Loading...
PZ - Pre-app Notes C�/WERIDIAN LAND DEVELOPMENT MEETING NOTES Land Development Staff: Amanda McNutt Date: 1/19/2021 Project Name and Location: Pine 43 Apartments Phase 2 Is sanitary sewer available? Yes: ❑X No: ❑ Notes: Project is part of a larger development that is bringing sewer through the project. Is domestic water available? Yes: ❑X No: ❑ Notes: Project is part of a larger development that is bringing water through the project. Hydrants must be placed within 100 feet of FDC for each building that requires FDC. Easements Required? Yes: © No: ❑ NOTE:easements may not overlap any permanent structure including but not limited to carports,trash enclosures, trees,shrubs, buildings,etc. Service lines up to the meter pit must be in ROW or covered by an easement. Notes: Easements will be required for all public mains outside of ROW. Is the project within 500 feet No Is this a commercial No of a re-use main? project? If both reuse questions are"yes" provide the following information: Building use(manufacturer,carwash,etc.), hours of operation, approximate business water usage and irrigable landscape area: Floodplain or other hazards? Yes: ❑ No: X❑ Notes: No known floodplain or hazards. Irrigation District: Settlers Irrigation District Notes: Primary source of irrigation must be surface water(irrigation district), a secondary source is required (well or City water)for shoulder season water.A single point cross connection to City water is required if used. 1 1 P a g e C�/WERIDIAN -- Public streetlights required? Yes: ❑x No: ❑ Notes: All public roadways will be required to have streetlights. Submittal of Civil Infrastructure requirements: The civil infrastructure be submitted with the final plat(or earlier if you'll be submitting building permits ahead of final platting). Additional Meeting Notes: Easement or water will be required to be extended to the East property line for property to the East. Any unused services or mains must be abandoned per current specs. 2 1 P a g e