalt O,011 Smooth concrete 0.012 Ordinary concrete lining 0.013 Good wood O.D14 Brick with cement mortar 0.014 Vitrified Clay O.D15 Cast iron O.D75 Corrugated metal pipe 0.024 Cement rubble surface 0.024 Fallow (no residue) 0-05 Cultivated soils Residue cover s 20% 0.06 Residua cover� 20% 0.17 Range(natural) O.13 Grass Short grass prairie 0.15 Dense grasses 0.24 Bermuda grass 0.41 woods' Light underbrush 0.40 Dense underbrush 0.80 When selecting n, consider cover to a heig ht of about 30 mm. This is only part of the plant cover that will obstruct sheet flow. SECTION 4 Primary Conveyance & Stormwater Facility Calculations BASIN CATCHMENT AREA A TIME OF CONCENTRATION Overland Flow Gutter Flow Sub-Catchment eng ope,s TC-5 Elev I Elev 2 Length,LG Slope,Sp Gutter Tc_G Total TC (ft) M (min.) (ft) (ft) (ft) M (ft/sec) (min.) (min.) Al 72.0 1.u" 23.6 2533.5 2531.4 520 0.40 1.29 6.7 30.4 A2 72.0 1.00 23.6 2533.7 2531.4 560 0.41 1.30 7.2 30.8 A3 72.0 1.00 23.6 2534.7 2533.4 335 0.39 1.27 4.4 28.1 A4 72.0 1.00 1 23.6 2534.4 2533.4 270 0.35 1 1.20 3.7 1 27.4 CONVEYANCE Sub-Catchment C Area,A i2 i25 iioo Q2 Q25 Qioo 4 (acres) (in/hr) (in/hr) (in/hr) (cfs) (Cfs) (cfs) Al 0.50 1.20 0.4 1.07 1.49 0.24 0.64 0.89 A2 0.50 1.89 0.4 1.05 1.47 0.38 0.99 1.39 A3 0.50 0.74 0.42 1.1 1.54 0.16 0.41 0.57 A4 0.50 1 0.42 1.11 1.55 0.24 0.63 0.88 Total 4.96 1.01 2.67 3.73 SAND&GREASE TRAP No.of S&G Baffle Throat Velocity, Velocity Vault Size Traps Spacing Throat Width Throat Area Flow Rate, Q25 V Flow Rate Check Check (galon) (inch) (inch) (ft) (cfs) (fps) Q25<3.33 cfs V<0.5 fps 1000 20 48 6.67 2.67 0.40 TRUE TRUE STORAGE VOLUMES Chamber 1 Req'd Volume, Rock Void Volume, Storage Volume, V2-YR Ll Wl d1 Pipe Volume,Vpl VRl V1 (ft) (ft) (ft) (ft) (ft) (ft) 2,321 170 6.5 5 298 2,091 2,389 Chamber 2 eq Volume, ioo- Rock Void Volume, Infiltration Rate, Bed Infiltration StorageTime to Ya M2W2 d2 Pipe Volume,VP2 VR2 I Volume,V2i Volume,V2 Drain 90% (ft3) (ft) (ft) (ft') (in/hr) (ft') (ft') (hrs) 8,571 170 24 5 133 8,107 1.0 340 8,580 22.69 SECTION 5 Intensity-Duration-Frequency Curve ACHD Intensity-Duration-Frequency Intensity(inches per hour) Design Storm 2 5 10 25 50 100 Tc(hr) Tc(min) 0.17 10 0.69 1.15 1.48 1.85 2.20 2.58 0.25 15 0.59 0.97 1.22 1.56 1.86 2.18 0.33 20 0.49 0.81 1.01 1.30 1.54 1.81 0.42 25 0.43 0.71 0.89 1.14 1.35 1.58 0.50 30 0.41 0.67 0.85 1.08 1.29 1.51 0.58 35 0.34 0.56 0.70 0.90 1.07 1.25 0.67 40 0.31 0.51 0.64 0.82 0.98 1.15 0.75 45 0.29 0.48 0.60 0.77 0.91 1.07 0.83 50 0.27 0.45 0.56 0.72 0.85 1.00 0.92 55 0.26 0.43 0.54 0.69 0.82 0.96 1 60 0.26 0.43 0.54 0.69 0.82 0.96 2 120 0.16 0.25 0.31 0.39 0.46 0.54 3 180 0.13 0.19 0.23 0.29 0.34 0.40 6 360 0.09 0.12 0.14 0.18 0.21 0.25 12 720 0.06 0.08 0.10 0.12 0.14 0.16 24 1440 1 0.04 0.06 1 0.06 0.08 1 0.09 0.10 Intensity Duration Frequency ------ 2 3 -)K-5 -x-10 2.5 25 t 50 2 ---0-100 L H u 1.5 c c c �X�X X----X_X\X_X- --~-- \X-_)K X- �X-X 0.5 ------ ---------X-X-X- \ _ 0 - - ---- 10 15 20 25 30 35 40 45 50 55 60 120 180 360 720 1440 Duration(minutes) SECTION 6 Pipe Flow Calculations Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 CBA4toMHA6 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.30 Q (cfs) = 0.630 Area (sqft) = 0.20 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.17 Slope (%) = 0.50 Wetted Perim (ft) = 1.16 N-Value = 0.010 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.92 Calculations EGL (ft) = 0.46 Compute by: Known Q Known Q (cfs) = 0.63 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0.50 v 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 CB A3 to M H A6 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.24 Q (cfs) = 0.410 Area (sqft) = 0.15 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.82 Slope (%) = 0.50 Wetted Perim (ft) = 1.02 N-Value = 0.010 Crit Depth, Yc (ft) = 0.27 Top Width (ft) = 0.85 Calculations EGL (ft) = 0.36 Compute by: Known Q Known Q (cfs) = 0.41 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 M H A6 to M H A3 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.39 Q (cfs) = 1.040 Area (sqft) = 0.28 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.66 Slope (%) = 0.50 Wetted Perim (ft) = 1.35 N-Value = 0.010 Crit Depth, Yc (ft) = 0.43 Top Width (ft) = 0.98 Calculations EGL (ft) = 0.60 Compute by: Known Q Known Q (cfs) = 1.04 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 CBA2toMHA3 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.38 Q (cfs) = 0.990 Area (sqft) = 0.27 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.61 Slope (%) = 0.50 Wetted Perim (ft) = 1.33 N-Value = 0.010 Crit Depth, Yc (ft) = 0.42 Top Width (ft) = 0.97 Calculations EGL (ft) = 0.58 Compute by: Known Q Known Q (cfs) = 0.99 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0.50 NZ 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 CB Al to MH A3 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.30 Q (cfs) = 0.640 Area (sqft) = 0.20 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.22 Slope (%) = 0.50 Wetted Perim (ft) = 1.16 N-Value = 0.010 Crit Depth, Yc (ft) = 0.34 Top Width (ft) = 0.92 Calculations EGL (ft) = 0.46 Compute by: Known Q Known Q (cfs) = 0.64 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0.50 v 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc. Thursday,Jan 14 2021 MHA3toSGAl Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.69 Q (cfs) = 2.670 Area (sqft) = 0.58 Invert Elev (ft) = 100.00 Velocity (ft/s) = 4.60 Slope (%) = 0.50 Wetted Perim (ft) = 1.96 N-Value = 0.010 Crit Depth, Yc (ft) = 0.70 Top Width (ft) = 0.92 Calculations EGL (ft) = 1.02 Compute by: Known Q Known Q (cfs) = 2.67 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 v 100.50 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 Reach (ft) SECTION 7 Drainage Basin Map v IVI F Z W f 0 N Q ' 00 z c m t9 -o cFN W> ya o a CBA2 H a _,nCb W z Wg a t CB Al • M 1.20ac \ ' I z o I� v�/ CB A3 ZCB A4 �/ FUTURE PHASE �� z 0.74ac � 1.13ac W c � f ff o 0 Q z 0 OAKS NORTH SUBDIVISION NO. 6 o U ~ O< w OZa :5 Z Z z U NOw Q YN� c' aO s m w 0 ' Q Wm� z �M Q � N � o U L1 (n FEET DATE: SCALE: / 120 0 60 120 240 1/29/2021 AS NOTED I N: WN: 'Ell MOF JOB NO.: FILE NAME: GRAPHIC SCALE 1 inch = 120 ft. S 4468 468 S-SM HEEP NO.: OF